NEPA/404 MERGER TEAM MEETING AGREEMENT
Concurrence Point No. 2a: Bridging Review
Project Title: US 421/US 321 from US 321 Junction to SR 1107 (NC 105 Bypass), Watauga Co.
STIP No.: R-2615
WBS No.: 44385.1.3
The Project Team concurred on this date of May 16, 2019, on the following bridging decisions
for widening of US 321/US 421 west of Boone.
Site Stream Recommended Structure
1 George Branch 1@6'x7' RCBC buried 1'
2 Brushy Fork 3@8'x13' buried 1'
3 Brushy Fork 3@7'x11' RCBC buried 1'
6 Brushy Fork Retain existing 1@25’ bridge
7 Brushy Fork 2@10’x6’ RCBC buried 1’
8 Brushy Fork 2@6'x8' RCBC buried 1'
9 UT to Brushy Fork 1@6'x6' RCBC buried 1'
Name Agency Date
_______________________________________FHWA_________________________________________
_______________________________________USEPA_________________________________________
_______________________________________USACE_________________________________________
_______________________________________USFWS________________________________________
_______________________________________NCDOT________________________________________
_______________________________________NCWRC________________________________________
_______________________________________NCDWR______________________________________
_______________________________________NCSHPO_______________________________________
_______________________________________HCRPO________________________________________