DUKE ENERGY CAROLINAS EXCAVATION
PRO Cr
OWNER/DEVELOPER DUKE ENERGY CAROLINAS
ASHEVILLE STEAM STATION
200 CP&L DRIVE
ARDEN, NC 28704
(828) 687-5201
CONTRACTOR CHARAH. INC
12601 PLANTSIDE DRIVE
LOUISVILLE, KY 4-9
(502) 245-1353
ENGINEER FRANKLIN S. CRAIG, RE
®
W
CONSULTING ENGINEER.
2543 GLENEAGLES DRIVE
PER CRE YOV DIG
O
(704)GASTNIA,812 37 28056
(704) 813-3764
S
T O P
M�/
l^i W
CALL 1
B00 632-4949
N BEY W
N. C. ONE ALL CENTER
IT'S THE LAW
m Z NN
N Z �
W
REF.: CAROLINA ASHEVILLE S.E.P. POWER
PONDIGHT CO. ,--- �C-..-r-�a W ,
EXPANSION PLANS, LATEST REV. 01/15/0, J O
1982 ASH POND DAM ISSUED FOR CONSTRUCTION V
DAM ID: BUNCO-089 DUNE 24, 2013 0
ISSUE DATE: JUNE 17, 2013 ^^
REVISIONS DESCRIPTION
N0. DATE DESCRIPTION
SCALE: 1 ".=1 OOP 1. 10 4 2014 JREVISED PLAN TO ALLOW EXCAVATION ALONG THE 'B2 DAM FACE
2 01 23 15 REVISED PER ABSAT COIAYENTS
0 50 100 200
VICINITY MAP
NIB
SYMBOL LEGEND
IPON PIN FOUND
IRON PIN SET
IRON P:N SET
=F(F)Q
P-K. NAIL FOUND
FIRE HIVRANT
` C
TELEPHONE PEDESTAL
OVE PHEAD UTILITI'
=v
UTILITY POLE
{z
LIGH1 POLE
xv ®
WATER VALVE
®
SANITARY SEWER MANHOLE
—1
SANITARY SEWER LINE
—W—
WATER LINE
uE—
UNDERGROUND ELECTRIC
—uT
UNDERGROUND TELEPHONE
:—
GAS LINE
--
DRAINAGE DITCH/WATER COURSE
APPROX. TREE/SHP.US LINE
CHAIN LINK FENCE
'o.■
BASIN
_ .
:_ET
;-ET
TEMPORARY STONE FILTER
Q
SEWER CLEANOUT
FLOW DIRECTIONAL ARROWS
TEMPORARY ROCK CHECK DAM
DENUDED/CONSTRUCTION LIMITS
TEMPORARY SLT/CONSTRUCTION FENCE
EXISTING DRAINAGE STRUCTURE & PIPE
CURB & GUTTER
— — —
- — -602XISTING
E CONTOURS
602
PP.OPOSEO CONTOURS
SEDIMENT BASIN
PROPOSED SIDEWALK
---
PROPOSEC HEAVr-DUIt ASPHALT
L—
TEMPORARY CONSTRUCTION ENTRANCE
ENGINEERS NOTES:
1. The Engineer has made all possible oU—pbs to locale -istiN utditea. It ie
the CONTRACTOR'S neponelbilily to Field verify the locotiona of PII u11fiti- prior
to construction oM to sale airy ...Wick. Any damage to tifies incurred during
construction is the reeponslbilRy of the DDNTRALTOR and is I. be repaired in a Umely
and of the CONTRACTOR'S e-perue. CdI Comfino one -Coil at kcal 48 noun
,,,, Is digging (sxcludes eeekenda oM hdidaye) of 1-BOD-(32-4949.
