Loading...
HomeMy WebLinkAbout20141127 Ver 1_Year 0 Monitoring Report_2018_20180927FINAL AS -BUILT BASELINE MONITORING REPORT MUD LICK CREEK MITIGATION SITE Chatham County, North Carolina NCDMS Project No. 93482 Contract No. 7683 USACE Action ID No. SAW -2014-00736 & DWR Project No 2014-1127 SCO No. 1209857-01 Data Collection: July 2018 Submission: September 2018 r- PREPARED FOR: N.C. DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF MITIGATION SERVICES 1601 MAIL SERVICE CENTER RALEIGH, NORTH CAROLINA 27699-1601 FINAL AS -BUILT BASELINE MONITORING REPORT MUD LICK CREEK MITIGATION SITE Chatham County, North Carolina NCDMS Project No. 93482 Contract No. 7683 USACE Action ID No. SAW -2014-00736 & DWR Project No 2014-1127. SCO No. 1209857-01 Data Collection: July 2018 Submission: September 2018 r- PREPARED BY: AXIOM ENVIRONMENTAL, INC. 218 SNOW AVENUE RALEIGH, NORTH CAROLINA 27603 From: Hauot, Mac To: Tuawell, Todd J CIV USARMY CESAW (US); Schaffer, Jeff Cc: andrea.w.hughesCnbusace.army.mil; Kim Browning Subject: RE: [External] RE: Mud Lick Creek (DMS #93482) As -Built Baseline -Mitigation Plan Amendment Reuest Date: Thursday, November 01, 2018 10:13:07 AM Fine with me... -----Original Message ----- From: Tugwell, Todd J CIV USARMY CESAW (US) [mailto:Todd.J.Tugwell(usace.army.mil] Sent: Thursday, November 1, 2018 10:07 AM To: Schaffer, Jeff <jef .schaffer@ncdenr.gov>; Haupt, Mac <mac.haupt@ncdenr.gov> Cc: andrea.w.hughes@usace.army.mil; Kim Browning <Kimberly.D.Browning@usace.army.mil> Subject: RE: [External] RE: Mud Lick Creek (DMS #93482) As -Built Baseline -Mitigation Plan Amendment Reuest CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to Report Spam.<mailto:report.spam@nc.gov> OK, sounds good. Thanks -----Original Message ----- From: Schaffer, Jeff [mailto:jeffschaffer(c�r�ncdenr.gov] Sent: Thursday, November 01, 2018 10:06 AM To: Tugwell, Todd J CIV USARMY CESAW (US)<Todd.J.Tugwell@usace.army.mil>; Haupt, Mac <mac. haupt@ncdenr. gov> Cc: Hughes, Andrea W CIV USARMY CESAW (US) <Andrea.W.Hughes@usace.army.mil>; Browning, Kimberly D CIV USARMY CESAW (US) <Kimberly.D.Browning@usace.army.mil> Subject: [Non-DoD Source] RE: [External] RE: Mud Lick Creek (DMS #93482) As -Built Baseline -Mitigation Plan Amendment Reuest Todd, Thank you for getting back to me on this. Here are my responses to your questions: 1. Reductions made to channel leaving the easement? No, the easement boundaries were not changed from approved mitigation plan to as-built/baseline. For some unexplained reason, during their design Wildlands carried the channel measurements outside the easement and that was not discovered until the as -built survey was done. 2. Additional culvert added? No, there are only 2 crossings, both of which were shown in the approved mitigation plan, but the linear footage was not removed from the credit calculations by Wildlands. I did misstate in my memo in item 2d that the culvert was realigned on East Branch Reach 2 when the culvert is actually on North Branch Reach 3 (formerly North Branch Reach 2). 3. Updating of the approved mitigation plan - I have updated maps and an updated asset table that are includeed in the As -built Baseline Report (prepared by Axiom) and are based upon the as -built survey done by North State (contractor) and approved by Wildlands. The asset table in the As -built Baseline Report shows the mitigation plan assets (linear footage) as well as the as -built baseline assets and the differences are explained in footnotes and comments. I will also add a copy the DMS request memo and this email that documents the IRT concurrence with the requested changes behind the cover page of the As -built Baseline Report. Based on this email and if you are in agreement with my responses, I will update the assets in our database and have the As -built Credit ledger prepared, and provide hardcopies of the As -built Baseline Report to both you and Mac. Jeff Schaffer Eastern Supervisor, Project Management Division of Mitigation Services (Blockedhttps://deq.nc.gov/about/divisions/mitigation-services) NC Department of Environmental Quality (NCDEQ) (919) 707-8308 office (919) 812-2634 mobile Jeff. Schaffer@ncdenr.gov 217 West Jones St., Suite 3000A 1652 Mail Service Center Raleigh, NC 27699-1652 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. -----Original Message ----- From: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil> Sent: Thursday, November 01, 2018 9:03 AM To: Schaffer, Jeff <jef .schaffer@ncdenr.gov>; Haupt, Mac <mac.haupt@ncdenr.gov> Cc: andrea.w.hughes@usace.army.mil; Kim Browning <Kimberly.D.Browning@usace.army.mil> Subject: [External] RE: Mud Lick Creek (DMS #93482) As -Built Baseline -Mitigation Plan Amendment Reuest CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to Report Spam.<mailto:report.spam&nc.gov> Jeff, Mac and I discussed this yesterday. We don't necessarily have any problems with the changes you discuss, but it was not clear why were the reductions made for the channel leaving the easement - were the easement boundaries changed, and was an additional crossing added? We also need to make sure that we get the approved mit plan updated. Specifically, we need to make sure that we have updated maps and changes made to the credit determination (table 12 in the approved mitigation plan). I guess in this case these changes can be made in the as - built report, but we need to make sure that they are memorialized somewhere so when we get around to future credit releases, it is clear. I would also add a copy of this email, which concurs with the requested changes, to the record for the site. Thanks, Todd Tugwell Mitigation Project Manager Wilmington District, US Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 (919) 554-4884 ext. 58 -----Original Message ----- From: Schaffer, Jeff [mailto:jeff.schaffer cnie ncdenr.gov] Sent: Wednesday, October 31, 2018 9:41 AM To: Haupt, Mac <mac.haupt@ncdenr.gov>; Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace. army. mil> Cc: Hughes, Andrea W CIV USARMY CESAW (US)<Andrea.W.Hughes@usace.army.mil> Subject: [Non-DoD Source] RE: Mud Lick Creek (DMS #93482) As -Built Baseline -Mitigation Plan Amendment Reuest My original email sent on 9/27/18 had and amendment request letter attached. To save you all from hunting for the original email, please see the attached. Jeff Schaffer Eastern Supervisor, Project Management Division of Mitigation Services (BlockedBlockedhttps://deq.nc.gov/about/divisions/mitigation-services) NC Department of Environmental Quality (NCDEQ) (919) 707-8308 office (919) 812-2634 mobile Jeff. Schaffer@ncdenr.gov <mailto:Jeff.Schaffer(-,ncdenr.gov> 217 West Jones St., Suite 3000A 1652 Mail Service Center Raleigh, NC 27699-1652 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Haupt, Mac Sent: Wednesday, October 31, 2018 9:34 AM To: Schaffer, Jeff <jef .schaffer@ncdenr.gov>; Todd Tugwell <todd.tugwell@usace.army.mil> Cc: andrea.w.hughes@usace.army.mil Subject: RE: Mud Lick Creek (DMS #93482) As -Built Baseline -Mitigation Plan Amendment Reuest Jeff, What was the reason for the reduction? There was nothing to really review other than your email, correct? Thanks, IS MI From: Schaffer, Jeff Sent: Thursday, September 27, 2018 8:15 AM To: Todd Tugwell <Todd.Tugwell@usace.army.mil <mailto:Todd.Tugwell(a),usace.army.mil> > Cc: andrea.w.hughes@usace.army.mil <mailto:andrea.w.hughes(a,usace.army.mil> ; Haupt, Mac <mac.haupt@ncdenr.gov <mailto:mac.haupt(a),ncdenr.gov> > Subject: Mud Lick Creek (DMS #93482) As -Built Baseline -Mitigation Plan Amendment Reuest Todd, This email is to notify you of changes in assets from Approved Mitigation Plan to As -Built Baseline for which I am seeking IRT approval to amend the mitigation plan in accordance with your October 5, 2017 correspondence regarding Mitigation Credit Calculation. Overall there is a reduction of stream credit from 2,938 at approved mitigation plan to +/-2,832 at as -built (rounded). Once I receive IRT approval, I will post the As -Built Baseline Report with the approved changes. Please let me know if you have any questions or need to discuss this further. Thanks! Jeff Schaffer Eastern Supervisor, Project Management Division of Mitigation Services (https:Hdeq.nc.gov/about/divisions/mitigation-services> ) NC Department of Environmental Quality (NCDEQ) Mitigation Services ENVIRONMENTAL QUALITY September 27, 2018 MEMORANDUM TO: Todd Tugwell, USACE; Chairman of IRT FROM: Jeff Schaffer, DMS, Eastern Supervisor/Project Manager SUBJECT: Amendment to Approved Mitigation Plan Mud Lick Creek — DMS #93482 Cape Fear 03030003; Chatham County ROY COOPER Governor MICHAEL S. REGAN Secretary The assets/credits have changed from Approved Mitigation Plan to As -Built Baseline on the Mud Lick Creek project. In keeping with the October 5, 2017 correspondence regarding Mitigation Credit Calculation, DMS is requesting IRT approval to amend the approved mitigation plan for the subject project. 1. All measurements are based on center of the wetted perimeter of the stream channel in accordance with the October 5, 2017 memorandum. 2. Specific changes are: a. Decrease of credits on North Branch R1 due to footage removal of stream lengths that were outside the conservation easement. b. Increase of credits on North Branch Reach 2 due to channel realignment due to bedrock identified during construction. c. Decrease of credits on North Branch Reach 3 due to channel realignment due to bedrock and removal of 20 If/credit to account for an easement break for a crossing. d. Increase of credits on East Branch Reach 2 due to minor stream channel and culvert realignment because of bedrock identified during construction. e. Decrease of credits on East Branch R1 due to footage removal of stream lengths that were outside the conservation easement. f. Decrease of credits on Mud Lick Creek R1 due to footage removal of stream lengths that were outside the conservation easement. g. Decrease of credits on Mud Lick Creek R2 due to removal of 31 if/credit to account for an easement break for a crossing. h. Decrease of credits on Mud Lick Creek R3 due to footage removal of stream lengths that were outside the conservation easement. 3. Overall there is a reduction of stream credit from 2,938 at approved mitigation plan to ±2,832 at as -built (rounded). This is a reduction of ±106 stream credits. DMS looks forward to your approval to amend the approved mitigation plan for the Mud Lick Creek project. Please let me know if you need any additional information or if you would like to discuss this further. I can be reached at (919) 707-8308, or via email at jeff.schaffer&ncdenr.gov. cc: Andrea Hughes, USACE Mac Haupt, DWR File State of North Carolina I Environmental Quality I Mitigation Services 1652 Mail Service Center I Raleigh, NC 27699-1652 1 217 W. Jones Street, Suite 3000 919 707 8976 T Ak Axiom Environmental, Inc. September 19, 2018 Axiom Environmental, Inc. 218 Snow Avenue, Raleigh, NC 27603 919-215-1693 Mr. Jeff Schaffer North Carolina Department of Environmental Quality Division of Mitigation Services 1652 Mail Service Center Raleigh, North Carolina 27699-1652 RE: Mud Lick Creek (DMS Project # 93482, Contract #7683) Final Asbuilt Baseline Monitoring Report 12-004.22 Dear Jeff: Axiom Environmental, Inc. (AXE) is pleased to provide you with 3 hardcopies and 1 CD of digital files for the Final Mud Lick Creek Asbuilt Baseline Monitoring Report. Axiom received your additional comment letter dated September 18, 2018 and have addressed them as follows: 1. Digital files: a. GIS files: Change geographic reference for MudLickGraded from GCS_NAD_1983_CORS96 to Geographic Coordinate System, NAD 1983 State Plane North Carolina (US Feet). The geographic referenced was changed for this shapefile. 2. Appendix B, Figure 2: Please identify all reaches as named in the revised Table 1. (3 reaches on North Branch and 2 reaches on East Branch) Figure 2 was updated to match the revised Table 1. The centerline shapefile was also updated to reflect the correct reach breaks. 3. Appendix D: Please have a look at the stream type for the baseline in table 7a. It seems that based on the W/D ratios it should be a E/C type as the pre -con assessment indicated. The Rosgen Classification in Table 7a was changed to indicate an E/C type channel. Please let me know if you have any questions or comments regarding any component of this submittal. Thank you for the opportunity to continue to assist the Division of Mitigation Services with this important project. Sincerely, AX1OM ENVIRONMENTAL, INC. Kenan R. Jernigan Project Scientist Attachments: 3 hard copies Final Mud Lick Creek MY0 Baseline Monitoring Report & CD with electronic copy and digital support files Axiom Environmental, Inc. 218 Snow Avenue, Raleigh, NC 27603 919-215-1693 Axiom Environmental, Inc. September 10, 2018 Mr. Jeff Schaffer North Carolina Department of Environmental Quality Division of Mitigation Services 1652 Mail Service Center Raleigh, North Carolina 27699-1652 RE: Mud Lick Creek (DMS Project # 93482, Contract #7683) Final Asbuilt Baseline Monitoring Report Dear Jeff: f f►•EIIIL' WIX Axiom Environmental, Inc. (AXE) is pleased to provide you with an electronic copy of the revised document and digital files for the Final Mud Lick Creek Asbuilt Baseline Monitoring Report. Axiom received your comments dated August 31, 2018 and have addressed them as follows: Digital files: a. GIS files: Ensure that all data sources are using the correct Geographic Coordinate System, NAD 1983 State Plane North Carolina (US Feet). (CVS _Plot, Invasives, Monitoring—XS, Origins, SAC & Structures using GCS_NAD1983_2011; Fish_Benthics using GCS —NAD _ 1983_CORS96). Please also make sure that the stream centerlines are properly segmented to reflect reach breaks, break in the easement and/or any specialized credit ratios in the shapefile. Attributing these features with reach IDs, restoration level, and lengths is required. All shapefiles are now using the correct coordinate ystem. The stream centerline shapefile is now segmented and attributed to indicate reach ID, restoration level, and length. b. Spatial Data Reference missing for MLC rationing and MLD_Station Ticks. Spatial data has been updated to NAD 1983 State Plane North Carolina (US fee) for these shapefiles. c. Crest gauges and their locations are not included in the digital/GIS files. A shapefile depicting Crest Gauge locations has been included in the digital submittal. d. Per your contract the information for Warranty Transects is to be included in the MY1 report not the Baseline Report. When you submit with MY 1, please include GIS shapefiles and show on CCPV. Warranty transect information will be submitted with the NIY1 report. 