Loading...
HomeMy WebLinkAbout310363_30 day POA_20180124PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number. 31-363 County: Duplin Facility Name. Hwy. 41 Certified Operator Name: Joe Szaloky_ Operator Number. AWA999328 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon NameAD: 4118 4119 Spillway(`( or N): N N Levei(inches): 17 24 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Acton is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations Bolume and PAN content of waste to be pumped and hauled is reflected In section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. 'Attach a complete schedule with corresponding animal units and dates fro depopulation V animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: as conditions permit I hereby certify that I have reviewed the Information listed above and Included within the attached Plan of Action, and to the best of my knowledge and ability, the Information is accurate and correct. Advantage Farms LLC Phone: (910)293-3434 Facility Owner/Manager (print) Date: 1/2412018 Facility Owner/Manager (signature) F9 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 4118 line m = 307 0 lb PAN 2. Structure ID: 4119 line m = lb PAN 3. Structure ID, line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n.lines 1+2+3+4+5+6= 307.0lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p field # q crop r acres s. remaining IRR- 2 PAN balance (Ib/acre) t TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x a u. application w ndaW 10 Cover 4.13 30.00 123.9 Sept -April 11 Cover 1.17 30.00 35.1 Sept -April 12 Cover 1.65 30.00 49.5 Sept -April 1 Wheat 2.47 15600 385.3 Sept -April 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 593.8 lb. PAN IV. FACILITY'S PDA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 307.0 lb. PAN PDA (30 Day) 2121/00 x. Crop's remaining PAN balance (line v from section III) = 593.8 lb. PAN y. Overall PAN balance (w - x) _ -287 lb. PAN Line y must show as a deficit If line y does not show as a deficit, list course of action here Including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide Information regarding the herd population and lagoon freeboard levels at the receiving facility. Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is available for pumping if needed. - Remaining PAN is an estimation. Grower did not provide remaining PAN or updated WA. PoA (30 Day) 2121/00 ✓' J PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure NamelIdentifier (ID): 14118 2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 17.0 inches 24.0 inches 7.0 inches 42300 ft2 184569 gallons 180 days g. volume of waste produced according to structural design 39561 ft3 h. current herd # 1200 certified herd # 1200 actual waste produced = current herd # x line g = 39561 ft3 certified herd # i volume of wash water according to structural design I. excess rainfall over evaporation according to design k. (lines h + i + j) x 7 48 x 30 days/line f= 4 Total PAN to be land applied during draw down period I. current waste analysis dated 10/18/2017 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) Oft3 24675 ft3 80081 gallons 1 16 Ibs/1000 gal. 307.0 lbs. PAN PoA (30 Day) 2/21/00 J PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 14119 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/if 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 24.0 inches 19 0 Inches -5 inches 66000 fie -205700 gallons 180 days g. volume of waste produced according to structural design 80705 if h. current herd # 3648 certified herd # 3648 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated F 10/18/2017 T. ((lines e + k)/1000) x line I = REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 80705 ft' Offs 38500 if 148609 gallons �lbs/1000 gal. 0 lbs. PAN PoA (30 Day) 2/21/00