Duke Ener
ASHEVILLE S
ASHEVILLE, N
CS COl
1.0 EXI
1.1 DE1
1.2 PR(
EX(
X L a—
`qµL...LA
? S�C
r
VICINITY MAP
NTS
SYMBOL LEGEND
IPT� ®
IRON PIN FOUND
U�ITDQ
ON PIN SET
IP(sD ®
IRON PIN SET
°KIT
P-K NAIL FOUND
„yp
FIRE HYDRANT
v ❑
TELEPHONE PEDESTAL
OVERHEAD UTILITY
a° Q
UPLI TY POLE
(i
LIGHT POLE
ED
WATER VALVE
CS)
SANITARY SEWER MANHOLE
.5
SANITARY SEWER LINE
WATER LINE
aE
U'NDERGROUND ELECTRIC
aT
UNDERGROUND TELEPHONE
G—
GAS LINE
—
DRAINAGE DITCH/WATER COURSE
..�.�.���..�./
APPROK. TREE/SHRUB LINE
CHAIN LINK FENCE
CATCH BASIN
u. ■
DROP INLET
TEMPORARY STONE FILTER
0
SEWER CLEANOUT
ROW DIRECTIONAL ARROWS
TEMPORARY ROCK CHECK DAM
e�
DENUDED/CO.NSTRUCION LIMITS
TEMPORARY SLT/CONSTRUCTION FENCE
E%ISPNG DRAINAGE STRUCTURE & PIPE
CURB & GUTTER
- — -602— — —
EXISTING CONTOURS
—602—
PROPOSED CONTOURS
SEDIMENT BASIN
FPROPOSED
SIDEWALK
PROPOSED HEAVY-DUTY ASPHALT
- —JJJI
TEMPORARY CONSTRUCTION ENTRANCE
ENGINEER'S NOTES:
1. The Engineer has made all possible attempts to locate e.Istla, utllitlea. R I.
the CONTRACTOR'S Tespa-ibilily to field verify the lecotbns of all atibliee Prior
to construction Orb to note a"y conflicts. Any damage to alilNiee inoorred ding
eolreltuclion b the ..."rebifdy of the anal is to be P.i4' d in o Dandy
and at the CONTRACTOR'S e.' — Call Carolina one -Call at kosl 40 hours
Pno, to diggiaq (e. .ales Weekends and holidoys) al 1-800-632-4949.
DtJKE
ENERGY
_-..
Duke Enerigy Carolinas
ASHEVILLE S-FEAM STATION
ASHEVILLE, NORTH CAROLINA
SHEETINDEX
CS COVER SHEET
1.0 EXISTING CONDITIONS PLAN
1.1 DEWATERING/EXCAVATION PLAN
1.2 PROFILE - DEWATERING/
EXCAVATION PROGRESSION
E C p
LAN® `h
DUKE ENERGY CAROLINAS EXCAVATION
PROJECT
OWNER/DEVELOPER DUKE ENERGY CAROLINAS
ASHEVILLE STEAM STATION
200 CP&L DRIVE
ARDEN, NC 28704
(828) 687-5201
CONTRACTOR CHARAH, INC.
f2601 PLANTSIDE DRIVE
LOUISVILLE, KY 40299
(602) 245-1353
ENGINEER FRANKLIN S. CRAIG, P.E
CONSULTING ENGINEER.
2543 CLENEAGLES DRIVE
BEFORE you DIG
(704)GASTOIA,813 37 28056
(704) 813-3764
S T 0 P
CALL 1 800 63 ,- ,,,
N.C. ONE -CALL CENTER
IT'S THE LAW
REF.: CAROLINA POWER & LIGHT CO.
