Loading...
HomeMy WebLinkAbout1982_MOD_Plans_Slope Stability_20150518JKE JERGY )y Carolinas -EAM STATION )RTH CAROLINA SHEET IG CONDITIONS PLAN ?RING/EXCAVATION PLAN - - DEWATERING/ LTION PROGRESSION Uj I �m ' cn9 b s Z a O x a F CC N Z Q V v N cc N W J W W J LLI W Q DUKE ENERGY CAROLINAS EXCAVATION PRO Cr OWNER/DEVELOPER DUKE ENERGY CAROLINAS ASHEVILLE STEAM STATION 200 CP&L DRIVE ARDEN, NC 28704 (828) 687-5201 CONTRACTOR CHARAH. INC 12601 PLANTSIDE DRIVE LOUISVILLE, KY 4-9 (502) 245-1353 ENGINEER FRANKLIN S. CRAIG, RE ® W CONSULTING ENGINEER. 2543 GLENEAGLES DRIVE PER CRE YOV DIG O (704)GASTNIA,812 37 28056 (704) 813-3764 S T O P M�/ l^i W CALL 1 B00 632-4949 N BEY W N. C. ONE ALL CENTER IT'S THE LAW m Z NN N Z � W REF.: CAROLINA ASHEVILLE S.E.P. POWER PONDIGHT CO. ,--- �C-..-r-�a W , EXPANSION PLANS, LATEST REV. 01/15/0, J O 1982 ASH POND DAM ISSUED FOR CONSTRUCTION V DAM ID: BUNCO-089 DUNE 24, 2013 0 ISSUE DATE: JUNE 17, 2013 ^^ REVISIONS DESCRIPTION N0. DATE DESCRIPTION SCALE: 1 ".=1 OOP 1. 10 4 2014 JREVISED PLAN TO ALLOW EXCAVATION ALONG THE 'B2 DAM FACE 2 01 23 15 REVISED PER ABSAT COIAYENTS 0 50 100 200 VICINITY MAP NIB SYMBOL LEGEND IPON PIN FOUND IRON PIN SET IRON P:N SET =F(F)Q P-K. NAIL FOUND FIRE HIVRANT ` C TELEPHONE PEDESTAL OVE PHEAD UTILITI' =v UTILITY POLE {z LIGH1 POLE xv ® WATER VALVE ® SANITARY SEWER MANHOLE —1 SANITARY SEWER LINE —W— WATER LINE uE— UNDERGROUND ELECTRIC —uT UNDERGROUND TELEPHONE :— GAS LINE -- DRAINAGE DITCH/WATER COURSE APPROX. TREE/SHP.US LINE CHAIN LINK FENCE 'o.■ BASIN _ . :_ET ;-ET TEMPORARY STONE FILTER Q SEWER CLEANOUT FLOW DIRECTIONAL ARROWS TEMPORARY ROCK CHECK DAM DENUDED/CONSTRUCTION LIMITS TEMPORARY SLT/CONSTRUCTION FENCE EXISTING DRAINAGE STRUCTURE & PIPE CURB & GUTTER — — — - — -602XISTING E CONTOURS 602 PP.OPOSEO CONTOURS SEDIMENT BASIN PROPOSED SIDEWALK --- PROPOSEC HEAVr-DUIt ASPHALT L— TEMPORARY CONSTRUCTION ENTRANCE ENGINEERS NOTES: 1. The Engineer has made all possible oU—pbs to locale -istiN utditea. It ie the CONTRACTOR'S neponelbilily to Field verify the locotiona of PII u11fiti- prior to construction oM to sale airy ...Wick. Any damage to tifies incurred during construction is the reeponslbilRy of the DDNTRALTOR and is I. be repaired in a Umely and of the CONTRACTOR'S e-perue. CdI Comfino one -Coil at kcal 48 noun ,,,, Is