2. Cover Sheets: Please just list the Axiom Monitoring Contract number since this deliverable is specific to your contract only. The contract number was changed on the cover sheets to 7683. 3. Project Summary, page is insert CU: 03030003 and 14 -digit HUC 03030003070010. These were added to the first paragraph of page i. 4. Page ii after Visual Assessments: Please insert the following text "As per sections 7.2 and 12.4 of the Mitigation Plan, physico-chemical and biological parameters may have been included as part of specialized monitoring, depending on the data that could be obtained during the baseline period. Monitoring of these parameters was for investigative purposes only and not tied to mitigation success or credit. The sample size and variability of the pre -con physico-chemical data was inadequate for the purposes of post -construction comparison and therefor these will not be monitored moving forward. However, fish and macro-benthos will be monitored at the stations indicated in the asset and monitoring features map." This was added to the text. Monitoring Summary Table, page 1: a. Streams: The morphological parameters that will be tallied should include BHR (Calculated by holding the As -built XSA constant and comparing to subsequent year) and the ER. This was added in the stream monitoring section of the text. b. Vegetation Monitoring: Would say vegetation monitoring will be completed after most of the growing season has passed. This was changed in the vegetation monitoring section of the text. 6. Appendix A, Table 1: a. North Branch R1: revise reach IDs to differentiate between the Enhancement II and Restoration sections of this reach (i.e. North Branch R1a and North Branch R1b) or break North Branch into three reaches. These were broken out into North Branch RI, K2, and K3. b. East Branch: revise reach IDs to differentiate between the Enhancement II and Restoration sections of this reach (i.e. East Branch R1 and East Branch R2). These were broken out into East Branch K1 and K2. c. Show credits out to 3 decimals. Credits are shown to 3 decimal places. 7. Appendix A, Table 3: make the following changes: add the following contact information: a. Add Michael Anderson (336) 725-2010 to contact for Construction Contractor. The contact was added. b. Add Stephen Joyce (336) 725-2010 to contact for Planting Contractor. The contact was added. c. Delete Turner Land Surveying from As -built Surveyors. They did survey for original construction plans that were the basis of the redline (record) drawings. Turner had nothing to do with As-builts. Turner Land Surveying was deleted from the table. 8. Appendix B, Figure 2: a. Please identify all reaches as named in Table 1. All reaches were labeled on the figure to match Table 1. b. Please show locations of the three crest gauges installed at the site. Also make sure that these are included in the digital/GIS files (see comment 1.c. above). These have been added to Figure 2 and the shapefiles are included in the in the digital submittal. c. Color code vegetation plots to differentiate between those that are above and below success criteria. Plots were color coded based on success criteria on the CCl/P. d. A stream area of concern is shown on Mud Lick Creek Reach 2, but there are no photographs as described in the Project Boundaries & Visual Assessments section on page 2. Unfortunately, a photograph of the stream area of concern could not be found. A brief description of the area was added to the Stream discussion on page 7 of the report Photographs of all areas of concern will be provided during all subsequent monitoringyears. e. Please symbolize the sections of Mud Lick mainstem that were graded A layer was added to show the sections of Mud Lick Creek that were graded. 9. Appendix B, Table 5: a. Verify this list against the list on sheet 2.1 of the Record Drawings (see next to last page in Appendix E). There appear to be some differences between the two. The list was verified to be the same; however, the order of the species listed was different so it was reordered to match the record drawings order. b. Correct spelling for Eastern Hophornbeam. This was corrected. 10. Appendix B, Table 6: a. Boxelder, red maple, hazel alder, sugarberry, and willow oak are listed as a planted species in various plots but are not listed in Table 5 which is the list of planted species provided by the planting contractor. Explain why these show up in Table 6 as planted. Bare root stems found during asbuilt monitoring were ident#ied as accurately as possible. Generally, planted stems are easily discernable due to the grid -like pattern in which they are planted, and in many cases during asbuilt monitoring the signs ofplanting (dibble bar holes, etc.) are obvious. Therefore, when this evidence is observed at a woody stem, it is catalogued as aplanted stem, regardless of whether the species was found on the planting list or not. Additionally, the red maple and box elder were changed from planted stems to natural recruits. b. American elm, Eastern hophornbeam, Elderberry, Witch hazel, Swamp tupelo and Tulip poplar are listed among the planted stems in Table 5 but do not appear in Table 6. Please explain. These species were not found in any of the vegetation plots during monitoring. The dense herbaceous layer was an important factor to consider during asbuilt vegetation monitoring, as it was performed in late summer. Each monitoringyear, all plots are thoroughly searched for stems, and it is possible some of these species were covered/hidden and will be found during subsequent monitoringyears. c. Explain why there are two lines for sweet gum. The species was not listed for one of the sweetgum entries in the CVS database thatgenerates this table. The species was added to this entry which corrected the issue. d. Verify if the "unknown" planted stems could be one or more of the missing planted stems in comment 8.b. The unknown planted stems could certainly be one or more of the missing planted stem species, however these stems were very small, in some cases leafless, and they could not be identified with confidence. e. For consistency between Tables 5 and 6, change American hornbeam to Ironwood. This has been changed in the table. 11. Appendix D: Need to re-evaluate the bankfull cross-sectional areas for Mud Lick mainstem in the context of the designer's calls. It was acknowledged that the bank height ratios for this reach were not going to be 1 in many places. They would be 1.2, 1.3 in many places, but it was proposed that since the reach had found its pattern and beltwidth, that an intensive EII with areas of bank reshaping would be pursued. The designer identified the bankfull XSA for this reach in the 40-50 SF range. The bankfull area calls should probably better approximate those even if it makes for BHRs of 1.2 or so. This was not a full restoration reach. Re- examine/ Recalculate in the context of this discussion the XS parameters for Mud Lick mainstem and update table 7a for Mud Lick The Mud Lick mainstem cross-sections were updated with consideration for the design approach and where possible were adjusted to the 40-50 sq ft range. XS 10 seems to be outright incorrect for its XSA calculation. This was incorrect; the correct data was input and updated throughout. Also, for Table 7a -c the baseline distribution should be restricted to riffle cross sections. Baseline data is limited to riffle cross-sections. Please let me know if you have any questions or comments regarding any component of this submittal. Thank you for the opportunity to continue to assist the Division of Mitigation Services with this important project. Sincerely, AXIOM ENVIRONMENTAL, INC. Kenan R. Jernigan Project Scientist Attachments: electronic copy Final Mud Lick Creek MYO Baseline Monitoring Report & digital support files PROJECT SUMMARY The North Carolina Division of Mitigation Services (NCDMS) has established the Mud Lick Creek Mitigation Site (Site) located within the Cape Fear River Basin Cataloging Unit (CU) 03030003 in the Upper Rocky River local watershed planning (LWP) area and 14 -digit HUC 03030003070010. The Site was identified as a priority mitigation project in the Detailed Assessment and Targeting of Management Report (Tetra Tech 2005). The main stressors to aquatic resources identified during the watershed assessments described in the LWP documents include the following. • Nutrient (nitrogen and phosphorous) loading from farming; • Sediment loading from overland runoff, disturbed surfaces, and streambank erosion; • Cattle access to streams increasing bank erosion and fecal coliform contamination; and • Insufficient bank vegetation. The project will contribute to meeting management recommendations to offset these stressors as described above for the LWP area by accomplishing the following primary goals. • Control and reduce nutrient sources from the Site; • Reduce sediment loads from disturbed areas on the Site and from eroding stream banks; • Increased aeration of flows within the project extent promoting increases in dissolved oxygen concentrations; • Reduce sources of fecal coliform pollution; • Improve instream habitat; • Reduce thermal loadings; • Reconnect channels with floodplains and raise local water table; and • Restore riparian habitat. These goals will be accomplished through the following objectives: • Restore riparian vegetation on the Site and thereby reduce sediment loads to streams from stream banks and existing pastures, increase on -Site retention of sediment and nutrients, create riparian habitat, and provide shade for streams to reduce thermal loadings; • Stabilize eroding streambanks to reduce sediment inputs; • Install fencing around the perimeter of the conservation easement to eliminate livestock access to streams, thereby reducing sediment, nutrient, and fecal coliform inputs; • Plant restored and stabilized streambanks with native species to improve stability and habitat; • Install instream structures to improve stability, create habitat, and help aerate stream flows; • Raise streambeds to reconnect restored channels to floodplains and raise local water tables; and • Restore streams and vegetation so the Site looks natural and aesthetically pleasing. Stream Success Criteria: The stream restoration performance criteria for the Site will follow approved performance criteria presented in the 2015 Mud Lick Creek Mitigation Site Final Mitigation Plan as described below. Stream Dimension: Riffle cross-sections on the restoration reaches and enhancement II reaches, where banks were re -graded (three reaches of Mud Lick Creek), should be stable and should show little change in bankfull area, maximum depth, and width -to -depth ratio. Bank -height -ratios shall not exceed 1.2 and entrenchment ratios shall be at least 2.2 for restored channels to be considered stable. All riffle cross- sections should fall within the parameters defined for channels of the appropriate stream type. If any changes do occur, these changes will be evaluated to assess whether the stream channel is showing signs of instability. Indicators of instability include a vertically incising thalweg or eroding channel banks. Changes in the channel that indicate a movement toward stability or enhanced habitat include a decrease in Asbuilt Baseline Monitoring Report (Final) Executive Summary page i Mud Lick Creek Mitigation Site (DMS Project # 93482) the width -to -depth ratio in meandering channels or an increase in pool depth. Remedial action would not be taken if channel changes indicate a movement toward stability. Stream Pattern and Profile: The as -built survey will include a longitudinal profile for the baseline monitoring report. Longitudinal profile surveys will not be conducted during the seven-year monitoring period unless other indicators during the annual monitoring indicate a trend toward vertical and lateral instability. Substrate: Substrate materials in the restoration reaches should indicate a progression towards or the maintenance of coarser materials