ASHEVILLE S.E.P. ASH POND
EXPANSION PLANS, LATEST REV. 01/15/07
1982 ASH POND DAM
DAM ID: BUNCO 089
SCALE: 1 "=100'
0 50 100 2DO
E2
ISSUED FOR CONSTRUCTION
JUNE 24, 20" Q
ISSUE DATE: JUNE 17, 2013
REVISIONS
Nn GATE - DESCRIPTION
�P+
V
W
12
Z CC W
N L W
m Z N
Z CC
a a W
cv j' '0'+
50 V+ V
C
O • I
da�pp o
Y/
a.4m
N — m
r" m m
rM MaV
za
n O
oa
Z N
wudldos30
sNosin3a
HMO 'Ll 3Nn' :31V4 InSSI
V £ LOZ '4Z 3Nnf
NOILOna1SNOO 80J 03nSSI
ME1H96890YL0T
VON
dols
M MIA 3WnS
OOz 001 OS 0
01 1 ,00 L L •31VOS
31Y0 JN
690-OONn9 .01 WVO
TWO NISVB HSV
Z9, 3H.L 9NIONV038 S-11V130 IVNOLLIOOV NOd L01900
'NOISIA38 ISRTI 'SNVId NOISNVdX3 ONOd HSV 'd'3'S
31-IA3HSV "03 1H911 V N3MOd VNIIONVO 30N3N3A38 'Z
31LOZ H38VW
'ONIA 8nS ONM Jl9 0301AONd VIVO A3A8ns 'l
:S31ON ]VO i3S
INVO ONOd HSV Z96L
MPONd TO 03N33NpN3 M3N 3NL NO! c
Ainun A
03LYOOl3N 110 03110N3N 39 01 033N AV" ML 'O13 S7Y16303d 3NOHd3731
'SAYM3AN10 'SN3l3N '6310d NY 31YNN7N000 Y3tlV lO3fONd -
NI 53NNLY3d 316 ONY s311E7Ln ONLLSOO TY AdIN3A Ol NOlOtlNlNOO „
Nd SNOLIGN00
ONIlSIX3b
o
ice---,
m
/
\
r
x
9,99XZ
\
X
s33& 3SN
30
\
�
air
1r
- 9't91Z
/
n
— \
I
\III
9'91ZZ / ZODU S33. 3510099
s aASH3(j
o
NOWIS
d 36N3O , ,- ,- ,,� , ,— ,--, —, �, --. ; , �i , / / / / /, �/ / zsx3
\ �I
4'99:Z
,/ i I (Ii"I I \4+ ` -'' •'/ i ' dVW kUNIDIA
N0110 rua-
9-Pe1a—
533lLL 35N30
9661Z.qus d
/ / �' s.e%tz rfi91z 9'63IZ-
cs 6 O912 \_ f
E'ota 1'S9tz
r l't9t
S'B9lZ
,�
X 3 iIdN3015 `mow
OYLIC�e.�-°n ,. �'I o ) � ( n,i] ---- ' II `- 9 It
NO-183s30
SNOI6N.38
£L0Z 'LL 3Nn :31Va 3nssi
£LOZ'bZ 3Nnf
Nouon 11SNOO 2JOd 43nSSl
OOZ OOL 09 0 L0/SL/LO A38 1S31V, 'SNV,d NOISNVdX3
.z ONOd HSV 'd'3'S 311IA3HSV
,OO L=„ L -31VOS '00 1H0I1 V 83MOd VN1108VO :'338 17
oN Z
690-00Nna gal vivo
WVa aNOd HSV ZS6l,
0
m v
n ao
!�--
nm
m
Z
Jm
z
AA
,wZY/
Z
n
M \
C
-
am
9'f9lZ
Z
A
NOIltl13O3A ONIHSII8V1S3
x
seiz
NI 301V (INV 3dOIS 3H1 1O310ad Ol aW3033N 38 AV
SV 0311V1SNi 38 AVW 13NNV18 IOa1NOO NOIS083
^�
'83AVl IIOS 31,11 d0 NOISOa3 31VOWN (INV 3dO1S
3Hl NIVINIVW 01 03a33N Stl 3dO1S 3H1 31V1303A
a SIIOS a3A00 d0 83AVI HONI ZL WnWINIW
V IIVISNI IIVHS 801OVaNOO 3H1 'SV36V 3S3H1 NI
03HS118V1S3 SI NIVW38Ol 3dOIS 110S IVNid 3H1 SV 'ZL