digging (sxcludes eeekenda oM hdidaye) of 1-BOD-(32-4949. Duke Ener ASHEVILLE S ASHEVILLE, N CS COl 1.0 EXI 1.1 DE1 1.2 PR( EX( X L a— `qµL...LA ? S�C r VICINITY MAP NTS SYMBOL LEGEND IPT� ® IRON PIN FOUND U�ITDQ ON PIN SET IP(sD ® IRON PIN SET °KIT P-K NAIL FOUND „yp FIRE HYDRANT v ❑ TELEPHONE PEDESTAL OVERHEAD UTILITY a° Q UPLI TY POLE (i LIGHT POLE ED WATER VALVE CS) SANITARY SEWER MANHOLE .5 SANITARY SEWER LINE WATER LINE aE U'NDERGROUND ELECTRIC aT UNDERGROUND TELEPHONE G— GAS LINE — DRAINAGE DITCH/WATER COURSE ..�.�.���..�./ APPROK. TREE/SHRUB LINE CHAIN LINK FENCE CATCH BASIN u. ■ DROP INLET TEMPORARY STONE FILTER 0 SEWER CLEANOUT ROW DIRECTIONAL ARROWS TEMPORARY ROCK CHECK DAM e� DENUDED/CO.NSTRUCION LIMITS TEMPORARY SLT/CONSTRUCTION FENCE E%ISPNG DRAINAGE STRUCTURE & PIPE CURB & GUTTER - — -602— — — EXISTING CONTOURS —602— PROPOSED CONTOURS SEDIMENT BASIN FPROPOSED SIDEWALK PROPOSED HEAVY-DUTY ASPHALT - —JJJI TEMPORARY CONSTRUCTION ENTRANCE ENGINEER'S NOTES: 1. The Engineer has made all possible attempts to locate e.Istla, utllitlea. R I. the CONTRACTOR'S Tespa-ibilily to field verify the lecotbns of all atibliee Prior to construction Orb to note a"y conflicts. Any damage to alilNiee inoorred ding eolreltuclion b the ..."rebifdy of the anal is to be P.i4' d in o Dandy and at the CONTRACTOR'S e.' — Call Carolina one -Call at kosl 40 hours Pno, to diggiaq (e. .ales Weekends and holidoys) al 1-800-632-4949. DtJKE ENERGY _-.. Duke Enerigy Carolinas ASHEVILLE S-FEAM STATION ASHEVILLE, NORTH CAROLINA SHEETINDEX CS COVER SHEET 1.0 EXISTING CONDITIONS PLAN 1.1 DEWATERING/EXCAVATION PLAN 1.2 PROFILE - DEWATERING/ EXCAVATION PROGRESSION E C p LAN® `h DUKE ENERGY CAROLINAS EXCAVATION PROJECT OWNER/DEVELOPER DUKE ENERGY CAROLINAS ASHEVILLE STEAM STATION 200 CP&L DRIVE ARDEN, NC 28704 (828) 687-5201 CONTRACTOR CHARAH, INC. f2601 PLANTSIDE DRIVE LOUISVILLE, KY 40299 (602) 245-1353 ENGINEER FRANKLIN S. CRAIG, P.E CONSULTING ENGINEER. 2543 CLENEAGLES DRIVE BEFORE you DIG (704)GASTOIA,813 37 28056 (704) 813-3764 S T 0 P CALL 1 800 63 ,- ,,, N.C. ONE -CALL CENTER IT'S THE LAW REF.: CAROLINA POWER & LIGHT CO. ASHEVILLE S.E.P. ASH POND EXPANSION PLANS, LATEST REV. 01/15/07 1982 ASH POND DAM DAM ID: BUNCO 089 SCALE: 1 "=100' 0 50 100 2DO E2 ISSUED FOR CONSTRUCTION JUNE 24, 20" Q ISSUE DATE: JUNE 17, 