in the riffle features and smaller particles in the pool features. Hydraulics: Two bankfull flow events, in separate monitoring years, must be documented on the restoration reaches and enhancement II reaches where banks were re -graded (three reaches of Mud Lick Creek) within the seven-year monitoring period. Vegetation Success Criteria: The final vegetative success criteria will be the survival of 210 planted stems per acre in the riparian corridor along restored and enhanced reaches at the end of the required monitoring period (year seven). The interim measure of vegetative success for the Site will be the survival of at least 320 planted stems per acre at the end of the third monitoring year and at least 260 stems per acre at the end of the fifth year of monitoring. If this performance standard is met by year five and stem density is trending towards success (i.e., no less than 260 five year old stems/acre), monitoring of vegetation on the Site may be terminated with written approval by the USACE in consultation with the NC Interagency Review Team. The extent of invasive species coverage will also be monitored and controlled as necessary throughout he required monitoring period (seven years). Photo Documentation: Photographs should illustrate the Site's vegetation and morphological stability on an annual basis. Cross-section photos should demonstrate no excessive erosion or degradation of the banks. Longitudinal photos should indicate the absence of persistent bars within the channel or vertical incision. Grade control structures should remain stable. Deposition of sediment on the bank side of vane arms is preferable. Maintenance of scour pools on the channel side of vane arms is expected. Visual Assessments: Visual assessments should support performance standards as described above. As per Sections 7.2 and 12.4 of the Mitigation Plan, physio -chemical and biological parameters may have been included as part of specialized monitoring, depending on the data that could be obtained during the baseline period. Monitoring of these parameters was for investigative purposes only and not tied to mitigation success or credit. The sample size and variability of the pre -construction physio -chemical data was inadequate for the purposes of post -construction comparison and therefore, these will not be monitored moving forward. However, fish and macrobenthos will be monitored at the stations indicated in the asset and monitoring features map (Figure 2, Appendix B). Site Background: The Site is located in northwestern Chatham County, north of Siler City and northwest of Silk Hope (Figure 1, Appendix B). The Site is located within the United States Geological Survey (USGS) Hydrologic Unit and Targeted Local Watershed 03030003070010 (North Carolina Division of Water Quality Subbasin 03-06-12) of the Cape Fear River Basin. Prior to construction, the Site was used for agricultural livestock production. The proposed project will improve water quality as well as provide numerous ecological benefits within the Cape Fear River Basin. The project will help meet management recommendations of the Upper Rocky River Local Watershed Plan by restoring a vegetated riparian buffer zone, stabilizing eroding stream banks, and removing livestock from streams and riparian zones. These activities will result in reduced nutrient, sediment, and fecal coliform inputs; improved aquatic and riparian habitat, and other ecological benefits. Asbuilt Baseline Monitoring Report (Final) Executive Summary page ii Mud Lick Creek Mitigation Site (DMS Project # 93482) Mitigation Components: Project mitigation efforts will generate 2832 Stream Mitigation Units (SMUs) as the result of the following. • Restoration of 1215 linear feet of Site streams • Enhancement (Level II) of 2426 linear feet of Site streams Site design was completed in June 2015. Site construction occurred May 24—August 25, 2017 (final walkthrough) and the Site was planted in February 2018. Completed project activities, reporting history, completion dates, project contacts, and project attributes are summarized in Tables 1-4 (Appendix A). Asbuilt Baseline Monitoring Report (Final) Mud Lick Creek Mitigation Site (DMS Project # 93482) Executive Summary page iii TABLE OF CONTENTS 1.0 METHODS.......................................................................................................................................1 2.0 REFERENCES................................................................................................................................. 3 APPENDICES Appendix A. Background Tables Table 1. Project Components and Mitigation Units Table 2. Project Activity and Reporting History Table 3. Project Contacts Table Table 4. Project Attributes Table Appendix B. Visual Assessment Data Figure 1. Site Location Figure 2. Current Conditions Plan View Vegetation Plot Photographs Appendix C. Vegetation Data Table 5. Planted Bare Root Woody Vegetation Table 6. Total Stems by Plot and Species Appendix D. Stream Measurement and Geomorphology Data Cross-section Plots Tables 7A -7C. Baseline Morphology and Hydraulic Summary Tables 8A -8F. Morphology and Hydraulic Monitoring Summary Appendix E. As -built Plan Sheets Asbuilt Baseline Monitoring Report (Final) Mud Lick Creek Mitigation Site (DMS Project # 93482) Table of Contents page i 1.0 METHODS Monitoring of restoration efforts will be performed for seven years, or until success criteria are fulfilled. Monitoring is proposed for the stream channel and vegetation. In general, the restoration success criteria, and required remediation actions, are based on the Stream Mitigation Guidelines (USACE et al. 2003). Monitoring features are summarized in the following table and described below; monitoring features are depicted on Figure 2 (Appendix B). Monitoring Summary Parameter Monitoring Feature I Quantity Frequency Streams Dimension Cross-sections 7 riffles & 3 pools annually Substrate Pebble counts 3 riffles annually Hydrology Crest gauges 3 annually Vegetation Vegetation Plots Warranty Plots 12 10 annually MY1 Visual assessments Entire Site biannually Exotic & nuisancespecies Entire Site annually Project boundary Entire Site annually Reference photographs 22 annually Supplement I Monitoring Biological Macrobenthos 5 sites (Preconstruction only) 3 sites (MY3, MY5, & MY7 Fish 3 sites (Preconstruction only) 2 sites (MY4 & MY7 Streams The restored stream reaches are proposed to be monitored for geometric activity as follows. • 7 permanent riffle cross-sections • 3 permanent pool cross-sections • 3 riffle pebble count samples for substrate analysis • 3 stream crest gauges The data will be presented in graphic and tabular format. Data to be presented will include 1) cross- sectional area, 2) bankfull width, 3) average depth, 4) maximum depth, and 5) width -to -depth ratio. Substrate analysis will be evaluated through pebble counts at three riffle cross-sections and data presented as a D50 for stream classification and tracking purposes. The stream will subsequently be classified according to stream geometry and substrate (Rosgen 1996). Significant changes in channel morphology including bank -height -ratios and entrenchment ratios will be tracked and reported by comparing data to asbuilt measurements in addition to each successive monitoring year. Annual photographs will include 22 fixed station photographs (12 vegetation plots and 10 cross-sections) (Appendix B). In addition, the Site contains three stream crest gauges to assist with documentation of bankfull events. One stream area of concern was observed along a large bend in Mud Lick Creek Reach 2 (Figure 2, Appendix B). Approximately 50 feet of the right bank and 20 feet of the left bank have eroded to the point of bank sloughing. This area currently appears relatively unstable, and it will be closely monitored during year 1. Asbuilt Baseline Monitoring Report (Final) Page 1 Mud Lick Creek Mitigation Site (DMS Project # 93482) Vegetation Restoration monitoring procedures for vegetation will monitor plant survival and species diversity. Planting occurred within the entire Site. After planting of the area was completed, 12 vegetation plots were installed and monitored at the Site; baseline results can be found in Appendix C. Annual measurements of vegetation will consist of the following. • 10 plant warranty inspection plots (only MY 1) • 12 CVS vegetation plots A photographic record of plant growth should be included in each annual monitoring report; baseline photographs are included in Appendix B. During the first year, vegetation will receive a cursory, visual evaluation on a periodic basis to ascertain the degree of overtopping of planted elements by nuisance species. Subsequently, quantitative sampling of vegetation will be performed as outlined in the CVS-EEP Protocol for Recording Vegetation, Version 4.2 (Lee et al. 2008) in late fall/early winter of the first monitoring year and annually toward the end of the growing for the remainder of the monitoring period until vegetation success criteria are achieved. Locations of exotic and nuisance vegetation will be recorded using a GPS and included on mapping. Proiect Boundaries & Visual Assessments Locations of any fence damage, vegetation damage, boundary encroachments, etc. will be recorded using a GPS and included on mapping. Visual assessments will be performed along all streams on a bi-annual basis during the seven year monitoring period. Problem areas will be noted such as channel instability (i.e. lateral and/or vertical instability, in -stream structure failure/instability and/or piping, headcuts), vegetated buffer health (i.e. low stem density, vegetation mortality, invasive species or encroachment), beaver activity, or livestock access. Areas of concern will be mapped and photographed accompanied by a written description in the annual report. Problem areas will be re-evaluated during each subsequent visual assessment. Supplementary Monitoring Supplemental monitoring will include biological monitoring in the Spring as follows. • 3 benthos sampling sites (MY3, MY5, & MY7) • 2 fish sampling sites (MY4 & MY7) These parameters are being monitored for analytical purposes and are not tied to mitigation success and associated credit releases. The primary criteria for indication of improvement for the benthos and fish will be an increase of at least one bioclassification between the pre -con assessment and the post -con monitoring. Richness and EPT metrics will be analyzed as well. Asbuilt Baseline Monitoring Report (Final) Page 2 Mud Lick Creek Mitigation Site (DMS Project # 93482) 2.0 REFERENCES Lee, M.T., R.K. Peet, S.D. Roberts, and T.R. Wentworth. 2008. CVS-EEP Protocol for Recording Vegetation. Version 4.2. North Carolina Department of Environment and Natural Resources, Ecosystem Enhancement Program. Raleigh, North Carolina. North Carolina Division of Mitigation Services (NCDMS) 2015. Mud Lick Creek Mitigation Site Final Mitigation Plan. Rosgen D. 1996. Applied River Morphology. Wildland Hydrology. Pagosa Springs, Colorado. Tetra Tech, 2005. Upper Rocky River Local Watershed Plan Preliminary Findings Report. Prepared for the North Carolina Ecosystem Enhancement Program. United States Army Corps of Engineers (USACE), United States Environmental Protection Agency (USEPA), North Carolina Wildlife Resources Commission (NCWRC), Natural Resources Conservation Service (MRCS), and North Carolina Division of Water Quality (NCDWQ). 