('bLOZ '£Z AVW 031Va ' 3NI 'S3100IONH031 HOV81030
A8 a3NVd38d 831.L31 SNOISn13NO0 0NV NOLL03dSNl
:'.338) '3an10na1S IIVAInO 3Hl Woad AVMV
S31LIALLOV NOL13na1SNOO ANV 133NIo 01 ddo o3dO8
j
ONV 030OV1d 38 11VHS 83dd68 3H1 '38n10nalS
11V31nO ONLLSIX3 3Hl. ONnoav ,09 1Sv31 1V
Jo 83ddn8 V ONIOVId A8 3an13nals IlvdlnO 3H1
N
v
01 30VWV0 d0 A11118ISSOd ANV 31VOLLIW '3an1ona s
11Vdlno 3H1 ONnoav 03HSI18V1S3 N338 SVH oNnO89
x x
991zz
C
1VaIMVN 30NO 'V38V 3H1 NI NOIIVAVOX3 HSV A8
c
038an1S10 Al1NVOIAINDIS 80 a31VAVOX3 38 ION -11IM
ONV SltlIa31VIN N3Hlatl3 318V1S NI ONV NO A1103NI0
m
-IL
c
m
S8V38 NOLLVONnOA 3an10na1S 11V31n0 ONIISIX3 3141
'NISV8 3H1 d0 a3AMa3d
/ x
Z'6fitZ
'd0
N
m
3H1 ONOIV a0 3SV8 3H1 Woad SIIOS ANV
'03a31NnO3N3
/' x
31VAVOX3 10� N338 SVH 30VA
Z
WVa 3H1 ONOIV IIOS N3HM 3Aa3S80 01 a311OdS
/
m m
m
V a01Va3dO 1N3WdInO3 3H1 3a1A0ad (INV13N0n8
NO1VAVOX3 3O03-Hl00WS V ONISn 30VA
/
ttz
C
WVa 3H1
WOad HSV 3AOW3a '(L:Z) IdolS 80 NOIIVNIIONI 30Vd
N
WV0 ONLLSIX3 3Hl ONINIVINIVW '30Vd WVa 3H1 ONOItl
9'981Z
x
S't91 Z
6W.ML` Ll
t'S94Z
L•
♦♦♦♦♦♦♦♦♦♦♦♦Xt
WPIAN AM
♦ �► ♦ ♦ ♦ ♦ ♦ . ♦ ♦ P `I�
��Ll.�.♦A� ��2:��AG� s:�♦ids!.♦!��♦ice♦N:♦�♦�s:� I' /4'
♦�♦♦�♦♦�♦♦�♦♦AAA♦♦�♦� '�
_p"gagg now
,*Igo ANN
.♦ g
"�
33Vd8nS HSV 3H1 IVRL 1NIOd 3H1001003AOV438 N338
SVH NISVG 83MOI 3H1 NIH11M31 aVM IVWNI 3H1 30NO
,w
NOLLV83dO HOl1O WIa 1,9, M3N 3Hl Ol a39HVH3S10
38 Ism V3aV NOLLVAVOX3 3H1 NOad 03A0W3a
'SV3aV
O
831VM IIV NOLLVAVOX3 3H1 HOW 831VM
3Hl 3AOW38 01 03Sn SdWnd 80/0NV S113M 3Hl
01 NIVaO 01 SNISVG a3MOl ONV 83ddn 3H1 H108 NO
30Vdans HSV 3111 30VNO ONV S1a0dd3 NOLLVAV3X3
3H1 1nOHOnoaHl S1a0dd3 ONIa31VM1a
13V '6
u 3sN3°
O
181SS3
031IWII NWO SNonal dWno 3118V 3H1 Wnun
,w
N
O1 a33N 1111S AVW V3aV NOILVAVOX3 3H1 d0 S1aVd
Z
3WOS 1MOd8IV 3141 1V 1N3Y433VId 80d 1N31NO0
38n1S10W 318V1d303V NV S1N3S38d HSV 3H1
SV ONOI SV 'ONIOVOI 103a1a 80d SV38V NOILVAV3X3
3Hl SS330V AVW SNoml dYVnO &0 3H1 '3AOadW1
SV3aV NOIIVAVOX3 3H1 NI 3VaO8nS HSV 3Hl SV '8
'V38V 1noov01
r
S,fY�HN y
ONV 311clAXIS 1NV030 3H1 01 03InVH ONV 03AOYM
' 3aibA `s
SI IVI831VH 383HM SXonal dwna avow—dd0
'Sa01VAV3X3
° + i =
3118tl ONtl Sa3Z00 H3tl3a—ONOI d0
969GL
3sn 3Hl 3AIOANI IIIM AIIVILINI S1a0dd3 NOLLVAV3X3 'L