2013 REVISIONS Nn GATE - DESCRIPTION �P+ V W 12 Z CC W N L W m Z N Z CC a a W cv j' '0'+ 50 V+ V C O • I da�pp o Y/ a.4m N — m r" m m rM MaV za n O oa Z N wudldos30 sNosin3a HMO 'Ll 3Nn' :31V4 InSSI V £ LOZ '4Z 3Nnf NOILOna1SNOO 80J 03nSSI ME1H96890YL0T VON dols M MIA 3WnS OOz 001 OS 0 01 1 ,00 L L •31VOS 31Y0 JN 690-OONn9 .01 WVO TWO NISVB HSV Z9, 3H.L 9NIONV038 S-11V130 IVNOLLIOOV NOd L01900 'NOISIA38 ISRTI 'SNVId NOISNVdX3 ONOd HSV 'd'3'S 31-IA3HSV "03 1H911 V N3MOd VNIIONVO 30N3N3A38 'Z 31LOZ H38VW 'ONIA 8nS ONM Jl9 0301AONd VIVO A3A8ns 'l :S31ON ]VO i3S INVO ONOd HSV Z96L MPONd TO 03N33NpN3 M3N 3NL NO! c Ainun A 03LYOOl3N 110 03110N3N 39 01 033N AV" ML 'O13 S7Y16303d 3NOHd3731 'SAYM3AN10 'SN3l3N '6310d NY 31YNN7N000 Y3tlV lO3fONd - NI 53NNLY3d 316 ONY s311E7Ln ONLLSOO TY AdIN3A Ol NOlOtlNlNOO „ Nd SNOLIGN00 ONIlSIX3b o ice---, m / \ r x 9,99XZ \ X s33& 3SN 30 \ � air 1r - 9't91Z / n — \ I \III 9'91ZZ / ZODU S33. 3510099 s aASH3(j o NOWIS d 36N3O , ,- ,- ,,� , ,— ,--, —, �, --. ; , �i , / / / / /, �/ / zsx3 \ �I 4'99:Z ,/ i I (Ii"I I \4+ ` -'' •'/ i ' dVW kUNIDIA N0110 rua- 9-Pe1a— 533lLL 35N30 9661Z.qus d / / �' s.e%tz rfi91z 9'63IZ- cs 6 O912 \_ f E'ota 1'S9tz r l't9t S'B9lZ ,� X 3 iIdN3015 `mow OYLIC�e.�-°n ,. �'I o ) � ( n,i] ---- ' II `- 9 It NO-183s30 SNOI6N.38 £L0Z 'LL 3Nn :31Va 3nssi £LOZ'bZ 3Nnf Nouon 11SNOO 2JOd 43nSSl OOZ OOL 09 0 L0/SL/LO A38 1S31V, 'SNV,d NOISNVdX3 .z ONOd HSV 'd'3'S 311IA3HSV ,OO L=„ L -31VOS '00 1H0I1 V 83MOd VN1108VO :'338 17 oN Z 690-00Nna gal vivo WVa aNOd HSV ZS6l, 0 m v n ao !�-- nm m Z Jm z AA ,wZY/ Z n M \ C - am 9'f9lZ Z A NOIltl13O3A ONIHSII8V1S3 x seiz NI 301V (INV 3dOIS 3H1 1O310ad Ol aW3033N 38 AV SV 0311V1SNi 38 AVW 13NNV18 IOa1NOO NOIS083 ^� '83AVl IIOS 31,11 d0 NOISOa3 31VOWN (INV 3dO1S 3Hl NIVINIVW 01 03a33N Stl 3dO1S 3H1 31V1303A a SIIOS a3A00 d0 83AVI HONI ZL WnWINIW V IIVISNI IIVHS 801OVaNOO 3H1 'SV36V 3S3H1 NI 03HS118V1S3 SI NIVW38Ol 3dOIS 110S IVNid 3H1 SV 'ZL ('bLOZ '£Z AVW 031Va ' 3NI 'S3100IONH031 HOV81030 A8 a3NVd38d 831.L31 SNOISn13NO0 0NV NOLL03dSNl :'.338) '3an10na1S IIVAInO 3Hl Woad AVMV S31LIALLOV NOL13na1SNOO ANV 133NIo 01 ddo o3dO8 j ONV 030OV1d 38 11VHS 83dd68 3H1 '38n10nalS 11V31nO ONLLSIX3 3Hl. ONnoav ,09 1Sv31 1V Jo 83ddn8 V ONIOVId A8 3an13nals IlvdlnO 3H1 N v 01 30VWV0 d0 A11118ISSOd ANV 31VOLLIW '3an1ona s 