Loading...
HomeMy WebLinkAboutDraft CP2Aconcurrence form.docx NEPA/404 MERGER TEAM MEETING AGREEMENT Concurrence Point No. 2a: Bridging Review Project Title: US 421/US 321 from US 321 Junction to SR 1107 (NC 105 Bypass), Watauga Co. STIP No.: R-2615 WBS No.: 44385.1.3 The Project Team concurred on this date of May 16, 2019, on the following bridging decisions for widening of US 321/US 421 west of Boone. Site Stream Recommended Structure 1 George Branch 1@6'x7' RCBC buried 1' 2 Brushy Fork 3@8'x13' buried 1' 3 Brushy Fork 3@7'x11' RCBC buried 1' 6 Brushy Fork Retain existing 1@25’ bridge 7 Brushy Fork 2@10’x6’ RCBC buried 1’ 8 Brushy Fork 2@6'x8' RCBC buried 1' 9 UT to Brushy Fork 1@6'x6' RCBC buried 1' Name Agency Date _______________________________________FHWA_________________________________________ _______________________________________USEPA_________________________________________ _______________________________________USACE_________________________________________ _______________________________________USFWS________________________________________ _______________________________________NCDOT________________________________________ _______________________________________NCWRC________________________________________ _______________________________________NCDWR______________________________________ _______________________________________NCSHPO_______________________________________ _______________________________________HCRPO________________________________________