2003. Stream Mitigation Guidelines. State of North Carolina. Asbuilt Baseline Monitoring Report (Final) Page 3 Mud Lick Creek Mitigation Site (DMS Project # 93482) Appendix A. Background Tables Table 1. Project Mitigation Components Table 2. Project Activity and Reporting History Table 3. Project Contacts Table Table 4. Project Attributes Table Asbuilt Baseline Monitoring Report (Final) Appendices Mud Lick Creek Mitigation Site (DMS Project # 93482) Table 1. Mud Lick Creek (ID -93482) - Mitigation Assets and Components Project Component (reach ID, etc.) Wetland Position and HydroType Existing Footage Stationing Mitigation Plan Footage As -Built Footage * Restoration Level Approach Priority Level Mitigation Ratio (X:1) Mitigation Credits Notes/Comments North Branch R1 Enhancement 318 100+10 - 103+28 327 318 Ell 1.5 212.000 Planting, fencing North Branch R2 522 103+28 - 108+66 520 538 R PI 1 538.000 North Branch R3 351 108+66 - 111+51 303 265 R P2 1 265.000 20 LF of restoration was removed from North Branch Reach 3 in order to account for an easement break East Branch R1 165 200+05 - 201+69 168 164 Ell 1.5 109.333 Planting, fencing East Branch R2 315 201+69 - 205+81 409 412 R P2 1 412.000 Mud Lick Creek R1 525 300+72 - 306+23 623 551 Ell 1.5 367.333 Planting, fencing, bank repairs Mud Lick Creek R2 718 306+23 - 313+14 693 660 Ell 1.5 440.000 Planting, fencing, bank repairs; 31 LF of enhancement II was removed from Mud Lick Creek Reach 2 in order to account for an easement break Mud Lick Creek R3 733 313+14 - 320+47 748 733 Ell 1.5 488.667 Planting, fencing, bank repairs *Reach start and end stationing may differ slightly from the mitigation plan due to removal of stream lengths that are outside the conservation easement. The upstream ends of Mud Lick Creek, North Branch, and East Branch experienced footage reductions of 72', 10', and 5' respectively, while the downstream end of Mud Lick Creek experienced a footage reduction of 17'. Length and Area Summations by Mitigation Category Restoration Level Stream (linear feet) Riparian Wetland (acres) Non -riparian Wetland (acres) Riverine Non-Riverine Restoration 1215 Enhancement Enhancement I Enhancement II 2426 Creation Preservation High Quality Pres Overall Assets Summary Overall Asset Category Credits Stream 2,832.333 Table 2. Project Activity and Reporting History Mud Lick Creek (ID -93482) Elapsed Time Since Grading Complete: 1 year 1 month Elapsed Time Since Planting Complete: 5 months Number of Reporting Years: 0 Activity or Deliverable Data Collection Complete Completion or Deliver Project Institution -- February 13, 2013 Mitigation Plan -- December 2015 404 Permit Date -- March 25, 2016 Final Desi — Construction Plans -- June 2015 Construction -- August 25, 2017 Bare Root; Containerized; and B&B Plantings for the Entire Project Site February 2018 February 2018 Baseline Monitoring Document (Year 0 Monitoring Baseline July 2018 August 2018 Table 3. Project Contact Table Mud Lick Creek (ID -93482) Designer Wildlands Engineering, Inc. (License No. F-0831) 312 West Millbrook Rd, Suite 225 Raleigh, NC 27609 Angela N. Allen, PE 919 851-9986 Construction Plans and Sediment and Wildlands Engineering, Inc. (License No. F-0831) Erosion Control Plans 312 West Millbrook Rd, Suite 225 Raleigh, NC 27609 Angela N. Allen, PE (919) 851-9986 Construction Contractor North State Environmental, Inc. 2889 Lowery Street Winston Salem, NC 27101 Michael Anderson 336 725-2010 Planting Contractor North State Environmental, Inc. 2889 Lowery Street Winston Salem, NC 27101 Stephen Joyce 336 725-2010 As -built Surveyors Allied Associates, PA 4720 Kester Mill Road Winston Salem, NC 27103 David Alley 336 765-2377 Baseline Data Collection Axiom Environmental, Inc. 218 Snow Avenue Raleigh, NC 27603 Grant Lewis 919 215-1693 Asbuilt Baseline Monitoring Report (Final) Appendices Mud Lick Creek Mitigation Site (DMS Project # 93482) Table 4. Project Baseline Information and Attributes Mud Lick Creek (ID -93482) Project Information Project name Mud Lick Creek Mitigation Site Project county Chatham County, North Carolina Project area Acres 11.2 Project coordinates lat/long) 35.8128°N, 79.4350°W Planted Acres 9.6 Project Watershed Summary Information Physiographic region Carolina Slate Belt of the Piedmont Physiographic Province Project river basin Cape Fear River Basin USGS hydrologic unit (8 digit/14- digit) 03030003/03030003070010 NCDWR Sub -basin 03-06-12 Project drainage area (mi2) 3.64 % Drainage area impervious < 1% CGIA land use classification Developed, Forested/Scrubland, Agriculture/Managed Herb., Open Water Reach Summary Information Parameters Mud Lick Creek — RI Mud Lick Creek — R2 Mud Lick Creek — R3 North Branch — Rl North Branch — R2 East Branch Restored length linear feet 551 660 733 856 265 576 Valley confinement Sliahtly confined - unconfined Drainage area acres/miz 1747/2.73 2170/3.39 2330/3.64 236.8/0.37 416/0.65 172.8/0.27 Perennial P, Intermittent I P P P P P P NCDWR water quality classification WS -III, CA Stream Classification(existing) E4 C4 E4 E4 134c 134c Stream Classification (proposed) E4 C4 E4 C4 C4 C4 Evolutionary trend (Simon & Hu IV/V IV/V IV/V IV IV IV FEMA classification AE AE AE AE AE AE Reg latory Considerations Regulation Applicable? Resolved? Supporting Documentation Waters of the US — Section 404 Yes Yes SAW -2014-00736 Waters of the US — Section 401 Yes Yes SAW -2014-00736 Endangered Species Act Yes Yes No Effect — CE Document Historic Preservation Act No NA CE Document Coastal Zone Management Act CZMA/CAMA No NA NA FEMA Floodplain Compliance Yes Yes Chatham County Floodplain Development Permit #14-001 Essential Fisheries Habitat No NA NA Asbuilt Baseline Monitoring Report (Final) Mud Lick Creek Mitigation Site (DMS Project # 93482) Appendices Appendix B Visual Assessment Data Figure 1. Site Location Figure 2. Current Conditions Plan View Vegetation Plot Photos Asbuilt Baseline Monitoring Report (Final) Mud Lick Creek Mitigation Site (DMS Project # 93482) Appendices t }.�Iky I � — {a )l� 1 t'� l� _. —�Sf I .* .: •C'ir' �y-. ��. � J�����'1�1� ,51�� AI .Cilmp - ��� - .µ'" _ � _ �j ��� ,�!^J �r` 't gar '� _ 'T i `t �• .�;�;-, { ' - HIS Iv {r- {� '." _ Site Location I ,.". 35.8128, -79.4350 X11; J. y II �M1 f � � •� '-S-' - { � }-i� .tel f} �." { �>t _ • k {�� `��. '- ,� � � � ,f.�� _moi yo rty 1, :yam Cj 421 64 0 1 2 4 Siler.Cit' - - -.. Miles � Directions from Silk Hope: -Take Silk Hope -Liberty Road west for 4.1 miles -Turn right on Siler City -Snow Camp Road; travel 0.2 mile -The Site/farm entrance is located on the left/east side of the road ..} .- * .. - -, r -------..... }" Axiom Environmental 218 Snow Avenue Raleigh, NC 27603 (919)215-1693 Axiom Environmental, Inc. SITE LOCATION MUD LICK CREEK MITIGATION SITE DMS PROJECT NUMBER 93482 Chatham County, North Carolina Dwn. by. CLF FIGURE Date: July 2018 Project: 12-004.22 Mud Lick Creek Stream Restoration Site Baseline Vegetation Monitoring Photographs Taken July 2018 Asbuilt Baseline Monitoring Report (Final) Mud Lick Creek Mitigation Site (DMS Project # 93482) Appendices Mud Lick Creek Stream Restoration Site Baseline Vegetation Monitoring Photographs Taken July 2018 Asbuilt Baseline Monitoring Report (Final) Mud Lick Creek Mitigation Site (DMS Project # 93482) Appendices Appendix C. Vegetation Plot Data Table 5. Planted Bare Root Woody Vegetation Table 6. Total Stems by Plot and Species Asbuilt Baseline Monitoring Report (Final) Mud Lick Creek Mitigation Site (DMS Project # 93482) Appendices Table 5. Planted Bare Root Woody Vegetation Mud Lick Creek (ID -93482) Species Quantity Green Ash Fraxinus enns lvanica 300 Sycamore Platanus occidentalis 400 Eastern Redbud Cercis canadensis 400 Cottonwood Po ulus deltoides 300 River birch Betula nigra) 300 Hackbe Celtis occidentalis 300 Black Gum ssa s lvatica 300 American Elm lmus americana 300 Eastern Ho hornbeam (Ostrya vir inica 300 Elderberry Sambucus s 300 Black Locust Robinia suedoaccia 300 Silky Dogwood Cornus ammomum 300 Witch Hazel Hamamelis vir inica 550 Buttonbush Ce halanthus occidentalis 300 Persimmon (Diospyros vir iniana 300 Ironwood (Carpinus caroliniana 400 Swamp Tupelo ssa bi ora 100 Swamp Chestnut oak(Quercus michauxii 100 Water oak(Quercus nigra) 100 Tulip Poplar Liridendron tuli i era 300 TOTAL 5950 Asbuilt Baseline Monitoring Report (Final) Mud Lick Creek Mitigation Site (DMS Project # 93482) Appendices Table 6. Total Stems by Plot and Species EEP Proiect Code 93482. Proiect Name: Mud Lick Creek Color for Density Exceeds requirements by 10% Exceeds requirements, but by less than 10% Fails to meet requirements, by less than 10% Fails to meet requirements by more than 10% Pnol-S = Planted excluding livestakes P -all = Planting including livestakes T = All planted and natural recruits including livestakes T includes natural recruits Current Plot Data (MYO 2018) Annual Means 93482-01-0001 93482-01-0002 93482-01-0003 93482-01-0004 93482-01-0005 93482-01-0006 93482-01-0007 93482-01-0008 93482-01-0009 93482-01-0010 93482-01-0011 93482-01-0012 MYO (2018) Scientific Name Common Name Species Type PnoLS P -all T Pnol-S P -all T Pnol-S P -all T Pnol-S P -all T Pnol-S P -all T PnoLS P -all T PnoLS P -all T Pnol-S P -all T Pnol-S P -all T Pnol-S P -all T Pnol-S P -all T Pnol-S P -all T Pnol-S P -all T Acer negundo boxelder Tree 1 1 3 3 1 1 2 1 1 10 Acer rubrum red maple Tree 4 3 1 1 1 10 Alnus alder Shrub 1 2 3 Betula nigra river birch Tree 1 1 1 2 2 2 1 1 1 4 4 4 Carpinus caroliniana American hornbeam Tree 1 1 1 3 3 3 1 1 1 1 1 1 1 1 1 5 5 5 1 1 1 2 2 2 15 15 15 Carya hickory Tree 1 1 Celtis laevigata sugarberry Tree 1 1 1 1 1 1 1 Celtis occidentalis common hackberry Tree 2 2 2 1 1 1 3 3 3 Cephalanthus occidentalis common buttonbush Shrub 1 1 1 1 1 1 1 1 1 1 1 1 4 4 4 Cercis canadensis eastern redbud Tree 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 6 6 6 Cornus amomum silky dogwood Shrub 1 1 1 3 3 3 1 1 1 3 3 3 8 8 8 Diospyros virginiana common persimmon Tree 2 2 2 1 1 1 2 2 2 5 5 5 Fraxinus pennsylvanica green ash Tree 2 2 2 1 1 1 1 1 1 7 7 81 1 1 1 12 12 13 Juglans nigra black walnut Tree 5 5 Liquidambar styraciflua sweetgum Tree 1 1 3 3 3 10 Nyssa biflora swamp tupelo Tree 4 4 4 1 1 1 1 1 1 6 6 6 Ostrya virginiana hophornbeam Tree 1 1 1 1 1 1 Platanus occidentalis American sycamore Tree 1 1 1 4 4 4 1 1 1 1 1 1 7 7 7 Populus deltoides eastern cottonwood Tree 1 1 1 1 1 1 1 1 1 3 3 3 Quercus michauxii swamp chestnut oak Tree 3 3 3 1 1 1 2 2 2 1 1 1 7 7 7 Quercus nigra Iwater oak ITree 1 1 1 1 1 1 1 1 1 3 3 3 Robinia pseudoacacia I black locust ITree 1 1 1 1 1 1 Unknown I IShrub or Tree 1 1 1 2 2 2 48 3 3 3 Stem count 7 7 7 9 9 11 5 5 8 9 9 9 8 8 10 6 6 13 77 5 5 12 8 8 6 61 7 9 91 14 81 8 11 10 10 19 90 90 129 size (ares) 1 1 1 1 1 1 1 1 1 1 1 1 12 size (ACRES) 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.30 Species count 51 Stems per ACRE 283.3 51 51 283.3 283.3 41 364.2 41 61 364.2 445.2 21 21 41 202.3 202.3 323.7 71 71 71 21 21 31 41 41 61 51 51 81 61 61 61 364.2 364.2 364.2 323.7 323.7 404.7 242.8 242.8 526.1 202.3 202.3 485.6 323.7 323.7 323.7 21 21 3 242.8 242.8 283.3 7 364.2 71 91 71 364.2 566.6 323.7 71 8 61 61 9 323.7 445.2 404.7 404.7 768.9 181 181 303.5 303.5 23 435 Color for Density Exceeds requirements by 10% Exceeds requirements, but by less than 10% Fails to meet requirements, by less than 10% Fails to meet requirements by more than 10% Pnol-S = Planted excluding livestakes P -all = Planting including livestakes T = All planted and natural recruits including livestakes T includes natural recruits Appendix D. Stream Measurements and Geomorphology Data Cross Section Plots Tables 7A -7C. Baseline Stream Data Summary Tables 8A -8F. Monitoring Data -Dimensional Data Summary Asbuilt Baseline Monitoring Report (Final) Mud Lick Creek Mitigation Site (DMS Project # 93482) Appendices River Basin: Cape Fear Site Name Mud Lick Creek XS ID XS - 1, Riffle Mud Lick Cr Drainage Area (sq mi): 3.64 Date: 7/25/2018 Field Crew: Perkinson, Smith Station Elevation 0.00 99.85 4.71 99.89 8.04 99.95 10.30 99.90 12.12 99.12 13.68 98.19 15.15 97.45 16.19 97.09 18.00 96.16 19.55 95.43 20.72 94.82 21.88 94.45 22.83 94.19 24.88 93.96 25.93 93.79 27.76 93.77 29.45 93.47 31.00 93.48 32.39 93.51 33.02 93.54 34.05 97.26 35.49 97.74 37.53 98.43 40.21 98.69 43.17 98.79 45.90 99.00 47.39 99.09 SUMMARY DATA Bankfull Elevation: 97.3 Bankfull Cross -Sectional Area: 49.8 Bankfull Width: 18.3 Flood Prone Area Elevation: 101.1 Flood Prone Width: 100.0 Max Depth at Bankfull: 3.8 Mean De th at Bankfull: 2.7 W / D Ratio: 6.7 Entrenchment Ratio: 5.5 Bank Height Ratio: 1.3 Stream Type E Cape Fear River Basin, Mud Lick Creek, XS - 1, Riffle (Mud Lick Cr) 102 101 100 99 98 s; --------------------- ------------------------ ------------------ 97 96 -- • Bankfull • Flood Prone Area 95 94 --I-- MY -00 7/25/18 93 0 5 10 15 20 25 30 35 40 45 50 Station (feet) River Basin: Cape Fear Site Name Mud Lick Creek XS ID XS - 2, Riffle Mud Lick Cr Drainage Area (sq mi): 3.64 Date: 7/25/2018 Field Crew: Perkinson, Smith Station Elevation 0.00 99.33 4.49 99.11 8.40 98.88 9.81 98.72 11.51 98.18 13.54 97.49 14.98 97.07 16.26 96.66 17.44 96.15 18.32 95.58 19.24 94.75 19.71 94.32 20.59 93.96 21.44 93.61 22.12 93.67 22.96 93.75 23.83 93.99 24.58 94.09 25.58 94.71 26.63 95.61 28.13 96.46 30.95 96.73 32.79 96.96 36.10 97.42 36.44 97.29 39.40 97.34 97 SUMMARY DATA Bankfull Elevation: MENU 97.3 Bankfull Cross -Sectional Area: 33.0 Bankfull Width: 21.0 Flood Prone Area Elevation: 101.0 Flood Prone Width: 100.0 Max Depth at Bankfull: ff 1 3.7 Mean Depth at Bankfull: 1.6 W / D Ratio: 13.3 Entrenchment Ratio: 4.8 Bank Height Ratio: m 1 1.0 Cape Fear River Basin, Mud Lick Creek, XS - 2, Riffle (Mud Lick Cr) 102 101 100 99 98 s 97 ti 96 Bankfull W Flood Prone Area 95 � MY -00 7/25/18 94 93 0 5 10 15 20 25 30 35 40 45 Station (feet) River Basin: Cape Fear Site Name Mud Lick Creek XS ID XS - 3, Pool(North Branch Drainage Area (sq mi): 0.65 Date: 7/25/2018 Field Crew: Perkinson, Smith Station Elevation 0.00 98.43 4.32 98.50 8.51 98.38 10.42 98.21 12.60 97.81 13.98 97.34 14.61 97.10 15.27 96.66 16.19 96.41 17.01 96.30 17.68 96.24 18.77 96.13 19.60 96.44 20.43 96.56 21.44 97.42 22.24 97.84 23.48 98.26 24.60 98.78 25.51 98.85 28.85 98.72 31.70 98.92 34.51 99.10 SUMMARY DATA Bankfull Elevation: 98.3 Bankfull Cross -Sectional Area: 15.5 Bankfull Width: 14.2 Flood Prone Area Elevation: NA Flood Prone Width: NA Max Depth at Bankfull: 2.2 Mean Depth at Bankfull: 1.1 W / D Ratio: NA Entrenchment Ratio: NA Bank Height Ratio: 1.0 Stream Type E Cape Fear River Basin, Mud Lick Creek, XS - 3, Pool (North Branch) 100 99 98 -- - s; 0 97 ti fit] - � � � Bankfull 96 MY -00 7/25/18 9$ 0 10 20 30 40 Station (feet) River Basin: Elevation Cape Fear 98.76 2.51 98.93 Site Name 0.65 Mud Lick Creek 7/25/2018 Field Crew: Perkinson, Smith XS ID 98.28 XS - 4, Riffle (North Branch 98.13 12.37 97.86 Drainage 97.38 13.73 97.17 14.19 97.25 14.52 97.10 15.36 97.14 15.99 97.34 16.60 97.65 17.30 97.81 A•' t 98.04 19.07 98.18 19.77 98.48 21.91 98.92 23.48 99.07 25.39 99.05 26.82 99.13 $ - F Stream Type C Cape Fear River Basin, Mud Lick Creek, XS - 4, Riffle (North Branch) 101 100 5 99 ------------------------------------------ ---------- 0 98 W - - -- Bankfull 97 Flood Prone Area MY -00 7/25/18 96 0 5 10 15 20 25 30 Station (feet) Station Elevation 0.00 98.76 2.51 98.93 Area (s mi): 0.65 Date: 7/25/2018 Field Crew: Perkinson, Smith Station Elevation 0.00 98.76 2.51 98.93 4.46 98.94 6.31 98.65 8.79 98.38 10.22 98.28 11.38 98.13 12.37 97.86 13.11 97.38 13.73 97.17 14.19 97.25 14.52 97.10 15.36 97.14 15.99 97.34 16.60 97.65 17.30 97.81 17.95 98.04 19.07 98.18 19.77 98.48 21.91 98.92 23.48 99.07 25.39 99.05 26.82 99.13 SUMMARY DATA Bankfull Elevation: 98.9SAM Bankfull Cross -Sectional Area: 14.2 Bankfull Width: 17.7 Flood Prone Area Elevation: 100.7 Flood Prone Width: 100.0 Max Depth at Bankfull: 1.8 Mean Depth at Bankfull: 0.8 W / D Ratio • 22.1 Entrenchment Ratio: 5.6 Bank Height Ratio: 1.0 River Basin: Cape Fear Site Name Mud Lick Creek XS ID XS - 5, Pool(North Branch Drainage Area (sq mi): 0.65 Date: 7/25/2018 Field Crew: Perkinson, Smith Station Elevation 0.00 97.97 2.50 98.15 5.59 98.21 6.74 97.80 7.86 97.32 9.36 96.74 10.36 95.86 11.25 95.43 12.45 95.29 14.03 95.17 14.89 95.49 16.35 96.69 17.72 97.03 18.91 97.50 19.85 97.75 23.53 97.94 26.70 97.90 SUMMARY DATA Bankfull Elevation: 97.8 Bankfull Cross -Sectional Area: 18.6 Bankfull Width: 14.2 Flood Prone Area Elevation: NA Flood Prone Width: NA Max Depth at Bankfull: 2.6 Mean Depth at Bankfull: 1.3 W / D Ratio: NA Entrenchment Ratio: NA Bank Height Ratio: 1.0 99 98 m 5 0 97 ti W 96 Stream Type C Cape Fear River Basin, Mud Lick Creek, XS - 5, Pool (North Branch) 95 1 I I I �! 