11Vdlno 3H1 ONnoav 03HSI18V1S3 N338 SVH oNnO89 x x 991zz C 1VaIMVN 30NO 'V38V 3H1 NI NOIIVAVOX3 HSV A8 c 038an1S10 Al1NVOIAINDIS 80 a31VAVOX3 38 ION -11IM ONV SltlIa31VIN N3Hlatl3 318V1S NI ONV NO A1103NI0 m -IL c m S8V38 NOLLVONnOA 3an10na1S 11V31n0 ONIISIX3 3141 'NISV8 3H1 d0 a3AMa3d / x Z'6fitZ 'd0 N m 3H1 ONOIV a0 3SV8 3H1 Woad SIIOS ANV '03a31NnO3N3 /' x 31VAVOX3 10� N338 SVH 30VA Z WVa 3H1 ONOIV IIOS N3HM 3Aa3S80 01 a311OdS / m m m V a01Va3dO 1N3WdInO3 3H1 3a1A0ad (INV13N0n8 NO1VAVOX3 3O03-Hl00WS V ONISn 30VA / ttz C WVa 3H1 WOad HSV 3AOW3a '(L:Z) IdolS 80 NOIIVNIIONI 30Vd N WV0 ONLLSIX3 3Hl ONINIVINIVW '30Vd WVa 3H1 ONOItl 9'981Z x S't91 Z 6W.ML` Ll t'S94Z L• ♦♦♦♦♦♦♦♦♦♦♦♦Xt WPIAN AM ♦ �► ♦ ♦ ♦ ♦ ♦ . ♦ ♦ P `I� ��Ll.�.♦A� ��2:��AG� s:�♦ids!.♦!��♦ice♦N:♦�♦�s:� I' /4' ♦�♦♦�♦♦�♦♦�♦♦AAA♦♦�♦� '� _p"gagg now ,*Igo ANN .♦ g "� 33Vd8nS HSV 3H1 IVRL 1NIOd 3H1001003AOV438 N338 SVH NISVG 83MOI 3H1 NIH11M31 aVM IVWNI 3H1 30NO ,w NOLLV83dO HOl1O WIa 1,9, M3N 3Hl Ol a39HVH3S10 38 Ism V3aV NOLLVAVOX3 3H1 NOad 03A0W3a 'SV3aV O 831VM IIV NOLLVAVOX3 3H1 HOW 831VM 3Hl 3AOW38 01 03Sn SdWnd 80/0NV S113M 3Hl 01 NIVaO 01 SNISVG a3MOl ONV 83ddn 3H1 H108 NO 30Vdans HSV 3111 30VNO ONV S1a0dd3 NOLLVAV3X3 3H1 1nOHOnoaHl S1a0dd3 ONIa31VM1a 13V '6 u 3sN3° O 181SS3 031IWII NWO SNonal dWno 3118V 3H1 Wnun ,w N O1 a33N 1111S AVW V3aV NOILVAVOX3 3H1 d0 S1aVd Z 3WOS 1MOd8IV 3141 1V 1N3Y433VId 80d 1N31NO0 38n1S10W 318V1d303V NV S1N3S38d HSV 3H1 SV ONOI SV 'ONIOVOI 103a1a 80d SV38V NOILVAV3X3 3Hl SS330V AVW SNoml dYVnO &0 3H1 '3AOadW1 SV3aV NOIIVAVOX3 3H1 NI 3VaO8nS HSV 3Hl SV '8 'V38V 1noov01 r S,fY�HN y ONV 311clAXIS 1NV030 3H1 01 03InVH ONV 03AOYM ' 3aibA `s SI IVI831VH 383HM SXonal dwna avow—dd0 'Sa01VAV3X3 ° + i = 3118tl ONtl Sa3Z00 H3tl3a—ONOI d0 969GL 3sn 3Hl 3AIOANI IIIM AIIVILINI S1a0dd3 NOLLVAV3X3 'L NISV8 HSV 3H1 d0 S1IWI1 3H1 NIHIVA 3WLL ANV 1V SIIOS ANV 31VAtl3X3 ION Oa '03831Nn03N3 38V S110S a0 aNno8g ltlanlVN ILLNn 11401108 ONtl S301S 8313NI83d (]Nod llV ONOIV S3nNI1NOO NOIIVAtl3X3 '9 'H01108 (]Nod 3H1 01 SMS3a00ad NOLLVAV3X3 SV S1N3W3a3Nl 100d-9 NI ONISVO 3H1 d0 d01 3H1 ONLLSnf Ov -n NOIIVAVOX3 3H1 1nOHOnoaH1 SdWnd aNV SONISVO 03110IS £ 3H1 ONISn HSV 3H1 ONIINVO30 3nNLLNOO •S x 'b V3aV NI NOLVA313 3H1 O1 1vn03 \,z L 4 4 ,� y d V / [��p6s�1Qf�� si�r4L[/py/(/]m 4y 'k/'�a'"ate \\ w \ \ LS �_ =A� la0dNIV 3NV 