Loading...
HomeMy WebLinkAbout310305_Compliance Inspection_20180702II (9 Division of Water Resources V Facility Number j ( - E O Division of Soil and Water Conservation O Other Agency for Visit: OfRoutine O Date of Visit: Farm Name: Owner Name: Mailing Address: Physical Address: Referral O Other 0 Denied Access Arrival Time: Departure Time: County: Region: Owner Email: Phone: Facility Contact: (� //Title:� Onsite Representative: r/tc c� ^i / g01+ti fey 4 Certified Operator: Back-up Operator: Location of Farm: Swine W eau to F i -Wean to Ft Feeder to F Farrow to ` Farrow to 1 Other Other Latitude: Phone: Integrator: Certification Number: / 71 fS Certification Number: Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. La er lno S'L7I INon-La er Design Current Discharees and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? Longitude: Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow [—]Yes do ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE d. Does the discharge bypass the waste management system? (If yes, notify DWR) [:]Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes ❑ No ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes FfNo ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 21412015 Continued Facility Number: jDate of Inspection: 2 Waste Collection & Treatment 4. Is storage gapacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes ❑'lap ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): J _ 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes [Nb—'❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes ❑'lZo—❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? [:]Yes 0<0�0 NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes ❑-No —O NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ❑ ?Io ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes Q-NU- ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes 040-�E] NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? 15. Does the receiving crop and/or land application site need improvement? 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acres determination? 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment? Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropriate box. ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Yes 0 No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes ,[D'No ❑ NA ❑ NE ❑ Yes §Noo NA ❑ NE ❑ Yes ❑ NA ❑ NE ❑ Yes L21 ❑ NA ❑ NE ❑ Yes �o ❑ NA ❑ NE ❑ Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. [-]Yes ❑�>o ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ludge Survey 22. Did the facility fail to install and maintain a rain gauge? [:]Yes No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA NE Page 2 of 3 21412015 Continued Facili Number: • I Date of inspection: 2 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ErNo ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes [315o [] NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No l 3 A - ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes FZIo ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑'KO' ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes [21�o ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes 12 1 ❑ NA ❑ NE Comments (refer to question ft Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional a es as necessary). p (_� ki\t � e �,j -r- C Reviewer/Inspector Name: 0, t L` 1 " __L- t Reviewer/Inspector Signature: �1-- -c 1 Page 3 of Phone: -7(4 -7% %3A ! Date: 2- 21412015