0 10 20 30 40 Station (feet) River Basin: Cape Fear Site Name Mud Lick Creek XS ID XS - 6, Riffle(North Branch Drainage Area (sq mi): 0.65 Date: 7/25/2018 Field Crew: Perkinson, Smith Station Elevation 0.00 98.15 3.55 98.09 5.91 97.92 7.58 97.58 9.22 97.02 10.94 96.61 11.91 96.25 13.16 96.25 14.44 96.21 15.60 96.14 17.17 96.95 18.98 97.60 20.84 97.99 24.24 98.05 27.10 98.10 28.68 98.10 SUMMARY DATA Bankfull Elevation: 97.9 Bankfull Cross -Sectional Area: 14.5 Bankfull Width: 14.6 Flood Prone Area Elevation: 99.7 Flood Prone Width: 100.0 Max Depth at Bankfull: 1.8 Mean Depth at Bankfull: 1.0 W / D Ratio: 14.8 Entrenchment Ratio: 6.8 Bank Height Ratio: 1.0 100 W-14�1 Stream Type C Cape Fear River Basin, Mud Lick Creek, XS - 6, Riffle (North Branch) L--------------------------------------------------------- 99 95 5 98 --------- - ------ 0 5 10 0 f.. Lit - Stream Type C Cape Fear River Basin, Mud Lick Creek, XS - 6, Riffle (North Branch) L--------------------------------------------------------- 99 95 5 98 --------- - ------ 0 5 10 0 97 W 96 95 0 5 10 15 20 Station (feet) -- Bankfull Flood Prone Area MY -00 7/25/18 25 30 35 River Basin: Cape Fear Site Name Mud Lick Creek XS ID XS - 7, Riffle East Branch Drainage Area (sq mi): 0.27 Date: 7/25/2018 Field Crew: Perkinson, Smith Station Elevation 0.00 98.92 2.40 99.07 4.06 99.10 5.44 99.13 6.92 98.70 7.81 98.64 8.63 98.08 9.20 97.62 9.70 97.64 11.18 97.47 12.52 97.66 13.61 97.58 14.53 98.08 15.73 98.41 17.08 98.74 20.63 98.76 22.50 98.92 24.21 98.93 SUMMARY DATA Bankfull Elevation: 98.6 Bankfull Cross -Sectional Area: 6.7 Bankfull Width: 8.9 Flood Prone Area Elevation: 99.8 Flood Prone Width: 100.0 Max Depth at Bankfull: 1.2 Mean Depth at Bankfull: 0.8 W / D Ratio: 11.8 Entrenchment Ratio: 11.3 Bank Height Ratio: 1.0 TO" �s- - . a -. w = ".• i�. - � j �y 1 Cape Fear River Basin, Mud Lick Creek, XS - 7, Riffle (East Branch) 100 --------------------------------------------------------- 99 5 0 ti W 98 ----Bankfull Flood Prone Area MY -00 7/25/18 97 0 5 10 15 20 25 30 Station (feet) River Basin: Cape Fear Site Name Mud Lick Creek XS ID XS - 8, Pool East Branch Drainage Area (sq mi): 0.27 Date: 7/25/2018 Field Crew: Perkinson, Smith Station Elevation 0.00 100.94 1.47 101.37 3.75 101.35 6.10 101.02 7.45 100.85 9.30 100.30 9.86 99.36 10.96 99.21 11.64 99.16 12.54 98.84 13.18 97.81 14.15 97.57 15.20 98.04 16.03 98.42 16.50 98.80 17.10 100.00 17.80 100.15 19.69 100.54 21.62 100.75 24.06 100.95 27.19 101.11 0 10 20 30 40 Station (feet) SUMMARY DATA Bankfull Elevation: 100.0 Bankfull Cross -Sectional Area: 10.5 Bankfull Width: 7.6 Flood Prone Area Elevation: NA Flood Prone Width: NA Max Depth at Bankfull: 2.4 Mean Depth at Bankfull: 1.4 W / D Ratio: NA Entrenchment Ratio: NA Bank Height Ratio: 1.0 Cape Fear River Basin, Mud Lick Creek, XS - 8, Pool (East Branch) 102 101 100 s; 0 ti 99 W Bankfull 98 MY -00 7/25/18 97 0 10 20 30 40 Station (feet) River Basin: Cape Fear Site Name Mud Lick Creek XS ID XS - 9, Riffle East Branch Drainage Area (sq mi): 0.27 Date: 7/25/2018 Field Crew: Perkinson, Smith Station Elevation 0.00 101.08 2.92 101.15 5.86 101.18 8.17 101.10 10.21 100.70 12.06 100.27 12.92 99.89 14.09 99.64 15.13 99.80 16.07 99.88 17.37 100.17 19.06 100.56 21.60 100.85 25.65 101.17 29.56 100.99 SUMMARY DATA Bankfull Elevation: 101.1 Bankfull Cross -Sectional Area: 10.6 Bankfull Width: 16.6 Flood Prone Area Elevation: 102.6 Flood Prone Width: 100.0 Max Depth at Bankfull: 1.5 Mean Depth at Bankfull: 0.6 W / D Ratio • 25.8 Entrenchment Ratio: 6.0 Bank Height Ratio: 1.0 103 102 100 99 + 0 Stream Type C Cape Fear River Basin, Mud Lick Creek, XS - 9, Riffle (East Branch) 5 10 15 20 Station (feet) -- Bankfull Flood Prone Area MY -00 7/25/18 25 30 35 I , Stream Type C Cape Fear River Basin, Mud Lick Creek, XS - 9, Riffle (East Branch) 5 10 15 20 Station (feet) -- Bankfull Flood Prone Area MY -00 7/25/18 25 30 35 River Basin: Cape Fear Site Name Mud Lick Creek XS ID XS - 10, Riffle Mud Lick Cr Drainage Area (sq mi): 3.64 Date: 7/25/2018 Field Crew: Perkinson, Smith Station Elevation 0.00 97.79 3.09 97.60 4.21 97.87 5.48 97.66 7.11 97.01 8.13 96.25 9.24 95.54 10.74 95.22 11.50 94.66 12.73 94.40 13.79 94.49 14.96 94.14 15.78 93.98 17.46 94.04 18.50 95.06 19.75 95.63 21.13 96.19 22.88 96.55 25.29 97.55 26.80 98.23 28.27 98.75 29.41 99.04 30.75 99.55 32.96 99.42 34.80 99.38 97 SUMMARY DATA Bankfull Elevation: 97.6 Bankfull Cross -Sectional Area: 40.4 Bankfull Width: 19.8 Flood Prone Area Elevation: 101.2 Flood Prone Width: 100.0 Max Depth at Bankfull: 3.6 Mean Depth at Bankfull: 2.0 W / D Ratio: 9.7 Entrenchment Ratio: 5.1 Bank Height Ratio: 1.0 Stream Type E Cape Fear River Basin, Mud Lick Creek, XS - 10, Riffle (Mud Lick Cr) 102 101_____________________________________________________________ 100 99 98 --------------------------------- ---------------- o-- 97 ti 96 Bankfull W Flood Prone Area 95 94 � MY -00 7/25/18 93 0 5 10 15 20 25 30 35 40 Station (feet) Table 7a. Baseline Stream Data Summary (Mud Lick Creek) Mud Lick Creek Mitigation Project - NCDMS Project Number 93482 Parameter Gauge Regional Curve Pre -Existing Condition (Mud Lick Creek) Reference Reach(es) Data Design (Mud Lick Creek) Monitoring Baseline (Mud Lick Creek) Dimension and Substrate - Riffle Only LL UL Eq. Min Mean Med Max SD Min Mean Med Max SD Min Max Med Min Mean Med Max SD n BF Width (ft) 18.2 22.0 24.6 5.3 10.8 12.3 18.3 19.8 21 3 Floodprone Width (ft) 250.0 306.0 378.0 14 60 125 100 100 100 3 BF Mean Depth (ft) 1.9 2.1 2.3 0.8 1.0 1.8 1.6 2.0 2.7 3 BF Max Depth (ft) 3.0 4.0 4.2 1.0 1.5 2.6 3.6 3.7 3.8 3 BF Cross Sectional Area (ft) 41.3 46.3 47.5 5.4 10.6 19.7 33.0 40.4 49.8 3 Width/Depth Ratio 8.0 10.5 12.8 5.2 8.6 14.4 6.8 9.9 13.1 3 Entrenchment Ratio 12.4 13.7 17.2 1.7 4.3 >10.2 4.8 5.1 5.5 3 Bank Height Ratio 1.1 1.2 1.2 1.0 1.0 1.1 1.0 1.0 1.3 1 3 Profile Riffle length (ft) Riffle slope (ft/ft) 0.0040 0.0188 0.0704 Pool length (ft) Pool Max depth (ft) 3.7 4.4 5.2 1.2 1.8 3.3 Pool spacing (ft) 9.0 46.0 73.0 Pattern Channel Bcltwidth (ft) 26.1 52.9 69.9 10 41 102 Radius of Curvature (ft) 9.9 24.8 58.8 11 21 85 Rc:Bankfull width (ft/ft) 0.5 1.1 2.39 1.3 2 9.1 Meander Wavelength (ft) 59.9 159.6 244.4 - - - Meander Width ratiol 1.4 2.2 3.8 1.6 4.4 8.9 Transport parameters Reach Shear Stress (competency) lbs/ft' Max part size (mm) mobilized at bankfull Stream Power (transport capacity) W/m' Additional Reach Parameters Rosgen Classification E/C4 E/C4 E/C-type Bankfull Velocity (fps) 3.0-3.4 2.2-5.6 Bankfull Discharge (cfs) 123.9 - 157.42 20-97 Valley Length (ft) Channel Thalweg Length (ft) Sinuosity 1.20 - 1.37 1.0 - 2.3 Water Surface Slope ft/ft BF slope ft/ft Bankfull Floodplain Area acres % of Reach with Eroding Banks Channel Stability or Habitat Metric Biological or Other Table 7b. Baseline Stream Data Summary (North Branch) Mud Lick Creek Mitigation Project - NCDMS Project Number 93482 Parameter Gauge Regional Curve Pre -Existing Condition (North Branch) Reference Reach(es) Data Design (North Branch) Monitoring Baseline (North Branch) Dimension and Substrate - Riffle Only LL UL Eq. Min Mean Med Max SD Min Mean Med Max SD Min Max Med Min Mean Med Max SD n BF Width (ft) 8.3 10.4 5.3 10.8 12.3 13.8 14.0 14.6 16.2 17.7 2 Floodprone Width (ft) 33.3 80.0 14 60 125 30 70 100 100 100 2 BF Mean Depth (ft) 0.7 1.5 0.8 1.0 1.8 1.0 1.2 0.8 0.9 1.0 2 BF Max Depth (ft) 1.5 2.3 1.0 1.5 2.6 1.3 2.0 1.8 1.8 1.8 2 BF Cross Sectional Area (ft 2) 7.7 12.7 5.4 10.6 19.7 14.4 16.3 14.2 14.4 14.5 2 Width/Depth Ratio 5.4 14.0 5.2 8.6 14.4 12.0 13.0 14.6 18.4 22.1 2 Entrenchment Ratio 1.9 10.1 1.7 4.3 >10.2 2.2 5.0 5.6 6.2 6.8 2 Bank Height Ratiol 1 1.7 2.0 1 1.0 1 1.0 1.1 1.0 1.0 1.0 1.0 1 1.0 1 2 Profile Riffle length (ft) Riffle slope (ft/ft) 0.0040 0.0188 0.0704 0.0060 0.0340 Pool length (ft) Pool Max depth (ft) 2.1 2.7 1.2 1.8 3.3 1.3 4.7 Pool spacing (ft) 9.0 46.0 73.0 19.0 92.0 Pattern Channel Beltwidth ft 11 26 38.5 10 41 102 41 125 Radius of Curvature (ft) 6.1 17 37 11 21 85 25 42 Rc:Bankfull width (ft/ft) 0.73 1.6 4.46 1.3 2 9.1 1.8 3 Meander Wavelength (ft) 37.9 64.1 100.6 - - - 41 168 Meander Width ratio 1.1 2.8 4.6 1.6 4.4 8.9 3 15 Transport parameters Reach Shear Stress (competency) lbs/ft2 Max part size (mm) mobilized at bankfull Stream Power (transport capacity) W/m2 Additional Reach Parameters Rosgen Classification E5B5c E/C4 C4 C-type Bankfull Velocit s 3.3 -3.5 2.2-5.6 2.4-4.3 Bankfull Discharge (cfs) 25.41 - 44.45 20-97 34.6 - 70.1 Valley Length ft Channel Thalweg Length (ft) Sinuosity 1.22-1.32 1.0-2.3 1.2- 1.3 Water Surface Slope ft/ft BF slope ft/ft Bankfull Floodplain Area acres % of Reach with Eroding Banks Channel Stability or Habitat Metric Biological or Other Table 7c. Baseline Stream Data Summary (East Branch) Mud Lick Creek Mitigation Project - NCDMS Project Number 93482 Parameter Gauge Regional Curve Pre -Existing Condition (East Branch) Reference Reach(es) Data Design (East Branch) Monitoring Baseline (East Branch) Dimension and Substrate - Riffle Only LL UL Eq. Min Mean Med Max SD Min Mean Med Max SD Min Max Med Min Mean Med Max SD n BF Width (ft) 4.3 5.3 10.8 12.3 11.0 8.9 12.8 16.6 2 Floodprone Width (ft) 23.0 14 60 125 24 55 100 100 100 2 BF Mean Depth (ft) 1.1 0.8 1.0 1.8 0.9 0.6 0.7 0.8 2 BF Max Depth (ft) 1.4 1.0 1.5 2.6 0.9 1.5 1.2 1.4 1.5 2 BF Cross Sectional Area (ft) 4.8 5.4 10.6 19.7 9.7 6.7 8.7 10.6 2 Width/Depth Ratio 3.9 5.2 8.6 14.4 12.4 11.1 19.4 27.7 2 Entrenchment Ratio 2.1 1.7 4.3 >10.2 2.2 5.0 6.0 8.6 11.2 2 Bank Height Ratio 1.9 1.0 1.0 1 1.1 1.0 1.0 1.0 1 1.0 1.0 2 Profile Riffle length (ft) Riffle slope (ft/ft) 0.0040 0.0188 0.0704 0.0156 0.0442 Pool length (ft) Pool Max depth (ft) 1.6 1.2 1.8 3.3 1.0 3.5 Pool spacing (11)1 9.0 1 1 46.0 1 73.0 1 15.0 1 73.0 Pattern Channel Beltwidth (ft) -- 10 41 102 22 98 Radius of Curvature (ft) -- 11 21 85 20 30 Rc:Bankfull width (ft/ft) -- 1.3 2 9.1 1.8 3 Meander Wavelength (ft) -- - - - 33 132 Meander Width ratio -- 1.6 4.4 8.9 3 12 Transport parameters Reach Shear Stress (competency) 1bS/ft2 Max part size (mm) mobilized at bankfull Stream Power (transport capacity)W/m2 Additional Reach Parameters Rosgen Classification B4c E/C4 C4 C-type Bankfull Velocity (fps) 4.2 2.2-5.6 3.3 Bankfull Discharge (cfs) 20.2 20-97 32 Valley Length (ft) Channel Thalweg Length (ft) Sinuosity 1 1.0-2.3 1.20-1.30 Water Surface Slope ft/ft BF slope ft/ft Bankfull Floodplain Area acres % of Reach with Eroding Banks Channel Stability or Habitat Metric Biological or Other Table 8a. Monitoring Data - Dimensional Morphology Summary (Dimensional Parameters - Cross Sections) Mud Lick Creek Mitigation Proiect - NCDMS Protect Number 93482 Table 8b. Monitoring Data - Stream Reach Data Summary Mud Lick Creek Mitigation Project - NCDMS Project Number 93482 Cross Section 1 (Mud Lick Cr) Cross Section 2 Mud Lick Cr Cross Section 10 Mud Lick Cr) Parameter Riffle Riffle Riffle Dimension and Substrate - Riffle Only Dimension MYO MY1 MY2 MY3 MY4 MY5 MY5+ MYO MY1 MY2 MY3 MY4 MY5 MY5+ MYO MY1 MY2 MY3 MY4 MY5 MY5+ BF Width ft 18.3 21.0 19.8 Floodprone Width (ft) (approx) 100.0 100.0 100.0 BF Mean Depth (ft) 2.7 1.6 2.0 BF Max Depth (ft) 3.8 3.7 3.6 Low Bank Height 5.0 3.7 3.6 BF Cross Sectional Area (ft2) 49.8 33.0 40.4 Wid"epth Ratio 6.7 13.4 9.7 Entrenchment Ratio 5.5 4.8 5.1 Bank Height Ratio 1.3 1.0 1.0 d50 mm 9.9 9.9 9.9 Table 8b. Monitoring Data - Stream Reach Data Summary Mud Lick Creek Mitigation Project - NCDMS Project Number 93482 Dimension and Substrate - Riffle Only BF Max Depth (ft) BF Cross Sectional Area (ft) Entrenchment Ratio Bank Height Ratio Additional Reach Parameters Rosgen Classification Channel Thalweg Length (ft) , % of Reach „. StabilityChannel , Table 8c. Monitoring Data - Dimensional Morphology Summary (Dimensional Parameters - Cross Sections) Mud Lick Creek Mitis ation Proiect - NCDMS Protect Number 93482 Table 8d. Monitoring Data - Stream Reach Data Summary Mud Lick Creek Mitigation Project - NCDMS Project Number 93482 Cross Section 3(North Branch Cross Section 4 North Branch Cross Section 5 North Branch Cross Section 6 North Branch Parameter Pool Riffle Pool Riffle JL - Dimension MYO MY1 MY2 MY3 MY4 MY5 MY5+ MYO MY1 MY2 MY3 MY4 MY5 MY5+ MYO MY1 MY2 MY3 MY4 MY5 MY5+ MYO MY1 MY2 MY3 MY4 MY5 MY5+ BF Width ft 14.2 17.7 14.2 14.6 Floodprone Width (ft) (approx) NA 100.0 NA 100.0 BF Mean Depth (ft) 1.1 0.8 1.3 1.0 BF Max Depth (ft) 2.2 1.8 2.6 1.8 Low Bank Height 2.2 1.8 2.6 1.8 BF Cross Sectional Area (ft) 15.5 1 14.2 18.6 14.5 Wid"epth Ratio NA 22.1 NA 14.7 Entrenchment Ratio NA 5.6 NA 6.8 Bank Height Ratio 1.0 1.0 1.0 1.0 d50 mm 18.8 18.8 Table 8d. Monitoring Data - Stream Reach Data Summary Mud Lick Creek Mitigation Project - NCDMS Project Number 93482 Dimension and Substrate - Riffle Only BF Max Depth (ft) BF Cross Sectional Area (ft) Entrenchment Raft. Bank Height Ratio ------ ------ ------ ------ ------ ------ ------ ------ ------ ------ ------ ------ Channel Beltw� Radvas of Curvature (ft) ------ ------ ------ ------ ------ ------ Meander Wavelength (ft) ------ ------ ------ ------ ------ ------ Additional Reach Parameters BF slope d . 