3N10 83NNI 3Hl ONV '£ (INV Z SV38V SSOHOV x sr a] rce¢ S30Va3 3H1 IILNn NOLLVAVOX3 3nNLLNO3 ONV NOIHSVA s 149 3sN3° Moans 3 i MVIMIS V NI 'MOIIV SUA31 a31VM SV £ V38V Ol 8 83AO Z V3aV NI S160dd3 NOLLVAV3X3 3H1 3nNILNO3 '4 'Z V38V d0 Slivin 3H1 SS080V NOLLVAVOX3 g; ONIMOIIV S830Nld ONLL0na1SN03 (INV DIM n 83NNI 3H1 Woad HSV ONIXVl Z V3atl NI XaOM NI938 C7 '30nS 1S8NISV8 83MOI 3H1 '£ NI SUA31 a31VM 3H1 SV 9,,/ -�x- 2'OOla3d NOIIVAVOX3 3H1 1nOHOnoNH_L I1I NISV8 Z8, 3Hl NIH11M HSV 3H1 ONI831VM30 a0d SdWnd H11M SONISVO a31101S „SL - £ d0 NOIIVIIVISNI a0d MOIIV Ol V3dV ONI0Nnomns oNV 3N10 83NNI NOW IVI83IVM HSV oNISn L V3aV 30VNO 'Z jT '3d1d� �p 11vd1nO 3H1 Honomi a31­118nd (INV X08 NOLLONnr 3H1 O1NI 831VM 30NVHOSI(l 'SdWnd ONISn ')ldH3 ILLNn Ava/,L d0 31Va V 1V NISV8 83MOI Z8, 831VM3a 'L ., NOISS32190dd N011VAV3X3 9NIa31VM30 1 NISV8 ONIIIIIS MyMos ffufu _J \\ X3 la0 Iv 0 - - / c'a9,s 1'691Z I8Od8ltl ONV S31VOS Ol x �t x s�lonalelno sil3n aNnosinowpS L E 1a0daIV -� x x 6'99tz t z HO I4 Ma I'S9tz t't9 S onal ONM ONI ss3a3r I 49 3G_13y3H_0 I x \ S'891L N3 30Nn8 1Mdld dV4hd �� 3JNr z ana of rru — 3NNJ/IMiS k b3-:0 'x3 / 999 � II \\ lZ II '6St�\� \ Ilb' , QBst M O III III � o III II o O x ZS I '9Lx lStZ IIIOVN1) / zss11 tl 4961 o II �C.7 x991 sut ddW kUNIDIA j 2190 2180 2170 2160 2150 2140 2130 2120 2110 2100 2090 2080 2070 0+00 III I '82 DAM 2:1 ORIGINAL DAM 2 E .: 2166.5 INCLINATION CUIIRENTLY E ?9N8 CAVATING —T0 — 151.0f I APPR X. ASH S RFACE INITI 4L 3:1 OTT -- -- ASH SURFACE K. DA.M FA E� AT 2.7 SLO f i i PPROXIMA E ASH BASIN REMOVE FROM 'D ASH M FACE SUBGRADE PROTEC NG DAM (SEE NO FE 10.) 1+00 2+00 3+DO 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 144'00 15+00 16+00 17+00 18+00 19+00 CAPOND PROFILE iCNE•'•-100' iHI •- a ro F25�4 TEMPORARY SEEDING A SEEDING MIXTURE SPECIES RATE (LB/Ai-RE1 RYE (GRAIN) 120 ANNUAL JAPANESE GRASS 50 �L sA \/ SEEDING DATES YOUNTAINS - FEBRUARY 15 TO MAY 15 /) SOIL AMENDMENTS FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPL'f 2,000 LB/ACRE GROUND � 2 AGRICULTURAL LIMESTONE AND 750 LS/ACRE 10-10-10 FERTILIZER MULCH APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING NTH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. n MAINTENANCE REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE AND MULCH 5 IMMEDIATELY FDLLOWING EROSION OR OTHER DAMAGE. NOTE: REFER Tfl MANUFACTURER'S GENERAL STAPLE PATTERN GARDE FOR COtRECT STAPLE PATTERN RECOMMENDATIONS FOR SLOPE NSTAIUTIONS. 