HomeMy WebLinkAbout310261_30 day POA_20180601,T/lIG '� �2&8 C06 sg 31-2L� vwk4ej UII ►� PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number. 31-261 NC j County: Duplin Facility Name: Next Generation Family Ventures Certified Operator Name: Nick Edwards Operator Number: 996567 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: NG1 Spillway(Y or N): N Level(inches): 1 g 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevation for Mr Edwards structure. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWO prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. 'Attach a complete schedule with corresponding animal units and dates fro depopulation 'if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 6/8/2018 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Nick Edwards Phone: 910 298-3012 Facility Owner/Man r (print) Date: 6/1/2018 Facility Owner/Manager (signature) IL TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: NG1 line m = 777.0 lb PAN n.lines 1+2+3+4+5+6= 777.0lbPAN Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PE o. tract # p. field # q, crop r. acres S. remaining IRR- I. TOTAL PAN 2 PAN balance BALANCE FOR U. application (Ib'acre) FIELD jibs,) 6607 column r x s 1A Bermuda 4.48 147.00 658.6 3/1--10/31 6607, 1R Rormi,A� 5341 3A Bermuda G'S4 119.00 302.3 5341 3B Bermuda 1 76 109.00 191.8 5341 3C Bermuda 3.25 157.00 510.3 5341 3D Bermuda 3.38 200.00 676.0 5341 4A Bermuda 5.29 .00 1 5341 4B Bermuda 1.72 152 152.00 261.4 614 5341 do 3.48 117.00 407.2 State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) _ IV. FACILITY S PDA OVERALL PAN BALANCE W. Total PAN to be land applied (line n from section 11) = PDA (30 Day) 2/21100 4875.9 lb. PAN 777.0 lb. PAN X- CrOP's remaining PAN balance (line v from section 111) 4875.9 lb. PAN Y- Overall PAN balance (w - x) -4099 lb. PAN 'Jjle Y must as a deficit. If line y does not show as a deficit, list course of action here including pump and hau l, 1, de population, J�opIlation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new'PAN PAN balance table and recalculate the OveraWPAN balance. e basedtoon new information- If new fields are to be included as an option forlowering lagoon level, add these ,Ids the ce. If animal waste is to be hauled to another permifted,faclifty, provide information regarding the -herd Population and lagoon freeboard levels at the �receiving facility. POA (30 Day) 2/21/oo PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD 1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr.124 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft` 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 18.0 inches 19.0 inches 1.0 inches 71760 ft2 44730 gallons 180 days g. volume of waste produced according to structural design 942$8 ft3 h. current herd # 1640 certified herd # 288p actual waste produced = current herd # x line g = 53692 W certified herd # I. volume of wash water according to structural design fta j. excess rainfall over evaporation according to design L 43604 ft3 k. (lines h + i + j) x 7.48 x 30 days/line f= 121295 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated L 4/13/2018 4.68 Ibs/1000 gal. m. ((lines e + k)/1000) x line I = 777.0 fbs. PAN PoA (30 Day) 2121/Oo