1 d8 d' ------------------------------------ Eroding Table 8e. Monitoring Data - Dimensional Morphology Summary (Dimensional Parameters - Cross Sections) Mud Lick Creek Mitis ation Proiect - NCDMS Protect Number 93482 Table 8b. Monitoring Data - Stream Reach Data Summary Mud Lick Creek Mitigation Project - NCDMS Project Number 93482 Cross Section 7 East Branch Cross Section 8 East Branch Cross Section 9 East Branch) Parameter Riffle Pool Riffle JL— Dimension and Substrate - Riffle Only Dimension MYO MY1 MY2 MY3 MY4 MY5 MY5+ MYO MY1 MY2 MY3 MY4 MY5 MY5+ MYO MY1 MY2 MY3 MY4 MY5 MY5+ BF Width ft 8.9 7.6 16.6 Floodprone Width (ft) (approx) 100.0 NA 100.0 BF Mean Depth (ft) 0.8 1.4 0.6 BF Max Depth (ft) 1.2 2.4 1.5 Low Bank Height 1.2 2.4 1.5 BF Cross Sectional Area (ft) 6.7 1 10.5 1 1 1 1 1 1 1 10.6 Width/Depth Ratio 11.8 NA 26.0 Entrenchment Ratio 11.2 NA 6.0 Bank Height Ratio 1.0 1.0 1.0 d50 mm 14.3 14.3 Table 8b. Monitoring Data - Stream Reach Data Summary Mud Lick Creek Mitigation Project - NCDMS Project Number 93482 Dimension and Substrate - Riffle Only BF Max Depth (ft) BF Cross Sectional Area (ft) Erit,enchinerit Ran. Bank Height Ratio ------ ------ ------ ------ ------ ------ ------ ------ ------ ------ ------ ------ ------ ------ ------ ------ ------ ------ - - ------ ------ ------ ------ ------ ------ Additional Reach Parameters Rosgen Classification Channel Thalweg Length (ft) C ' '-. o� Appendix E. As -built Plan Sheets Asbuilt Baseline Monitoring Report (Final) Appendices Mud Lick Creek Mitigation Site (DMS Project # 93482) CERTIFICATE OF ACCURACY OF MAPPING I, DAVID K. ALLEY, CERTIFY THAT THIS PROJECT WAS COMPLETED UNDER MY DIRECT AND RESPONSIBLE CHARGE FROM AN ACTUAL SURVEY MADE UNDER MY SUPERVISION; THAT THIS TOPOGRAPHIC SURVEY WAS PERFORMED AT THE 95 PERCENT CONFIDENCE LEVEL TO MEET THE FEDERAL GEOGRAPHIC DATA COMMITTEE STANDARDS; THAT THIS SURVEY WAS PERFORMED TO MEET THE REQUIREMENTS FOR A TOPOGRAPHIC/PLANIMETRIC SURVEY TO THE ACCURACY OF CLASS AA AND VERTICAL ACCURACY WHEN APPLICABLE TO THE CLASS A STANDARD, AND THAT THE ORIGINAL DATA WAS OBTAINED ON FEBRUARY 19 2015; THAT THE SURVEY WAS COMPLETED ON FEBRUARY 20, 2015; AND ALL COORDIANTES ARE BASED ON NCGS VRS-NETWORK NAD83-(2011) AND ALL ELEVATIONS AREA BASED ON NCGS VRS-NETWORK NAVD 88 AND THAT THIS MAP WAS PREPARED IN ACCORDANCE WITH THE STANDARDS AND PRACTICE FOR LAND SURVEYING AS OUTLINED BY THE NC ADMINISTRATION CODE TITLE 21, CHAPTER 56. WITNESS MY HAND D OFFIC SEALTHI 10 DAY OF AUGUST 2017. Wcsrci #� VICINITY MAP NOT TO SCALE L -44x2 CAW ;� LICENSE NO. -- PROFES ONAL D YOR s •.'�y •� �y►• 'T :'C SEAL r: �.•9s 49 NOTES:t�/It���� 1. RAW ERROR OF CLOSURE 1:10,000+, MISCLOSURE WAS DISTRIBUTED BY COMPASS RULE. 2. AREA DETERMINED BY COORDINATE COMPUTATIONS. 3. DISTANCES SHOWN ARE HORIZONTAL GROUND DISTANCES UNLESS NOTED OTHERWISE. 4. CONTOUR INTERVAL = 1 FOOT 5. THE HORIZONTAL (NAD 83/2011) AND VERTICAL (NAVD 88) DATUM WAS ESTABLISHED BY OTHERS. SEE REFERENCE'S SHOWN HEREON. 6. THIS SURVEY IS SUBJECT TO ANY AND ALL FACTS THAT MY BE DISCLOSED BY A FULL TITLE SEARCH, WHICH HAS NOT BEEN FURNISHED TO SURVEYOR AS OF THIS DATE. 7. THE EXISTING CONTOURS SHOWN HEREON IN COLOR WERE PROVIDED BY OTHERS AND ARE SUBJECT TO THE ACCURACY THEREOF. 8. THE FIELD WORK WAS PERFORMED FROM JULY 17-18, 2017. REFERENCES: PROJECT CONTROL 1. PLAT ENTITLED "FINAL PLAT MUDLICK CREEK (EEP 939485, SPO 19 -BD) ADDITIONAL CP #4 (NAD83/NAVD 88) ACREAGE TO NCDOT PROJECT U-2524WM, PROPERTY OF GRAYSON C. THOMAS HEIRS" NORTHING-751,377.7236 FASTING-1,870,842.0187 RECORDED NOVEMBER 13, 2015 IN PLAT SLIDE 2015-265 & 266, CHATHAM COUNTY REGISTRY. ELEVATION -587.54' 2. PLAT ENTITLED "CONSERVATION PROJECT U-2524WM THOMAS TRACT" RECORDED DECEMBER 2, 2004 IN PLAT SLIDE 2004-393 & 394, CHATHAM COUNTY REGISTRY. 3. ALL DEEDS AND MAPS SHOWN HEREON. PROJECT CONTROL NCDOT "THOMAS 1- (NAD83/NAVD 88) NORTHING -751,100.7723' EASTING-1,869,878.4481' ELEVATION -610.85' VAN AA T11I F LEGEND EXISTING IRON PIN O EIP - EXISTING REBAR O EIR NO POINT SET • NPS IRON REBAR SET • IRS CABLE PEDESTAL nc TELEPHONE MANHOLE CT) TELEPHONE PEDESTAL T FLOOD LIGHT GUY WIRE m LIGHT POLE ELECTRIC MANHOLE QE \\ ELECTRIC METER Q \ ELECTRIC TRANSFORMER ® \ UTILITY POLE 1� \ BOLLARD o �,\d'y GAS METER GAS VALVE ®GV y���a�� SEWER CLEAN OUT O \ SEWER MANHOLE QS WOMEN rmL�, SIGN CATCH BASIN ❑ CBS---�€ CURB INLET MCI \ DROP \ YARD INLET Q DI / YI FLARED END SECTION 31e.00 ...... . \. STORM MANHOLE HANDICAP 3Il¢ (`� 3».? °Q ° MUD LICK CREEK Ate» ,� 00 FIRE HYDRANT WATER MANHOLE ® o \ ✓ +p' , - WATER METER ��__=` {• WATER VALVE ® WV 0 WELL US -V MANHOLE Q MH $. 0,0 °I PRESSURE INDICATOR VALVE ® PIV � �F TREE, RIGHT-OF-WAY R/W \4& PROPERTY LINE P/L PARCEL IDENTIFICATION NO. P.I.N. CONCRETE MONUMENT CM CHORD CH SIGHT EASEMENT SE SHf� j',1 j,L'j 7T 2 DEED BOOK DB PLAT BOOK PB CURB AND GUTTER C&G REINFORCED CONC PIPE RCP CORRUGATED METAL PIPE CMP CORRUGATED PLASTIC PIPE CPP BOUNDARY LINE RIGHT-OF-WAY LINE - -- UNSURVEYED PROPERTY LINE CONSERVATION EASEMENT — CE CE AA FENCE (WIRE) LINE x —x —x F aAraax J¢�mainfele TAx Pw Q7AP 1',1�41{.OW —SHEET 5 i SHEET 4— � E� E v, r ENCE (WOOD) LINE x— x— x _71— SHEET 6-- --- SHEET S BANKFULL ..... ..... — 'THOMAS 2- NCDOT THOMAS 2*(NAD83/NAVD 88) cT v _ NORTHING -750,346.4685 - � y� $ 17111x' EASTING-1,870,442.8109' yr EP ELEVATION -600.80' EDGE OF PAVEMENT r c \% GRADING LIMITS --------------- % CRUTCHMID CROSSROADS —❑NU—aHU ------- DW— CH TIE LINE „yam 109+00cc M• / Cz OHARUE COOPER pD N c sm R MINOR CONTOUR LINE ._...... .. ....... YamIM RDD h 4'� ` 2\ s i �mm\ C ° 1 WETLAND ZONE LINE ORADY SLER CONSTRUCTED RIFFLE LOG VANE 9000aft os a qr CERTIFICATE OF ACCURACY OF MAPPING I, DAVID K. ALLEY, CERTIFY THAT THIS PROJECT WAS COMPLETED UNDER MY DIRECT AND RESPONSIBLE CHARGE FROM AN ACTUAL SURVEY MADE UNDER MY SUPERVISION; THAT THIS TOPOGRAPHIC SURVEY WAS PERFORMED AT THE 95 PERCENT CONFIDENCE LEVEL TO MEET THE FEDERAL GEOGRAPHIC DATA COMMITTEE STANDARDS; THAT THIS SURVEY WAS PERFORMED TO MEET THE REQUIREMENTS FOR A TOPOGRAPHIC/PLANIMETRIC SURVEY TO THE ACCURACY OF CLASS AA AND VERTICAL ACCURACY WHEN APPLICABLE TO THE CLASS A STANDARD, AND THAT THE ORIGINAL DATA WAS OBTAINED ON FEBRUARY 19 2015; THAT THE SURVEY WAS COMPLETED ON FEBRUARY 20, 2015; AND ALL COORDIANTES ARE BASED ON NCGS VRS-NETWORK NAD83-(2011) AND ALL ELEVATIONS AREA BASED ON NCGS VRS-NETWORK NAVD 88 AND THAT THIS MAP WAS PREPARED IN ACCORDANCE WITH THE STANDARDS AND PRACTICE FOR LAND SURVEYING AS OUTLINED BY THE NC ADMINISTRATION CODE TITLE 21, CHAPTER 56. WITNESS MY HAND D OFFIC SEALTHI 10 DAY OF AUGUST 2017. Wcsrci #� VICINITY MAP NOT TO SCALE L -44x2 CAW ;� LICENSE NO. -- PROFES ONAL D YOR s •.'�y •� �y►• 'T :'C SEAL r: �.•9s 49 NOTES:t�/It���� 1. RAW ERROR OF CLOSURE 1:10,000+, MISCLOSURE WAS DISTRIBUTED BY COMPASS RULE. 2. AREA DETERMINED BY COORDINATE COMPUTATIONS. 3. DISTANCES SHOWN ARE HORIZONTAL GROUND DISTANCES UNLESS NOTED OTHERWISE. 4. CONTOUR INTERVAL = 1 FOOT 5. THE HORIZONTAL (NAD 83/2011) AND VERTICAL (NAVD 88) DATUM WAS ESTABLISHED BY OTHERS. SEE REFERENCE'S SHOWN HEREON. 6. THIS SURVEY IS SUBJECT TO ANY AND ALL FACTS THAT MY BE DISCLOSED BY A FULL TITLE SEARCH, WHICH HAS NOT BEEN FURNISHED TO SURVEYOR AS OF THIS DATE. 7. THE EXISTING CONTOURS SHOWN HEREON IN COLOR WERE PROVIDED BY OTHERS AND ARE SUBJECT TO THE ACCURACY THEREOF. 8. THE FIELD WORK WAS PERFORMED FROM JULY 17-18, 2017. REFERENCES: PROJECT CONTROL 1. PLAT ENTITLED "FINAL PLAT MUDLICK CREEK (EEP 939485, SPO 19 -BD) ADDITIONAL CP #4 (NAD83/NAVD 88) ACREAGE TO NCDOT PROJECT U-2524WM, PROPERTY OF GRAYSON C. THOMAS HEIRS" NORTHING-751,377.7236 FASTING-1,870,842.0187 RECORDED NOVEMBER 13, 2015 IN PLAT SLIDE 2015-265 & 266, CHATHAM COUNTY REGISTRY. ELEVATION -587.54' 2. PLAT ENTITLED "CONSERVATION PROJECT U-2524WM THOMAS TRACT" RECORDED DECEMBER 2, 2004 IN PLAT SLIDE 2004-393 & 394, CHATHAM COUNTY REGISTRY. 3. ALL DEEDS AND MAPS SHOWN HEREON. PROJECT CONTROL NCDOT "THOMAS 1- (NAD83/NAVD 88) NORTHING -751,100.7723' EASTING-1,869,878.4481' ELEVATION -610.85' VAN AA T11I F LEGEND EXISTING IRON PIN O EIP - EXISTING REBAR O EIR NO POINT SET • NPS IRON REBAR SET • IRS CABLE PEDESTAL nc TELEPHONE MANHOLE CT) TELEPHONE PEDESTAL T FLOOD LIGHT GUY WIRE m LIGHT POLE ELECTRIC MANHOLE QE \\ ELECTRIC METER Q \ ELECTRIC TRANSFORMER ® \ UTILITY POLE 1� \ BOLLARD o �,\d'y GAS METER GAS VALVE ®GV y���a�� SEWER CLEAN OUT O \ SEWER MANHOLE QS WOMEN rmL�, SIGN CATCH BASIN ❑ CBS---�€ CURB INLET MCI \ DROP \ YARD INLET Q DI / YI FLARED END SECTION 31e.00 ...... . \. STORM MANHOLE HANDICAP 3Il¢ (`� 3».? °Q ° MUD LICK CREEK Ate» ,� 00 FIRE HYDRANT WATER MANHOLE ® o \ ✓ +p' , - WATER METER ��__=` {• WATER VALVE ® WV 0 WELL US -V MANHOLE Q MH $. 0,0 °I PRESSURE INDICATOR VALVE ® PIV � �F TREE, RIGHT-OF-WAY R/W \4& PROPERTY LINE P/L PARCEL IDENTIFICATION NO. P.I.N. CONCRETE MONUMENT CM CHORD CH SIGHT EASEMENT SE SHf� j',1 j,L'j 7T 2 DEED BOOK DB PLAT BOOK PB CURB AND GUTTER C&G REINFORCED CONC PIPE RCP CORRUGATED METAL PIPE CMP CORRUGATED PLASTIC PIPE CPP BOUNDARY LINE RIGHT-OF-WAY LINE - -- UNSURVEYED PROPERTY LINE CONSERVATION EASEMENT — CE CE AA FENCE (WIRE) LINE x —x —x F aAraax J¢�mainfele TAx Pw Q7AP 1',1�41{.OW —SHEET 5 i SHEET 4— � E� E v, r ENCE (WOOD) LINE x— x— x _71— SHEET 6-- --- SHEET S BANKFULL ..... ..... — 'THOMAS 2- NCDOT THOMAS 2*(NAD83/NAVD 88) THALWEG v _ NORTHING -750,346.4685 - EDGE OF GRAVEL EG EASTING-1,870,442.8109' EP ELEVATION -600.80' EDGE OF PAVEMENT r c \% GRADING LIMITS --------------- % OVERHEAD UTILITY —❑NU—aHU ------- DW— CH TIE LINE „yam 109+00cc M• / Cz MAJOR CONTOUR LINE MINOR CONTOUR LINE ._...... .. ....... YamIM RDD h 4'� ` 2\ s i �mm\ C WATER LINE WETLAND ZONE LINE CONSTRUCTED RIFFLE LOG VANE 9000aft BRUSH TOE PDF processed with CutePDF evaluation edition www.CutePDF.com e�sep°�s SHEET I OF 7 AS BUILT SURVEY FOR: NORTH STATE ENVIRONMENTAL, INC OF. MUD LICK CREEK STREAM RESTORATION" OWNER: GRAYSON C. THOMAS, HEIRS 319 AUGUSTA DRIVE STATESVILLE, NC 28625 TAX PIN: 8775-12-3214.000 DEED BOOK JS, PAGE 143 TAX PIN: 8775-01-6345.000 DEED BOOK 411, PAGE 846 IA ACRES +/- (TOTAL) Allied Associates, P.A. 4720 KESTER MILL ROAD PHONE (336) 765-2377 WINSTON—SALEM, N.C. 27103 GRAPHIC SCALE www.alliedapa.com NC LICENSE #C-2198 0 50 100 200 400 SCALE TOWNSHIP COUNTY STATE DATE 1 " = 100' ALBRIGHT CHATHAM NORTH CAROLINA 08/01/17 ( IN FEET ) SURVEYED: MAPPED: JOB NO. MAP NO. TDS ft. 1 inch = 100 PJ TR DA PA170611 MLC.dw9 MLC © AlUed Assoc., P.A. 2017 a� — —-- _71— SHEET 6-- --- SHEET S ---- PROJECT CONTROL CP #6 (NAD83/NAVD 88) } / NORTHING -751,064.1633 --�, MOL GSHEET CATE r c \% m 0 V�p % iia 10 r. �;_ EASTD CH „yam 109+00cc M• / Cz U){,-1 m ' .. � Gm YamIM RDD h 4'� ` 2\ s i �mm\ C �^^ MEL GAN / / / aura a mous leis TAX Pik pl7�L-0-�OIS000 a SHEET I OF 7 AS BUILT SURVEY FOR: NORTH STATE ENVIRONMENTAL, INC OF. MUD LICK CREEK STREAM RESTORATION" OWNER: GRAYSON C. THOMAS, HEIRS 319 AUGUSTA DRIVE STATESVILLE, NC 28625 TAX PIN: 8775-12-3214.000 DEED BOOK JS, PAGE 143 TAX PIN: 8775-01-6345.000 DEED BOOK 411, PAGE 846 IA ACRES +/- (TOTAL) Allied Associates, P.A. 4720 KESTER MILL ROAD PHONE (336) 765-2377 WINSTON—SALEM, N.C. 27103 GRAPHIC SCALE www.alliedapa.com NC LICENSE #C-2198 0 50 100 200 400 SCALE TOWNSHIP COUNTY STATE DATE 1 " = 100' ALBRIGHT CHATHAM NORTH CAROLINA 08/01/17 ( IN FEET ) SURVEYED: MAPPED: JOB NO. MAP NO. TDS ft. 1 inch = 100 PJ TR DA PA170611 MLC.dw9 MLC © AlUed Assoc., P.A. 2017 1 / � PROJECT CONTROL CP #6 (NAD83/NAVD 88) } / NORTHING -751,064.1633 / EASTING-1,871,667.0262' ELEVATION -602.61' I� 100 SHEET I OF 7 AS BUILT SURVEY FOR: NORTH STATE ENVIRONMENTAL, INC OF. MUD LICK CREEK STREAM RESTORATION" OWNER: GRAYSON C. THOMAS, HEIRS 319 AUGUSTA DRIVE STATESVILLE, NC 28625 TAX PIN: 8775-12-3214.000 DEED BOOK JS, PAGE 143 TAX PIN: 8775-01-6345.000 DEED BOOK 411, PAGE 846 IA ACRES +/- (TOTAL) Allied Associates, P.A. 4720 KESTER MILL ROAD PHONE (336) 765-2377 WINSTON—SALEM, N.C. 27103 GRAPHIC SCALE www.alliedapa.com NC LICENSE #C-2198 0 50 100 200 400 SCALE TOWNSHIP COUNTY STATE DATE 1 " = 100' ALBRIGHT CHATHAM NORTH CAROLINA 08/01/17 ( IN FEET ) SURVEYED: MAPPED: JOB NO. MAP NO. TDS ft. 1 inch = 100 PJ TR DA PA170611 MLC.dw9 MLC © AlUed Assoc., P.A. 2017 VICINITY MAP NOT TO SCALE STEEL GATE T AS PER E=6E=C �o�� ERVATION EASEMEN E 394 CE = CE XX�E XCE CONSLAT SLIDE 2004, PA_ E �E ---A — C�- ; ,n P � CE X CE CE — ♦ �� �\\ 5 STRAND BARB x CE = — CE �� C WIRE FENCE — X X CE — CE CE — CE � X CE X CE011, CE X CE X CE CE ♦ �I CE X — X C CE CE , X XCE E — CE CE CE � _% GG� 316+00 �7 , zc�� z 318+0041 1 ♦ _� 40 04 40 < y _ _ _ •. 