1. PREPARE SOIL BEFORE INSTALLING BLANKETS HOLDING APPUCATION OF UME. FERTIU E . AND SEED. OR; WHEN USING CELLO -SEED DO NOT SEED PREPARED AREA. CELL-0-3ED MUST BE INSTALLED WITH PAPER SIDE DOWN. 2. BECIN AT THE TOP BF THE ROPE 81 ANCHORING THE BLANKET N B• DEEP X 6• W10E TRENCH. mmnu AND COMPACT THE TRENCH AFTER STAPLING. 3. ROLL THE BLMMETS (A) DOWN OR (B.) HORIZONTALLY ACROSS THE SLOPE. 4. THE EOCES OF PARALLEL BLANBEHS MUST BE STAPLED WITH APPROXMATELY 2. OVERLAP. E. WHR/1 BLANKETS MUST BE SI'LKID — TIff AOPE, PLACE BLANA2TS END OVER F1ID ((SHNCIE 1. S1KE) WITH APPROXIMATELY 4' OVIFLM. STAPLE TTROIOL OVERLAPPED AREA. APPR018YATELY 12• APART. ROLLED EROSION CONTROL BLANKET U scME-u.T.s 2190 2180 2170 2160 2150 2140 2130 2120 2110 2100 2090 2080 2070 20+DO SEEDING SCHEDULE 02. A Gran Seed: Fresh, tlea�dry, new aop seed complying will AOSA's (Aasociolian Olfltld Seed Amiyels) •Jwmd of Seed TecMdogy, Rdn for TeaUnqq sods• for purity and germmolim tdermcea. AD tee n paynaa pen 1000 aquae legit and a rates Gated bdor moy be wt by one hell fa Lempaay aovion cmUd mmsurea mly. 1. Septembm 15 to March 1: o. Open-field (anything 9,en thm on estobllshed lam). 1) Turi type tell Fe ( 10 The pen 1OGO at now 1—5 Ibs per of -ding) i� s33 IRFertniza (5-40-40) (ar ae rayuirea by sou molyala) 43 ,DO/ Lbne ( oc requbed be sou ondysb> 5 12f Superphosphate. ( a oar qubed by sal ondyab) A Opm-Gelds for slopese (2:1to roe pa 1a greater, O areas wblecl to eroem. 1)) Turl yteype�9' I Fescu000 st ner tome, 5 Ibs pa sl 3) RFertBiza (5-1Di0)( or os r.W" by wu analyaie) 5 12,Superphosphale( arYeae requteaaby e-11 2. August - December ( hen daNXne IemDaature le betwemyp1e) BO and 75 degrees and nighttime tampenalaa Is lass than 70 degrem) a. Opm - field (anything oUw thm m e Wbba ,d lawn). 1) Turf type tdl Feewe ( 10 lb. pa 1000 of new town.. 5 Ibe pa a 2) 2/ Sudan (uay, ,Nna ma July, mlr) 3 1 FwUl'rz m(rr1U-1o)( or as r,q l,,d by ma mdyela) 4 1Z U_( a os equlIN. c'soil dpb) 5 12/ Suparpho photo. ( squired by sal on lysis) b. Open -fleas far slopes 2.1 obgreaten, or a eas subject to erosim. 