NISV8 HSV 3H1 d0 S1IWI1 3H1 NIHIVA 3WLL ANV
1V SIIOS ANV 31VAtl3X3 ION Oa '03831Nn03N3 38V
S110S a0 aNno8g ltlanlVN ILLNn 11401108 ONtl S301S
8313NI83d (]Nod llV ONOIV S3nNI1NOO NOIIVAtl3X3 '9
'H01108
(]Nod 3H1 01 SMS3a00ad NOLLVAV3X3 SV S1N3W3a3Nl
100d-9 NI ONISVO 3H1 d0 d01 3H1 ONLLSnf Ov
-n
NOIIVAVOX3 3H1 1nOHOnoaH1 SdWnd aNV SONISVO
03110IS £ 3H1 ONISn HSV 3H1 ONIINVO30 3nNLLNOO •S
x
'b V3aV NI NOLVA313 3H1 O1 1vn03
\,z
L
4 4 ,�
y
d V /
[��p6s�1Qf��
si�r4L[/py/(/]m 4y
'k/'�a'"ate
\\
w \ \
LS �_ =A�
la0dNIV
3NV 3N10 83NNI 3Hl ONV '£ (INV Z SV38V SSOHOV x sr a]
rce¢
S30Va3 3H1 IILNn NOLLVAVOX3 3nNLLNO3 ONV NOIHSVA s 149 3sN3° Moans 3
i MVIMIS V NI 'MOIIV SUA31 a31VM SV £ V38V Ol
8 83AO Z V3aV NI S160dd3 NOLLVAV3X3 3H1 3nNILNO3 '4
'Z V38V d0 Slivin 3H1 SS080V NOLLVAVOX3
g; ONIMOIIV S830Nld ONLL0na1SN03 (INV DIM
n 83NNI 3H1 Woad HSV ONIXVl Z V3atl NI XaOM NI938
C7 '30nS 1S8NISV8 83MOI 3H1 '£ NI SUA31 a31VM 3H1 SV 9,,/
-�x-
2'OOla3d NOIIVAVOX3 3H1 1nOHOnoNH_L
I1I NISV8 Z8, 3Hl NIH11M HSV 3H1 ONI831VM30
a0d SdWnd H11M SONISVO a31101S „SL - £ d0
NOIIVIIVISNI a0d MOIIV Ol V3dV ONI0Nnomns oNV
3N10 83NNI NOW IVI83IVM HSV oNISn L V3aV 30VNO 'Z
jT '3d1d� �p
11vd1nO 3H1 Honomi a31118nd (INV X08 NOLLONnr
3H1 O1NI 831VM 30NVHOSI(l 'SdWnd ONISn ')ldH3
ILLNn Ava/,L d0 31Va V 1V NISV8 83MOI Z8, 831VM3a 'L .,
NOISS32190dd N011VAV3X3 9NIa31VM30
1
NISV8 ONIIIIIS
MyMos
ffufu
_J \\
X3
la0 Iv 0 - - / c'a9,s 1'691Z I8Od8ltl ONV S31VOS Ol x
�t x s�lonalelno sil3n aNnosinowpS L E
1a0daIV -� x x 6'99tz
t z HO I4 Ma I'S9tz t't9
S onal ONM ONI ss3a3r I 49 3G_13y3H_0 I x
\ S'891L
N3
30Nn8 1Mdld dV4hd
�� 3JNr
z ana of rru —
3NNJ/IMiS k b3-:0 'x3 /
999 �
II \\
lZ II '6St�\�
\
Ilb' , QBst
M
O
III
III � o
III
II o
O x ZS I '9Lx
lStZ
IIIOVN1) / zss11
tl 4961
o II �C.7 x991
sut
ddW kUNIDIA
j
2190
2180
2170
2160
2150
2140
2130
2120
2110
2100
2090
2080
2070
0+00
III
I
'82
DAM
2:1 ORIGINAL
DAM
2
E
.: 2166.5
INCLINATION
CUIIRENTLY
E
?9N8
CAVATING
—T0
—
151.0f I
APPR
X. ASH S
RFACE
INITI 4L 3:1
OTT
-- --
ASH
SURFACE
K. DA.M FA
E�
AT 2.7 SLO
f
i
i
PPROXIMA
E ASH BASIN
REMOVE
FROM 'D
ASH
M FACE
SUBGRADE
PROTEC
NG DAM
(SEE NO
FE 10.)