00 ICK CRE MUD LIC ; _--- \\ '�� x / - x585.8' \ . , - �\ l� � ► ` '•\� \ \ � � i // / 1 ' //� � � � _-'- 585.7' \ -- .' 585.9'-'' ♦ •�•�• — 4* ♦ ••. LEGEND EXISTING IRON PINO EIP 4* 4# EXISTING REBAR O EIR NO POINT SET • NPs C1� �� 585.7' IRON REBAR SET • IRS ���� _r CABLE PEDESTAL © `�� __ 584.7`' O ` — \ TELEPHONE MANHOLE T -� � x x,�------------_- ,, , —� TELEPHONE PEDESTAL ❑T ao- FLOOD LIGHT � 584.3' ��� 585.4' i E A`SE GUY WIRE m �� �— 3� 3�— �C ��`�_j 85.4 ��, -30 R ��101 0♦� LIGHT POLE � X _3_3_—x33 � ELECTRIC MANHOLE T �� 3 �C �� SE 20 ELECTRIC METER ❑E / ��3 � 3C � % 3C SL 3� � CO LAT IDE ELECTRIC TRANSFORMER ® t� \ �rD x� 3� 3 % 33 P UTILITY POLE a V � � �C �_ % -•� �ASLME ER © F,�, 15p/ STRAND BARB C =�--�— ���' GAS VALVE ®GV \ �'<� WIRE FENCE �'--���-3��3C�X SEWER CLEAN OUT O S 10\ EWER MANHOLE WETLAND ZONE LINE °,0 \ <O �\ J \ \ O \ CE CE — x x x \ x x x \ Hu OHu oHu CONSTRUCTED RIFFLE LOG VANE BRUSH TOE SHEE T 2 OF 7 AS BUILT SURVEY FOR: NOR TH S TA TE ENVIRONMENTAL, INC OF: "MUD LICK CREEK STREAM RES T ORA TION" OWNER: GRAYSON C. THOMAS, HEIRS 319 AUGUSTA DRIVE STATESVILLE, INC 28625 TAX PIN: 8775-12-3214.000 DEED BOOK JS, PAGE 143 TAX PIN: 8775-01-6345.000 DEED BOOK 411. PAGE 846 VA ACRES +/- (TOTAL) Allied Associates, P.A. SCALE 4720 KESTER MILL ROAD PHONE (336) 765-2377 WINSTON—SALEMFAX 760-8 GRAPHIC SCAILE www.allledapacomN.C. 27103NC LICENSE #C82198 20 0 10 20 40 80 SCALE TOWNSHIP COUNTY STATE DATE " = 20' ALBRIGHT CHATHAM NORTH CAROLINA 08/01/17 ( IN FEET ) SURVEYED: MAPPED: JOB NO. MAP NO. TDS 1 inch = 20 ft. PJ TR DA PA170611 MLC.dwg MLC © AWed Assoc., P A 2017 SIGN -� CATCH BASIN ❑ CB CURB INLET D CI DROP \ YARD INLET ❑Q DI / YI FLARED END SECTION STORM MANHOLE QD HANDICAP FIRE HYDRANT WATER MANHOLE QW WATER METER ❑w WATER VALVE ® WV WELL WO MANHOLE (DMH PRESSURE INDICATOR VALVE ® PIV TREE O RIGHT-OF-WAY R/W PROPERTY LINE P/L PARCEL IDENTIFICATION NO. P.I.N. CONCRETE MONUMENT CM CHORD CH SIGHT EASEMENT SE DEED BOOK DB PLAT BOOK PB CURB AND GUTTER C&G REINFORCED CONC PIPE RCP CORRUGATED METAL PIPE CMP CORRUGATED PLASTIC PIPE CPP BOUNDARY LINE RIGHT-OF-WAY LINE UNSURVEYED PROPERTY LINE CONSERVATION EASEMENT — FENCE (WIRE) LINE FENCE (WOOD) LINE BANKFULL — THALWEG — EDGE OF GRAVEL E EDGE OF PAVEMENT F GRADING LIMITS --- OVERHEAD UTILITY u TIE LINE MAJOR CONTOUR LINE MINOR CONTOUR LINE WATER LINE WETLAND ZONE LINE °,0 \ <O �\ J \ \ O \ CE CE — x x x \ x x x \ Hu OHu oHu CONSTRUCTED RIFFLE LOG VANE BRUSH TOE SHEE T 2 OF 7 AS BUILT SURVEY FOR: NOR TH S TA TE ENVIRONMENTAL, INC OF: "MUD LICK CREEK STREAM RES T ORA TION" OWNER: GRAYSON C. THOMAS, HEIRS 319 AUGUSTA DRIVE STATESVILLE, INC 28625 TAX PIN: 8775-12-3214.000 DEED BOOK JS, PAGE 143 TAX PIN: 8775-01-6345.000 DEED BOOK 411. PAGE 846 VA ACRES +/- (TOTAL) Allied Associates, P.A. SCALE 4720 KESTER MILL ROAD PHONE (336) 765-2377 WINSTON—SALEMFAX 760-8 GRAPHIC SCAILE www.allledapacomN.C. 27103NC LICENSE #C82198 20 0 10 20 40 80 SCALE TOWNSHIP COUNTY STATE DATE " = 20' ALBRIGHT CHATHAM NORTH CAROLINA 08/01/17 ( IN FEET ) SURVEYED: MAPPED: JOB NO. MAP NO. TDS 1 inch = 20 ft. PJ TR DA PA170611 MLC.dwg MLC © AWed Assoc., P A 2017 LEGEND TREE RIGHT—OF—WAY R/W I \ \`l� \\ ♦ I J# j ' PROPERTY LINE P/L ����r•�----,� m ♦♦;�\ \/ ♦� n ; J# 41 PARCEL IDENTIFICATION NO. P.I.N. e. SHEET m ,CONCRETE MONUMENT CM e. % '� �♦ CHORD CH 7������e•e.e.�e.� ♦\ \ /1 \ ��♦ i �MfM I ♦ \� 585.3 J* SIGHT EASEMENT SE e■ ♦� \ \ / \ %% , , DEED BOOK DB 4UPLAT BOOK PBcG �V SHEET �-----_--������e.���------ ♦,;\\\\\\\ / �X m 'i ,� CURB AND GUTTER 3 �� ��`� , REINFORCED CONC PIPE RCP CORRUGATED METAL PIPE CMP ,\ CPP \ �O CORRUGATED PLASTIC PIPE /, tV n \ ♦,\ 0 \ \ 1 e. -- BOUNDARY LINE Q kU m ♦,\ \\ ����� ���----- i j / RIGHT—OF—WAY LINE — — — — _ _ I ♦,\ \ \ \ op J* UNSURVEYED PROPERTY LINE — IT t \ 586.6, , 1 — / CONSERVATION EASEMENT CE CE �G / \\ / X FENCE (WIRE) LINE x x x FENCE (WOOD) LINE x x x `V / / ♦ m I I BANKFULL = — — — THALWEG EDGE OF GRAVEL EP / EDGE OF PAVEMENT / m / GRADING LIMITS - --———— —— — — — — —- / _30./f OVERHEAD UTILITY TIE LINE / -30 OO / 587.6) MAJOR CONTOUR LINE -30 (�X i,// /// X # � ' 1 1 MINOR CONTOUR LINE JO /-/�// �/ ,, � 1 1 WATER LINE — — — — —— --_,-� /� WETLAND ZONE LINE 0 / / -' CONSTRUCTED RIFFLE OLOG VANE I I BRUSH TOE 4 144, i 4 1 1 ! —5g5 ' //C 0__ - QQj P � 5 PES i GE / ' oQ- `►� GE �� SEMEN �E 3g 0* /� STEEL o GATE / ��j 4 t4 J* /4f� ;' Co �/ ♦ / Q' U 0 �If ♦ O 40P 41 �, / • CE X �XCE O 41 O �E w 1 �, M ; �� 1 < w / / STAGING ��`� �` 7�91, AREA/'4#40, Ic 4o J 41 ,♦ ` `w----- I 1---------'-- I �� ' t �7 ♦ w , U � XO � 0 % ,'�� i x SHEE T 3 OF 7 , ! , .�_ _ '~ ` \ `♦ AS BUILT SURVEY 1 . 1 JJ, ��� I _ 4'♦ GRAYSON C. THOMAS, HEIRS %% ,,-'' FOR: NORTH STATE DB 411, PG. 846 �-' 585.9X r , ENVIRONMENTAL, INC TAX PIN: 8775-01-6345.000 OF. MUD LICK CREEK ------� ; X585.8' N�-...... �STREAM RESTORATION / I 588.0 \ I J* OWNER: GRAYSON C. THOMAS, HEIRS X \� I 319 AUGUSTA DRIVE %585.4 ----.'--~♦,, STATESVILLE, NO 28625 -- ------`-. -4 ---- �� 4# TAX PIN: 8775-12-3214.000 585.7' -o 586.4x �, 586.4X � DEED BOOK JS, PAGE 143 --- TAX PIN: 8775-01-6345.000 -- ♦♦ I ,-/ DEED BOOK 41 1, PAGE 846 —K ♦ 0 NILA ACRES +/— (TOTAL) ♦, 3��X 5 PER -- Allied Associates, P.A. �— •CEMENT �' 3g q STEEL WINSTON—SALEM, N.C. 27103 4720 KESTER MILL ROAD PHONE (336) 765-2377 PAGE GATE GRAPHIC SCALE www.alliedapa.com NO LICENSE #C-2198 2-0(%, O 0 /I_' 20 0 10 20 40 80 'LJ �L, SCALE TOWNSHIP COUNTY STATE DATE 1 " = 20' ALBRIGHT CHATHAM NORTH CAROLINA 08/01/17 ( IN FEET SURVEYED: MAPPED: JOB NO. MAP NO. TDS 1 inch = 20 ft. PJ TR DA PAI 70611 MLC.dwg MLC © Allied Assoc, P.A. 2017 EXISTING IRON PIN O EIP EXISTING REBAR O EIR Srm NO POINT SET • NPS IRON REBAR SET • IRS R CABLE PEDESTAL `R"'C"F'gD ortossnoaus TELEPHONE MANHOLE Q � TELEPHONE PEDESTAL ❑T FLOOD LIGHT RD 4"0� " CUUWRS. RD 41 GUY WIRE m RLE COMER LIGHT POLE ELECTRIC MANHOLE Q ELECTRIC METER ❑E Gwy 511SR RD a ELECTRIC TRANSFORMER UTILITY POLE a �S BOLLARD o GAS METER AYf2i GAS VALVE ®GV SEWER CLEAN OUT O SEWER MANHOLE Q SIGN —� CATCH BASIN ❑ CB CURB INLET CI DROP \YARD INLET ❑Q DI / YI VICINITY MAP NOT TO SCALE FLARED END SECTION STORM MANHOLE QD HANDICAP FIRE HYDRANT WATER MANHOLE QW WATER METER Q WATER VALVE ® WV WELL WO MANHOLE QMH PRESSURE INDICATOR VALVE ® PIV TREE RIGHT—OF—WAY R/W I \ \`l� \\ ♦ I J# j ' PROPERTY LINE P/L ����r•�----,� m ♦♦;�\ \/ ♦� n ; J# 41 PARCEL IDENTIFICATION NO. P.I.N. e. SHEET m ,CONCRETE MONUMENT CM e. % '� �♦ CHORD CH 7������e•e.e.�e.� ♦\ \ /1 \ ��♦ i �MfM I ♦ \� 585.3 J* SIGHT EASEMENT SE e■ ♦� \ \ / \ %% , , DEED BOOK DB 4UPLAT BOOK PBcG �V SHEET �-----_--������e.���------ ♦,;\\\\\\\ / �X m 'i ,� CURB AND GUTTER 3 �� ��`� , REINFORCED CONC PIPE RCP CORRUGATED METAL PIPE CMP ,\ CPP \ �O CORRUGATED PLASTIC PIPE /, tV n \ ♦,\ 0 \ \ 1 e. -- BOUNDARY LINE Q kU m ♦,\ \\ ����� ���----- i j / RIGHT—OF—WAY LINE — — — — _ _ I ♦,\ \ \ \ op J* UNSURVEYED PROPERTY LINE — IT t \ 586.6, , 1 — / CONSERVATION EASEMENT CE CE �G / \\ / X FENCE (WIRE) LINE x x x FENCE (WOOD) LINE x x x `V / / ♦ m I I BANKFULL = — — — THALWEG EDGE OF GRAVEL EP / EDGE OF PAVEMENT / m / GRADING LIMITS - --———— —— — — — — —- / _30./f OVERHEAD UTILITY TIE LINE / -30 OO / 587.6) MAJOR CONTOUR LINE -30 (�X i,// /// X # � ' 1 1 MINOR CONTOUR LINE JO /-/�// �/ ,, � 1 1 WATER LINE — — — — —— --_,-� /� WETLAND ZONE LINE 0 / / -' CONSTRUCTED RIFFLE OLOG VANE I I BRUSH TOE 4 144, i 4 1 1 ! —5g5 ' //C 0__ - QQj P � 5 PES i GE / ' oQ- `►� GE �� SEMEN �E 3g 0* /� STEEL o GATE / ��j 4 t4 J* /4f� ;' Co �/ ♦ / Q' U 0 �If ♦ O 40P 41 �, / • CE X �XCE O 41 O �E w 1 �, M ; �� 1 < w / / STAGING ��`� �` 7�91, AREA/'4#40, Ic 4o J 41 ,♦ ` `w----- I 1---------'-- I �� ' t �7 ♦ w , U � XO � 0 % ,'�� i x SHEE T 3 OF 7 , ! , .�_ _ '~ ` \ `♦ AS BUILT SURVEY 1 . 1 JJ, ��� I _ 4'♦ GRAYSON C. THOMAS, HEIRS %% ,,-'' FOR: NORTH STATE DB 411, PG. 846 �-' 585.9X r , ENVIRONMENTAL, INC TAX PIN: 8775-01-6345.000 OF. MUD LICK CREEK ------� ; X585.8' N�-...... �STREAM RESTORATION / I 588.0 \ I J* OWNER: GRAYSON C. THOMAS, HEIRS X \� I 319 AUGUSTA DRIVE %585.4 ----.'--~♦,, STATESVILLE, NO 28625 -- ------`-. -4 ---- �� 4# TAX PIN: 8775-12-3214.000 585.7' -o 586.4x �, 586.4X � DEED BOOK JS, PAGE 143 --- TAX PIN: 8775-01-6345.000 -- ♦♦ I ,-/ DEED BOOK 41 1, PAGE 846 —K ♦ 0 NILA ACRES +/— (TOTAL) ♦, 3��X 5 PER -- Allied Associates, P.A. �— •CEMENT �' 3g q STEEL WINSTON—SALEM, N.C. 27103 4720 KESTER MILL ROAD PHONE (336) 765-2377 PAGE GATE GRAPHIC SCALE www.alliedapa.com NO LICENSE #C-2198 2-0(%, O 0 /I_' 20 0 10 20 40 80 'LJ �L, SCALE TOWNSHIP COUNTY STATE DATE 1 " = 20' ALBRIGHT CHATHAM NORTH CAROLINA 08/01/17 ( IN FEET SURVEYED: MAPPED: JOB NO. MAP NO. TDS 1 inch = 20 ft. PJ TR DA PAI 70611 MLC.dwg MLC © Allied Assoc, P.A. 2017 VICINITY MAP NOT TO SCALE LEGEND EXISTING IRON PIN O EIP EXISTING REBAR O EIR NO POINT SET • NPS IRON REBAR SET • IRS CABLE PEDESTAL nc TELEPHONE MANHOLE 0 TELEPHONE PEDESTAL ❑T FLOOD LIGHT MLC GUY WIRE m LIGHT POLE ELECTRIC MANHOLE 0 ELECTRIC METER ❑E ELECTRIC TRANSFORMER UTILITY POLEBOL 171 GASLMETER nG GAS VALVE ®GV SEWER CLEAN OUT O SEWER MANHOLE SIGN -o- CATCH BASIN ❑ CB CURB INLET CI DROP \ YARD INLET ❑o DI / Y FLARED END SECTION STORM MANHOLE DQ HANDICAP FIRE HYDRANT WATER MANHOLE OW WATER METER ❑W WATER VALVE ® WV WELL OW MANHOLE Q MH PRESSURE INDICATOR VALVE ® PIV TREE a RIGHT-OF-WAY R/W PROPERTY LINE P/L PARCEL IDENTIFICATION NO. P.I.N. CONCRETE MONUMENT CM CHORD CH SIGHT EASEMENT SE DEED BOOK DB PLAT BOOK PB CURB AND GUTTER C&G REINFORCED CONC PIPE RCP CORRUGATED METAL PIPE CMP CORRUGATED PLASTIC PIPE CPP BOUNDARY LINE - RIGHT-OF-WAY LINE -- -- UNSURVEYED PROPERTY LINE CONSERVATION EASEMENT CE CE — FENCE (WIRE) LINE x x x FENCE (WOOD) LINE x x x BANKFULL —. • • • —. • • • — THALWEG — — — — — EDGE OF GRAVEL EG EDGE OF PAVEMENT Ep GRADING LIMITS OVERHEAD UTILITY TIE LINE MAJOR CONTOUR LINE MINOR CONTOUR LINE WATER LINE WETLAND ZONE LINE OHU OHU OHU CONSTRUCTED RIFFLE LOG VANE CE X CE X CE C E CE X CE X CE X CE X CE X CE X CE XCE T E 6E STEEL GATE GRAPHIC SCALE - �, yr' �'� 20 0 10 20 40 80 \\ 588.2' r _ _ \ �. IN FEET ) + ► 1 inch = 20 ft. 0 ; (Y) I I i ! 582.1 \ ` "m k2O \ \m \%� N,�_583.2'• 00 . 588.0' J \ I O \ \ GRAYSON C. THOMAS, HEIRS DB JS, PG. 143 U \ TAX PIN: 8775-11-3214.000 --__--- STEEL m GATE �------------------ -.-.-----SHEET T z, % /. /%% </D/ % C SHEET a ir , /' /� /,yIoo \ 0 B Pig --- I•r 4f ►I I:� I IIS \ � � I: I � �• i k cc �X � -- 588.2 � � f I • � cF c� 0 '/ �') I� 44+00 588.2' m .�� X \G Z �� ♦ / / /-,-'' 587.7' C11 ��� j = �� ,��� ., \ \ X 5 8 7.3' .1 4' I \ I _– _ . x0 \ _ 585 \ / X 587.6 o �� y`------------------------� \� \• X 586.8 ° V_r NV– un C 1'�'` 0 585.44 s -o CF � k I i .•'/� / / sem/ /'• ♦ \ //0 3, I — 585 TN I I _ r Do .1e U CFNINN i ��00 \ 4 � ► / / X 586.5 . .- U m / /j Al 0 oC0 co W � wQ C:) U� INS= c 585.35 z0• 109+00 �\48�` NV= \ em / t) , SHEE T 4 OF 7 AS BUILT SURVEY /'' --'' FOR: NORTH STATE v m / ,� I� - - - SOX X m _ _ _ _ ENVIRONMENTAL, INC / � /// X 587.2'-- � ;/ STEL U m �l1011!-;;''O' S S�R �� CE GAT OF: "MUD LICK CREEK OMAS HEIRS IW G. 846 � m STREAM RESTORATION ♦ ' ►► m — 01-6345.000 m m ^X //1:� 1 ► m1k X 1587.2' L) ♦ / ► STEEL / ,�/��� • /I i �, m< GATE ♦ � I _ S \ . m H EE T \ N SCALE \� 585.3 1" _ 20' SHEE T � _ % %\ \ \ \ % m \X SURVEYED: BRUSH TOE CHATHAM NORTH CAROLINA �_ � - ��� � � �PJ TR MAPPED: JOB NO. MAP NO. TDS OWNER: GRAYSON C. THOMAS, HEIRS 319 AUGUSTA DRIVE STATESVILLE, NC 28625 TAX PIN: 8775-12-3214.000 DEED BOOK JS, PAGE 143 TAX PIN: 8775-01 -6345.000 DEED BOOK 411, PAGE 846 ACRES +/- (TOTAL) Allied Associates, P.A. 4720 KESTER MILL ROAD PHONE (336) 765-2377 WINSTON—SALEM, N.C. 27103 www.alliedapa.com NC LICENSE #C-2198 TOWNSHIP COUNTY STATE DATE ALBRIGHT CHATHAM NORTH CAROLINA 08/01/17 MAPPED: JOB NO. MAP NO. TDS DA PA170611 MLC.dwg MLC © Allied Assoc„ P,A, 2017 v` , t x ♦,'' x 591.8' � , 7Z/7SHEET\ , - o 6 / �� 1� -"� Q ♦ a e SITE ryP C RD co 47- -OEHEET 5 le 1. +00 590.2' / x CRUX FALO CROSSROADS Ile 6/ 0 CHARLIE COOPER RD'o NRENN CULyERSDN RD G ;If 4f 4fIf E9 0C ,0? RD GRADY SRER RD / . _ a 4S Nib I ��Z 40, VICINITY MAP NOT TO SCALE 4* 4# x 4#589.4 I ,� -' / 1000,00 40 40 O / \ ��- \ 1 f I ����• 588.7' Ll% \7- A- 590.2'x \� \ \\\ ``� o . i/� 205+00 589.5'X 4,oa \ \ \\ I I zL f x 588.6' 20 \ \ \\ `� % x 588.6' %% \ I 588.5 \ \ _ 100, / \ _ I _ 22 N \. \ \ 592.6' �. �� 1 " 35 �k ; EAST BRANCH _ , `\ \ o �o I 585. 20 � `,, c 109+00 i 590.3X \ \ I \ \ f I i \ 593.6' ,, El -< �. ��"/ `,/ • �// / 591.5'.--- ��•/` �, \ \\ \�\ \\ \ x x C 000, 0 \\\ \\ \\ 594.2 i \V, C) _ - �!� I x88.5 �. O \ \\ C I I \ f / v I I G7 I— �\ _ � k _ m LEGEND // � ♦♦� �o� EXISTING IRON PIN O EIP , ♦� . (� , - \ ->1 EXISTING REBAR O EIR / � �♦ � V� O� `,, •� � \� • . \ `% n� I NO POINT SET • NPS /// ; �♦ / `\` _ ._ \ `� I ` IRON REBAR SET •IRS �, � � � \ ,, • \ \ � CABLE PEDESTAL © .