1) Turf t1 a tdl Fescue( 10 Ibe pen 1" a new lawns, 5 Ibs per of amq) 23 danllgizaos(5M1a,-0)n(e oarndae Aray mly) 40�atm.q.lebymu n.lys.) Lbne ( a os requbed by sal motyyssk) s 12/ Superphoaphala ( a as m imd by sad sooty.,') SOIL AMENDMENTS APPLY UME AND FERTILIZER ACCORDING TO SOIL TESTS, OR APPLY 4.000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND LOBO LB/ACRE 10-10-10 FERTILIZER. MULCH APPLY 4,00D LB/ACRE GRAN STRAW OR EQUIVALENT COVER OF ANOTHER SUITABLE MULCH. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR ROVING OR BY CRIMP- ING WITH A MULCH ANCHORING TOOL A DISK MTH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL MAINTENANCE REFERTILIZE IN THE SECOND YEAR UNLESS GROWM IS FULLY ADEQUATE. MAY BE MOWED ONCE OR TWICE A YEAR. BUT MOWING IS NOT NECESSARY. RESEED, FERTIL- IZE, AMID MULCH DAMAGED AREAS IMMEDIATELY. DEWATERING/EXCAVATION PROGRESSION: 1. DEWATER '82 LOWER BASIN AT A RATE OF 1'/DAY UNTIL EMPTY. USING PUMPS, DISCHARGE WATER INTO THE JUNCTION BOX AND FURTHER THROUGH THE OUTFALL PIPE. 2. GRADE AREA 1 USING ASH MATERIAL FROM INNER DIKE AND SURROUNDING AREA TO ALLOW FOR INSTALLATION OF 3 — 18" SLOTTED CASINGS WITH PUMPS FOR DEWATERING THE ASH WITHIN THE '82 BASIN THROUGHOUT THE EXCAVATION PERIOD. 3. AS THE WATER LEVELS IN THE LOWER BASIN SUBSIDE, BEGIN WORK IN AREA 2 TAKING ASH FROM THE INNER DIKE AND CONSTRUCTING "FINGERS" ALLOWING EXCAVATION ACROSS THE LIMITS OF AREA 2. 4. CONTINUE THE EXCAVATION EFFORTS IN AREA 2 OVER TO AREA 3 AS WATER LEVELS ALLOW, IN A SIMILAR FASHION AND CONTINUE EXCAVATION UNTIL THE GRADES ACROSS AREAS 2 AND 3, AND THE INNER DIKE ARE EQUAL TO THE ELEVATION IN AREA 4. 5. CONTINUE DECANTING THE ASH USING THE 3 SLOTTED CASINGS AND PUMPS THROUGHOUT THE EXCAVATION ADJUSTING THE TOP OF THE CASING IN 5—FOOT INCREMENTS AS EXCAVATION PROGRESSES TO THE POND BOTTOM. 6. EXCAVATION CONTINUES ALONG ALL POND PERIMETER SIDES AND BOTTOM UNTIL NATURAL GROUND OR SOILS ARE ENCOUNTERED. DO NOT EXCAVATE ANY SOILS AT ANY TIME WITHIN THE LIMITS OF THE ASH BASIN. 7. EXCAVATION EFFORTS INITIALLY WILL INVOLVE THE USE OF LONG —REACH EXCAVATORS, DOZERS AND ARTIC OFF —ROAD DUMP TRUCKS WHERE MATERIAL IS REMOVED AND HAULED TO THE DECANT STOCKPILE AND LOADOUT AREA. B. AS THE ASH SUBGRADE IN THE EXCAVATION AREAS IMPROVE, THE OTR DUMP TRUCKS MAY ACCESS THE EXCAVATION AREAS FOR DIRECT LOADING, AS LONG AS THE ASH PRESENTS AN ACCEPTABLE MOISTURE CONTENT FOR PLACEMENT AT THE AIRPORT. SOME PARTS OF THE EXCAVATION AREA MAY STILL NEED TO UTILIZE THE ARTIC DUMP TRUCKS GIVEN LIMITED ACCESSIBILITY. 