1+00 2+00 3+DO 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 144'00 15+00 16+00 17+00 18+00 19+00
CAPOND PROFILE
iCNE•'•-100' iHI
•- a ro
F25�4
TEMPORARY SEEDING A
SEEDING MIXTURE
SPECIES RATE (LB/Ai-RE1
RYE (GRAIN) 120
ANNUAL JAPANESE GRASS 50
�L sA
\/
SEEDING DATES
YOUNTAINS - FEBRUARY 15 TO MAY 15
/)
SOIL AMENDMENTS
FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPL'f 2,000 LB/ACRE GROUND
�
2
AGRICULTURAL LIMESTONE AND 750 LS/ACRE 10-10-10 FERTILIZER
MULCH
APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING NTH ASPHALT, NETTING,
OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE
USED AS A MULCH ANCHORING TOOL.
n
MAINTENANCE
REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE AND MULCH
5
IMMEDIATELY FDLLOWING EROSION OR OTHER DAMAGE.
NOTE: REFER Tfl MANUFACTURER'S GENERAL STAPLE PATTERN GARDE FOR COtRECT
STAPLE PATTERN RECOMMENDATIONS FOR SLOPE NSTAIUTIONS.
1. PREPARE SOIL BEFORE INSTALLING BLANKETS HOLDING APPUCATION OF UME. FERTIU E .
AND SEED. OR; WHEN USING CELLO -SEED DO NOT SEED PREPARED AREA. CELL-0-3ED
MUST BE INSTALLED WITH PAPER SIDE DOWN.
2. BECIN AT THE TOP BF THE ROPE 81 ANCHORING THE BLANKET N B• DEEP X 6• W10E TRENCH.
mmnu AND COMPACT THE TRENCH AFTER STAPLING.
3. ROLL THE BLMMETS (A) DOWN OR (B.) HORIZONTALLY ACROSS THE SLOPE.
4. THE EOCES OF PARALLEL BLANBEHS MUST BE STAPLED WITH APPROXMATELY 2. OVERLAP.
E. WHR/1 BLANKETS MUST BE SI'LKID — TIff AOPE, PLACE BLANA2TS END OVER F1ID ((SHNCIE
1.
S1KE) WITH APPROXIMATELY 4' OVIFLM. STAPLE TTROIOL OVERLAPPED AREA. APPR018YATELY
12• APART.
ROLLED EROSION CONTROL BLANKET
U scME-u.T.s
2190
2180
2170
2160
2150
2140
2130
2120
2110
2100
2090
2080
2070
20+DO
SEEDING SCHEDULE 02.
A Gran Seed: Fresh, tlea�dry, new aop seed complying will AOSA's (Aasociolian
Olfltld Seed Amiyels) •Jwmd of Seed TecMdogy, Rdn for TeaUnqq sods• for
purity and germmolim tdermcea. AD tee n paynaa pen 1000 aquae legit and a
rates Gated bdor moy be wt by one hell fa Lempaay aovion cmUd mmsurea mly.
1. Septembm 15 to March 1:
o. Open-field (anything 9,en thm on estobllshed lam).
1) Turi type tell Fe ( 10 The pen 1OGO at now 1—5 Ibs per of
-ding)
i� s33 IRFertniza (5-40-40) (ar ae rayuirea by sou molyala)
43 ,DO/ Lbne ( oc requbed be sou ondysb>
5 12f Superphosphate. ( a oar qubed by sal ondyab)
A Opm-Gelds for slopese (2:1to roe pa 1a greater, O areas wblecl to eroem.
1)) Turl yteype�9' I Fescu000 st ner tome, 5 Ibs pa sl
3) RFertBiza (5-1Di0)( or os r.W" by wu analyaie)
5 12,Superphosphale( arYeae requteaaby e-11
2. August - December ( hen daNXne IemDaature le betwemyp1e)
BO and 75 degrees and nighttime tampenalaa Is lass than 70 degrem)
a. Opm - field (anything oUw thm m e Wbba ,d lawn).
1) Turf type tdl Feewe ( 10 lb. pa 1000 of new town.. 5 Ibe pa a
2) 2/ Sudan (uay, ,Nna ma July, mlr)
3 1 FwUl'rz m(rr1U-1o)( or as r,q l,,d by ma mdyela)
4 1Z U_( a os equlIN. c'soil dpb)
5 12/ Suparpho photo. ( squired by sal on lysis)
b. Open -fleas far slopes 2.1 obgreaten, or a eas subject to erosim.
