Loading...
HomeMy WebLinkAboutEmail RE Construction Stormwater NOI Not Accepted - 10563Georgoulias, Bethany From: laserfiche@ncdenr.gov Sent: Thursday, May 02, 2019 8:56 AM To: Aaron.Weldon@duke-energy.com Subject: Construction Stormwater NOI Not Accepted This email is to notify you that your application for PNG Line 439 - Winterville, NCwas not accepted for the following reason: The information uploaded did not include a letter of approval from DEQfor Project #Pitt-2019-017 but was instead the E&SC Plan. Also, the Index number entered for 15.b was "NEU, TAR" which are River Basin abbreviations -- not index numbers, and the entry noted two rivers. Please enter each *separately* (indicate stormwater will flow to additional waterbodies to do this). Please resubmit an NOI with these items addressed. For questions, please contact Bethany Georgoulias at 919-707-3641. Please contact The Stormwater Program Administrative Assistant for more information at (919) 707-3640. Please reference NOI application no. 10563 and Project ID NCC-PITT-2019-PNG Line 439 - Winterville, NC.