9. MAINTAIN DEWATERING EFFORTS THROUGHOUT THE EXCAVATION EFFORTS AND GRADE THE ASH SURFACE ON BOTH THE UPPER AND LOWER BASINS TO DRAIN TO THE WELLS AND/OR PUMPS USED TO REMOVE THE WATER FROM THE EXCAVATION AREAS. ALL WATER REMOVED FROM THE EXCAVATION AREA MUST BE DISCHARGED TO THE NEW '64 RIM DITCH OPERATION ONCE THE INITIAL WATER WITHIN THE LOWER BASIN HAS BEEN REMOVED TO THE POINT THAT THE ASH SURFACE 11.. HAS BEEN EXPOSED. 10. TO ENSURE THE '82 REGULATED DAM IS NOT IMPACTED BY THE EXCAVATION EFFORTS, ESTABLISH THE ELEVATION OF THE INTERFACE OF THE ASH SURFACE ALONG THE DAM FACE, MAINTAINING THE EXISTING DAM FACE INCLINATION OR SLOPE (2:1). REMOVE ASH FROM THE DAM FACE USING A SMOOTH —EDGE EXCAVATOR BUCKET AND PROVIDE THE EQUIPMENT OPERATOR A SPOTTER TO OBSERVE WHEN SOIL ALONG THE DAM FACE HAS BEEN ENCOUNTERED. DO NOT EXCAVATE ANY SOILS FROM THE BASE OF, OR ALONG THE 2-PERIMETER OF THE BASIN. 11. SOIL COVER MATERIAL FOR FILL SHALL BE FREE FROM ROOTS, WOOD, OR OTHER ORGANIC MATERIALS. STONES LARGER THAN 4" MAXIMUM DIMENSION SHALL NOT BE USED IN THE EMBANKMENT FILL. USE SUITABLE EXCAVATED FILL MATERIAL FOR PLACEMENT ALONG THE EMBANKMENTS AS APPROVED BY THE GEOTECHNICAL ENGINEER. THE FILL MATERIAL SHALL BE PLACED USING AN EXCAVATOR BUCKET SPREAD IN LIFTS OF 3 TO 4 INCHES, PACKED IN PLACE USING THE SMOOTH SIDE OF THE BUCKET. REPEAT THE LIFT PLACEMENT UNTIL THE REQUIRED DEPTH OF FILL IS ACHIEVED. COMPACT THE FILL MATERIAL AS NECESSARY FOR THE FILL TO REMAIN ON THE SLOPE. VEGETATIVE COVER SHALL BE ESTABLISHED AS SOON AS PRACTICABLE, BASED UPON THE SEED MIX TABLES PROVIDED HEREON. I, I 1982 ASH POND DAM ISSUED FOR CONSTRUCTION DAM ID: BUNCO-082J I JUNE 24, 2013 ISSUE -' __ 17, 2013 REF.: CAROLINA POWER h LIGHT CO. EXCAVATION ON Q_i r- oI 23 2014 REVISED PLAN, TO ACCOST EXCAVATION ASHEVILLE S.E.P. ASH POND 2. D1 z3/zols REVISED PER ABSAi COMMENTS. EXPANSION PLANS, LATEST REV. 01/15/07 II: W ID U $zee U) � g U, z 0 LL rys, OE, SEp• r. tt t s Toe sEAL g t t T 17596 7 -; � •F �a:•o f �Nh•S.J,f'r� 7",. aO ZIIIIII. Occ /a N z V Q � W W cc toJ W J W W J H LLI W Q 7 °a z 0 �� V N ?W II• LLI 2 aIC z 0 3a vi C p z a� ,o m z Wa N z 44 �Q Lill 0 IL) co ,CV++ a W 1.2