1) Turf t1 a tdl Fescue( 10 Ibe pen 1" a new lawns, 5 Ibs per of
amq)
23 danllgizaos(5M1a,-0)n(e oarndae Aray mly)
40�atm.q.lebymu n.lys.)
Lbne ( a os requbed by sal motyyssk)
s 12/ Superphoaphala ( a as m imd by sad sooty.,')
SOIL AMENDMENTS APPLY UME AND FERTILIZER ACCORDING TO SOIL TESTS, OR APPLY 4.000 LB/ACRE
GROUND AGRICULTURAL LIMESTONE AND LOBO LB/ACRE 10-10-10 FERTILIZER.
MULCH APPLY 4,00D LB/ACRE GRAN STRAW OR EQUIVALENT COVER OF ANOTHER SUITABLE
MULCH. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR ROVING OR BY CRIMP-
ING WITH A MULCH ANCHORING TOOL A DISK MTH BLADES SET NEARLY STRAIGHT CAN
BE USED AS A MULCH ANCHORING TOOL
MAINTENANCE REFERTILIZE IN THE SECOND YEAR UNLESS GROWM IS FULLY ADEQUATE. MAY BE
MOWED ONCE OR TWICE A YEAR. BUT MOWING IS NOT NECESSARY. RESEED, FERTIL-
IZE, AMID MULCH DAMAGED AREAS IMMEDIATELY.
DEWATERING/EXCAVATION PROGRESSION:
1. DEWATER '82 LOWER BASIN AT A RATE OF 1'/DAY UNTIL
EMPTY. USING PUMPS, DISCHARGE WATER INTO THE
JUNCTION BOX AND FURTHER THROUGH THE OUTFALL
PIPE.
2. GRADE AREA 1 USING ASH MATERIAL FROM INNER DIKE
AND SURROUNDING AREA TO ALLOW FOR INSTALLATION
OF 3 — 18" SLOTTED CASINGS WITH PUMPS FOR
DEWATERING THE ASH WITHIN THE '82 BASIN
THROUGHOUT THE EXCAVATION PERIOD.
3. AS THE WATER LEVELS IN THE LOWER BASIN SUBSIDE,
BEGIN WORK IN AREA 2 TAKING ASH FROM THE INNER
DIKE AND CONSTRUCTING "FINGERS" ALLOWING
EXCAVATION ACROSS THE LIMITS OF AREA 2.
4. CONTINUE THE EXCAVATION EFFORTS IN AREA 2 OVER
TO AREA 3 AS WATER LEVELS ALLOW, IN A SIMILAR
FASHION AND CONTINUE EXCAVATION UNTIL THE GRADES
ACROSS AREAS 2 AND 3, AND THE INNER DIKE ARE
EQUAL TO THE ELEVATION IN AREA 4.
5. CONTINUE DECANTING THE ASH USING THE 3 SLOTTED
CASINGS AND PUMPS THROUGHOUT THE EXCAVATION
ADJUSTING THE TOP OF THE CASING IN 5—FOOT
INCREMENTS AS EXCAVATION PROGRESSES TO THE POND
BOTTOM.
6. EXCAVATION CONTINUES ALONG ALL POND PERIMETER
SIDES AND BOTTOM UNTIL NATURAL GROUND OR SOILS
ARE ENCOUNTERED. DO NOT EXCAVATE ANY SOILS AT
ANY TIME WITHIN THE LIMITS OF THE ASH BASIN.
7. EXCAVATION EFFORTS INITIALLY WILL INVOLVE THE USE
OF LONG —REACH EXCAVATORS, DOZERS AND ARTIC
OFF —ROAD DUMP TRUCKS WHERE MATERIAL IS
REMOVED AND HAULED TO THE DECANT STOCKPILE AND
LOADOUT AREA.
B. AS THE ASH SUBGRADE IN THE EXCAVATION AREAS
IMPROVE, THE OTR DUMP TRUCKS MAY ACCESS THE
EXCAVATION AREAS FOR DIRECT LOADING, AS LONG AS
THE ASH PRESENTS AN ACCEPTABLE MOISTURE
CONTENT FOR PLACEMENT AT THE AIRPORT. SOME
PARTS OF THE EXCAVATION AREA MAY STILL NEED TO
UTILIZE THE ARTIC DUMP TRUCKS GIVEN LIMITED
ACCESSIBILITY.
9. MAINTAIN DEWATERING EFFORTS THROUGHOUT THE
EXCAVATION EFFORTS AND GRADE THE ASH SURFACE
ON BOTH THE UPPER AND LOWER BASINS TO DRAIN TO
THE WELLS AND/OR PUMPS USED TO REMOVE THE
WATER FROM THE EXCAVATION AREAS. ALL WATER
REMOVED FROM THE EXCAVATION AREA MUST BE
DISCHARGED TO THE NEW '64 RIM DITCH OPERATION
ONCE THE INITIAL WATER WITHIN THE LOWER BASIN HAS
BEEN REMOVED TO THE POINT THAT THE ASH SURFACE
11..
HAS BEEN EXPOSED.
10. TO ENSURE THE '82 REGULATED DAM IS NOT IMPACTED
BY THE EXCAVATION EFFORTS, ESTABLISH THE
ELEVATION OF THE INTERFACE OF THE ASH SURFACE
ALONG THE DAM FACE, MAINTAINING THE EXISTING DAM
FACE INCLINATION OR SLOPE (2:1). REMOVE ASH FROM
THE DAM FACE USING A SMOOTH —EDGE EXCAVATOR
BUCKET AND PROVIDE THE EQUIPMENT OPERATOR A
SPOTTER TO OBSERVE WHEN SOIL ALONG THE DAM
FACE HAS BEEN ENCOUNTERED. DO NOT EXCAVATE
ANY SOILS FROM THE BASE OF, OR ALONG THE
2-PERIMETER OF THE BASIN.
11. SOIL COVER MATERIAL FOR FILL SHALL BE FREE FROM
ROOTS, WOOD, OR OTHER ORGANIC MATERIALS. STONES
LARGER THAN 4" MAXIMUM DIMENSION SHALL NOT BE
USED IN THE EMBANKMENT FILL. USE SUITABLE
EXCAVATED FILL MATERIAL FOR PLACEMENT ALONG THE
EMBANKMENTS AS APPROVED BY THE GEOTECHNICAL
ENGINEER. THE FILL MATERIAL SHALL BE PLACED
USING AN EXCAVATOR BUCKET SPREAD IN LIFTS OF 3
TO 4 INCHES, PACKED IN PLACE USING THE SMOOTH
SIDE OF THE BUCKET. REPEAT THE LIFT PLACEMENT
UNTIL THE REQUIRED DEPTH OF FILL IS ACHIEVED.
COMPACT THE FILL MATERIAL AS NECESSARY FOR THE
FILL TO REMAIN ON THE SLOPE. VEGETATIVE COVER
SHALL BE ESTABLISHED AS SOON AS PRACTICABLE,
BASED UPON THE SEED MIX TABLES PROVIDED HEREON.
I, I
1982 ASH POND DAM ISSUED FOR CONSTRUCTION
DAM ID: BUNCO-082J I JUNE 24, 2013
ISSUE -' __ 17, 2013
REF.: CAROLINA POWER h LIGHT CO. EXCAVATION
ON
Q_i r- oI 23 2014 REVISED PLAN, TO ACCOST EXCAVATION
ASHEVILLE S.E.P. ASH POND 2. D1 z3/zols REVISED PER ABSAi COMMENTS.
EXPANSION PLANS, LATEST REV. 01/15/07 II:
W
ID
U $zee
U) � g
U,
z
0
LL
rys,
OE, SEp• r.
tt t
s Toe sEAL g t t
T 17596 7
-; � •F �a:•o f
�Nh•S.J,f'r� 7",.
aO
ZIIIIII.
Occ
/a N z
V
Q �
W W
cc toJ
W J W
W J H
LLI
W Q
7
°a
z
0
��
V N
?W
II•
LLI
2 aIC
z 0 3a
vi C p z
a� ,o
m z Wa
N z 44 �Q
Lill 0 IL)
co ,CV++ a W
1.2