� r♦♦ /� '9 \\ �\ \ `% TELEPHONE MANHOLE T D // ♦� TELEPHONE PEDESTAL FLOOD LIGHT 2\' 591. GUY WIRE 00 X LIGHT POLE eo _ n 0 \ o ELECTRIC MANHOLE 0♦ / O O 'Q \ \ 1 I C) C ❑ ELECTRIC METER �,' C'F (�� S \ Q vp \ ELECTRIC TRANSFORMER UTILITY POLEGJ �.9 �� �� �'� %, BOLLARD o R GAS METER © \N�\� (1 r// \ -�/ "% ,`� \\ \\ \ �' I I `` C� Lj _ GAS VALVE ®GV , l O \ ♦ \ \ \ I c /v SEWER CLEAN OUT O I C� \ \ ;I SEWS MANHOLE SO r ��� \ �S `,� \\\ \ STEEL 0 I 20 0 0 GRAPHIC SCALE '9 �9 -o `, \ \ \ \ I I GATE \ \ \ 1. SIGN H BASIN oCB GRAYSON C. THOMAS HEIRS DROP INLET INLET =1 CI YI • D B JS P G. 143 �� s�'� `� �� FLARED END SECTION EEL TAX PIN: 8775-11-3214.000 �j �\ \ \ \ STORM MANHOLE o ATE � �Q ``� \ � \\ \\ \� •\ \ \\�`; E\�� HANDICAP Li FIRE HYDRANT( -n ' \J WATER MANHOLE Q WATER METER ; ❑ \ F `� \ \ \\ \ WATER VALVE ® WV \, �S9 Cn ,, WELL OW �\ MANHOLE QMH --n%� C� `` \ \ \ ` �\\ c -70 1 ' 20 40 ( IN FEET ) 1 inch = 20 ft. SHEE T 5 OF 7 PRESSURE INDICATOR VALVE ® PIV `, \ \ \ \ 7X TREE RIGHT-OF-WAY R/W % C' %, \ \ \ \ \ \\• ,`• p o �1 PROPERTY LINE P/L /�- F , \ \ \ \ 1,p = PARCEL CONCRETE MONUMENT Cm N0. P. ;T "///� `,,,\ \\ \\ 1\:N, '\\\\ ,* `,, c AS CHORD CH \ \ \ \ ` \ \\ PP S -9\ ♦ \ \ \ SIGHT EASEMENT E x, /1 � \ \ \ \ \� BUILT SURVEY 0 W PLATT BOOK PB - q '�`� `\ \\ `� ��\; �'� �' I FOR: NOR TH STA TE \ �\ �� 598.3' CURB AND GUTTER C&G '— � �\� -- ENVIR ENVIRONMENTAL, INC REINFORCED EIN ORACEDDGONG PIP PE CMP '9� �,� ���,,, \\ \\ ��� r�:- = 1 CORRUGATED PLASTIC PIPE CPP • `��, \\ \�` \`� ; , ; BOUNDARY LINE RIGHT-OF-WAY LINE -- -- ; C� `� ; ��\ = �� » UNSURVEYED PROPERTY LINE — — — .�, _ ---J I Op I OF. MUD LICK CREEK CONSERVATION EASEMENT CE CE ' \ \ `�"- _ 592.5' 1 I » FENCE (WIRE) LINE X x X � /�1\ 1 FENCE (WOOD) LINE X_ X_ X ��� _ �� STREAM RESTORATION BANKFULL —. -. THALWEG — - - - — / \ OWNER: 592.2 , GRAYSON C. THOMAS, HEIRS EDGE OF GRAVEL � EG ; C �� ' STAT SVILLE,319 NCDRIVE625 ` EDGE OF PAVEMENT EP , c ' 1 GRADING LIMITS - - - - - - - - - - - - - -- \ �� TAX PIN: 8775-12-3214.000 DEED BOOK JS, PAGE 143 TIELINE OVERHEAD UTILITY °"° °"" °"° • GRAYSON C. THOMAS, HEIRS o _1 _ MAJOR CONTOUR LINE DB 411, PG. 846 C 597.3 J DEEDPIN: 8775BOOK 4110PAG E846° MINOR CONTOUR LINE TAX PIN: 8775-01 -6345.000 \\ ST EL N/A ACRES +/_ (TOTAL) WATER LINE ' WETLAND ZONE LINE CONSTRUCTED RIFFLE �����------- ; -------------- OLOG VANE _ ME ggmalE�rj BRUSH TOE GA E C c X 0 C SCALE 1 " = 20' SURVEYED: PJ TR Allied Associates, P.A. 4720 KESTER MILL ROAD PHONE (336) 765-2377 WINSTON-SALEM, N.C. 27103 www.alliedapa.com NO LICENSE #C-2198 80 TOWNSHIP COUNTY STATE DATE ALBRIGHT CHATHAM NORTH CAROLINA 08/01/17 MAPPED: JOB NO. MAP NO. TDS DA PA170611 MLC.dwg MLC © AU led Assoc, P A. 2017 VICINITY MAP NOT TO SCALE I F(,FNn EXISTING IRON PIN O EIP EXISTING REBAR O EIR NO POINT SET • NPS IRON REBAR SET • IRS N� 8 ARB El Ge F � o 1596.9' STEEL GATE ,4f, 1001 '` o 0 I /X 1 Q -F V r m ♦ CABLE PEDESTAL © ����'� 95_8- -� TELEPHONE MANHOLE Q TELEPHONE PEDESTAL D ��� / ^ � � / \� � • ♦♦ � FLOOD LIGHT \�\ \ ♦♦ c GUY WIRE m ��� LIGHT POLEC ���' 592.4' N ♦♦♦ (n ELECTRIC MANHOLE QE �� / / / / / / / X 1 ♦ O ELECTRIC METER ❑E ELECTRIC TRANSFORMER UTILITY POLE )a , I � / / / // / / � I Q � BOLLARD 0 Q (,7 r GAS METER ©/// ' GAS VALVE ®GV-, ni SEWER CLEAN OUT O / ; / / / , 01 % / // 1 Q o 0 SEWER MANHOLE/ Ji/ / SIGN v / / / / / / / / C: 0 i CATCH BASIN ❑ CB , / / / / // / / / i j / CURB INLET = CI / / / / / / DROP \ YARD INLET ❑o DI / YI / / / I / 'o" 0 G o FLARED END SECTION J ' •. ' L STORM MANHOLE QD / J / �j c / , HANDICAP / / / / • ' FIRE HYDRANT -6-GRAYSON C. THOMAS, HEIRS / //'`/ �-' n WATER MANHOLE �W p / // / o ` WATER METER ❑W DB JS, PG. 143 �/ �/ //�/� ,,'' WATER VALVE ® WV WELL w TAX PIN: 8775-11-3214.000 MANHOLE Q MH / / / ���� ♦ 0 PRESSURE INDICATOR VALVE PIV i ® / n TREE a RIGHT-OF-WAY R/W PROPERTY LINE P/L / � PARCEL IDENTIFICATION NO. P. 1. `� � CONCRETE MONUMENT HORD CH Q � � ,�� I � I � ;� o Cf) SIGHT EASEMENT SE C/) 0) I \ 1 \, DEEBOOK DD PLATT BOOK PB I \ CURB AND GUTTER C&G \ ,� REINFORCED CONC PIPE RCP �% CMP, CORRUGATED METAL PIPE \ o CORRUGATED PLASTIC PIPE CPP ,, Q BOUNDARY LINE `�� ;I I \ \\ \ \% RIGHT-OF-WAY LINE -- -- (^ UNSURVEYED PROPERTY LINE CONSERVATION EASEMENT CE CE — O � I\ \\ FENCE (WIRE) LINE XXXXXX (�/ � \ \ I \ \ � �\® � � \ \ ♦ FENCE (WOOD) LINE O�/. I � � I I I 1 \ \ \ \ \ ♦♦ BANKFULL —• -• � ; I I \ \ �\ ♦♦ THALWEG-..-..-..-..- Q I I 1 \\ \ ♦ o EG EDGE OF GRAVEL 2, \ EDGE OF PAVEMENT EP I I I \ GRADING LIMITS OVERHEAD UTILITY TIE LINE MAJOR CONTOUR LINE MINOR CONTOUR LINE WATER LINE WETLAND ZONE LINE UHU -11HU -11HU 0 MJ �� / 591.91, 1 / X //' / / I I. o ♦ / / / i CONSTRUCTED RIFFLE / ,�/ /' , // // // I f �/ • / / / 591.9 1-1 11, Li •J /' /'' /' LOG VANE ' ' I ♦ c // / / // Z 100, / // i 101 C BRUSH TOE / '/ ' ' II STEEL GATE /Q / o 590.!' n c P� G�41 / / / , / /'Q /00, / , / / e / AA41 \\�O � 40' olo '/��J 590.3' / I c x 4f / ' i/ I / 41 I c 41 loo, / mloo,J / / /' ' � C 591.4i�/ loo, Q5 i 41 e 41 loo, 414* / // _590, / / C) 590.5X �' � 1"o16 / X C / Q- n� o o� ,. _*1 /�, / 590.1 �� 1 �� ; , , . <v Cj / 4# 04' x 591.8' i� C) c \ I / i a �, o) / / O _____ �_________ I �� �� SHEET 6 SHEET 5 20 0 �CO 00 w(2) SHEE T 6 OF 7 AS BUILT SURVEY FOR: NOR TH STA TE ENVIRONMENTAL, INC OF: "MUD LICK CREEK STREAM RESTORATION )) OWNER: GRAYSON C. THOMAS, HEIRS 319 AUGUSTA DRIVE STATESVILLE, NC 28625 TAX PIN: 8775-12-3214.000 DEED BOOK JS, PAGE 143 TAX PIN: 8775-01 -6345.000 DEED BOOK 411, PAGE 846 NLA ACRES +/- (TOTAL) Allied Associates, P.A. 4720 KESTER MILL ROAD PHONE (336) 765-2377 WINSTON—SALEM, N.C. 27103 www.alliedapa.com NC LICENSE #C-2198 GRAPHIC SCALE 0 10 20 ao 80 SCALE TOWNSHIP COUNTY STATE DATE 1 " = 20' ALBRIGHT CHATHAM NORTH CAROLINA 08/01/17 SURVEYED: MAPPED: JOB NO. MAP NO. TDS ( IN FEET ) PJ TR DA PA170611 MLC.dwg MLC 1 inch = 20 ft. © Allied Assoc„ P.A. 2017 590 585 580 57E DATUM ELEV 570.00 C 6' L(' 101+00 101+50 102+00 102+50 103+00 103+50 104+00 104+50 105+00 105+50 106+00 106+50 107+00 107+50 108+00 108+50 109+00 109+50 110+00 590 585 580 DATUM ELEV Ci a a NORTH BRANCH �� �► _� ELEV: 585.86' ELEV: 585.44' 00 a) 00 Ln u� 0) 00 Ln 0 0) L0 N 0� 00 LC) 00 cy; 00 L0 O 0� 00 Ln CO G; 00 Ln r` 00 00 Ln O cy; 00 Ln r` oo 00 Ln r- r; 00 Lf) r 00 Ln C 00 L0 00 00 Ln O r 00 Ln r 00 LC) 00 L6 00 Ln 07 co 00 Ln 00 co 00 Ln C6 00 Ln O O m co u7 0 r` 00 0 O� 0) co a") m 00 n Qo 0) 00 a") CO co 00 n 07 00 Lf) r7 00 00 07 ca 00 00 LO m 0 00 Ln N 00 Ln (0 00 00 Ln 00 00 c0 Ln r` r` 00 Ln r` 00 00 Ln (0 r` 00 Ln 00 00 LO N r` 00 Ln 00 00 LO N r` 00 Ln M 00 Ln 0) r` 00 LO co r` co Ln Ln c0 00 Ln co r` 00 Ln N r` 00 Ln Ln u� 00 Ln N r` 00 Ln Ln c0 00 Ln r` L6 00 Ln c0 C6 00 u� 00 Ln m 4 00 Ln 00 L6 00 Ln r` L6 co Ln N 0i 0o Ln N 4 co Ln 00 U-) r` r6 00 Ln CO 4 00 r0 4 co Ln r6 00 LO r6 co Ki 00 101+00 101+50 102+00 102+50 103+00 103+50 104+00 104+50 105+00 105+50 106+00 106+50 107+00 107+50 108+00 108+50 109+00 109+50 110+00 590 585 580 DATUM ELEV Ci a a NORTH BRANCH 201+00 201+50 202+00 202+50 203+00 203+50 204+00 204+50 205+00 205+50 EAST BRANCH GRAPHIC SCALE 40 0 20 40 80 ( IN FEET ) 1 inch = 40 ft. 110+50 111+00 SHEE T 7 OF 7 AS BUILT SURVFY FOR: NOR TH S TA TE ENVIRONMENTAL, INC OF: "MUD LICK CREEK STREAM RESTORATION OWNER: GRAYSON C. THOMAS, HEIRS 319 AUGUSTA DRIVE STATESVILLE, NC 28625 TAX PIN: 8775-12-3214.000 DEED BOOK JS, PAGE 143 TAX PIN: 8775-01-6345.000 DEED BOOK 411, PAGE 846 VA ACRES +/— (TOTAL) Allied Associates, P.A. 4720 KESTER MILL ROAD PHONE (336) 765-2377 WINSTON—SALEM, N.C. 27103 FAX 760-8886 www.alliedapa.com NC LICENSE #C-2198 160 SCALE TOWNSHIP COUNTY STATE DATE 1 " = 40' ALBRIGHT CHATHAM NORTH CAROLINA 08/01/17 SURVEYED: MAPPED: JOB NO. MAP NO. TDS PJ TR DA PA170611 MLC.dwg MLC © Allied Assoc„ P. A. 2017 00 a) 00 Ln u� 0) 00 Ln 0 0) L0 N 0� 00 LC) 00 cy; 00 L0 O 0� 00 Ln CO G; 00 Ln r` 00 00 Ln O cy; 00 Ln r` oo 00 Ln r- r; 00 Lf) r 00 Ln C 00 L0 00 00 Ln O r 00 Ln r 00 LC) 00 L6 00 Ln 07 co 00 Ln 00 co 00 Ln C6 00 Ln 201+00 201+50 202+00 202+50 203+00 203+50 204+00 204+50 205+00 205+50 EAST BRANCH GRAPHIC SCALE 40 0 20 40 80 ( IN FEET ) 1 inch = 40 ft. 110+50 111+00 SHEE T 7 OF 7 AS BUILT SURVFY FOR: NOR TH S TA TE ENVIRONMENTAL, INC OF: "MUD LICK CREEK STREAM RESTORATION OWNER: GRAYSON C. THOMAS, HEIRS 319 AUGUSTA DRIVE STATESVILLE, NC 28625 TAX PIN: 8775-12-3214.000 DEED BOOK JS, PAGE 143 TAX PIN: 8775-01-6345.000 DEED BOOK 411, PAGE 846 VA ACRES +/— (TOTAL) Allied Associates, P.A. 4720 KESTER MILL ROAD PHONE (336) 765-2377 WINSTON—SALEM, N.C. 27103 FAX 760-8886 www.alliedapa.com NC LICENSE #C-2198 160 SCALE TOWNSHIP COUNTY STATE DATE 1 " = 40' ALBRIGHT CHATHAM NORTH CAROLINA 08/01/17 SURVEYED: MAPPED: JOB NO. MAP NO. TDS PJ TR DA PA170611 MLC.dwg MLC © Allied Assoc„ P. A. 2017 Mui Li'ckCTCck Mitigation Site Cape Fear River Basin 03030003 Chatham County, North Carolina for NCDEQ Divisions ®f 0 A8 360 720 100 1440 N PrajeflLocalion � 1 l � fig n cs Vicinity lylap No( to scale Mitigation Services Sheet Index FINAL. RECORD DRAWINGS Issued June 2018 Revised 06.12.2018 Stream Origins Stream Latitude Longitude North Branch N 35° 48'53,73" W 79° 25' 56.95" East Branch N 35" 48' 46,31" AV 79" 25'56.17" Mud Lick Creell N35' 48'50.97" -VV 790 26' OAK Title Sheet 0 1 Legelad 0.2 Stream Overlay Overview 0.3 Stream Overlay Plans 1.11.10 Planting Plan 2.1 Fencing Plan 3,1 P7°oject Direat+oxy Surveying: Owner; Turner Land Surveying, PLLC NCDEQ Division of P.O, Box 41023 Mitigation Services Raleigh, NC 27629 1652 Mail Service Center David S. Turner, PLS Raleigh, NC 27699-1652 919--8751373 Jcff Schaffe3- 919-707-8976 Engineering: DEQ Contract No. D14D01i Wildlands Engineering, Inc DMS XD No. 93482 License No. F-0831 312 tiVest Millbi-mk Road, Suite 225 SCO No. 1209857-01 Raleigh, NC 27609 Angela N. Allen, PE 919-851-9986 I a AL M280 = muura` �rZ-rfr is (Existing ]E eatures PL Pr — Pi -- Existing Property Boundary 17. Existing Wellands NOTE: FEATURES IN RED INDICATE DEVIATION FROM FINAL CONSTRUCTION PLANS Propos, ed Features 10+00 As -Built Fencing - - - Proposed Stream Alignment - - - - Proposed 8ankfull -------52p------- Proposed 5' Major Gonteur 10+00 Proposed 1' Minor Contour KNAM Proposed Constructed Riffle VNProposed Angled Log Step Pool Proposed Angled Log Drop As -Built Features ce Ce Conservation Easement x r: As -Built Fencing As -Built Slraam Thalweg 10+00 - —j— - As -Built Slrearn Centerline - Restoration 10+00 V _ I - - As -Built Stream Centerline - Enhancement II 10+00 As -Built Stream Centerline- Not For Credit ...._ ...._ ...._ ...._ As -Built Bankfull - ��— As-Buill 5' Major Contour As -Built 1' Minor Contour As -Built Constructed Riffle Proposed Log Vane - ` r As -Built Angled Log Step Pool Proposed Permanent Ford Crossing As -Built Angled Log Drop r� Proposed Brush Toe r � As-8ui0. Lag Vane As -Built Permanent Ford Crossing 4 - -- -- - I Proposed Permanent Culvert Crossing I As -Built Brush Too As -Built Permanent Culvert Crossing Z v,om �1 ozrn az ozWv Az �.vm au�rE H m S AL 0OM a T+ s V O E t i -I e o p�anzanny 14 s a S y+' EAL 040280 FNc 1 NEF'� �`,,`• •..y�e{a rs neo•. m AL 040280 O 595 SBfi $00 _ r _ AS-bUIT PROFILE PROP ED PROFILE 585 585 581 581 10C+00 100+50 101+00 101+54 102+00 102+50 103+00 103+50 104+00 104i50 104+60 NOTES: 1. FOR ENHANCEMENT REACHES, THE EXISTING CONDITIONS THALWEG WAS USED TO DEVELOP PROPOSED MITIGATION CREDITS AS OUTLINED IN THE MITIGATION PLAN BECAUSE THE ALIGNMENTS OF ENHANCEMENT REACHES WERE NOT ALTERED DURING CONSTRUCTION, AS -BUILT ALIGNMENTS ARE ALSO BASED ON THE EXISTING CONDITIONS SURVEY. 2 AS -BUILT BANKFULL LINES FOR ENHANCEMENT REACHES ARE BASED ON EXISTING CONDITIONS SURVEY. 7� +p0 %/ i .•10f+00• . r, I ',� \ 1D4+0p �f• -590 `� L[1 - V, � / \ NORTH BRANCH j, T \\ '\ ......... ._ ..1pyt00r ..._ • 5,95 ' �• 0' 20' 40' 60' inkuc.rny U QJ AL 040280 O 1 590 585 m PROPOSED PROFILE AS -BUILT PRIOR - 590 585 580 579 579 104,90105+00 105+50 100+00 108+59 107+00 107+50 100+00 108-x50 108+80 --_- _ _ 590 \'\ ------- ------- 1 rte,.'_. Lr•—�__-_ --� o0i NpRTH BRANCH � ,a� xoo - .. \ � -'---- .•` :^..�•��� ^moo �` \`1 I J — / / NOTE! FROM NORTH BRANCH STA. 107+55 TO STA. 107+86, PROPOSED STREAM ALIGNMENT REALIGNED IN ORDER TO AVOID EXISTING BEDROCK, 590 � � 1 � II! i 0' 2' 4' 6' u �vFJitr4.l 60' picA¢cntrey 1-4 CN 9 565 m 576 108480 109+00 109+50 PROPOSED PROFILE AS -BUILT PROFILE 110+00 i10+50 V_ 5@0 565 586 576 111+50 } co p LL]` z �} II U} r. NOTES: } 1. FROM NORTH BRANCH STA. 108+82 TO STA. 110+03, PROPOSED STREAM ALIGNMENT AND CULVERT REALIGNED I IN ORDER TO AVOID EXISTING BEDROCK. 2. FOR ENHANCEMENT REACHES, THE EXISTING CONDITIONS } THALWEG WAS USED TO DEVELOP PROPOSED MITIGATION ` CREDITS AS OUTLINED IN THE MITIGATION PLAN. BECAUSE �} THE ALIGNMENTS OF ENHANCEMENT REACHES WERE NOT ALTERED DURING CONSTRUCTION, AS -BUILT ALIGNMENTS ` ARE ALSO BASED ON THE EXISTING CONDITIONS SURVEY. } 3. AS -BUILT BANKFULL LINES FOR ENHANCEMENT Il REACHES ` ARE BASED ON EXISTING CONDITIONS SURVEY. OR rH BSN �i . y'. u AL - - 040280 " I NEf¢'ti2'•.• eCA N P,,, •,, 7 ch �I4-4 O d 0' 20' 40' 60' E N� 7 ch IM 390 585 581 7.00+00 201+00 l A8-BUI4-TPROFILE PROPOSED PROFILE 201♦50 202+00 202+50 203+00 595 590 585 581 203+50 203+80 X�C} Lk 201+00 } - ;T 201+oor \ /J 0111., \ lok / \�OxB NOTES: F�� ��� '�x �� _ ���❑•' 1. FOR ENHANCEMENT REACHES, THE EXISTING Y� CONDITIONS THALWEG WAS USED TO�� ,1` DEVELOP PROPOSED MITIGATION CREDITS AS \ ��a O� \\ , - —--______ OUTLINED IN THE MITIGATION PLAN BECAUSE THE ALIGNMENTS OF ENHANCEMENT REACHES WERE NOT ALTERED DURING CONSTRUCTION, AS -BUILT ALIGNMENTS ARE ALSO BASED ON x THE EXISTING CONDITIONS SURVEY. 2. AS -BUILT BANKFULL LINES FOR ENHANCEMENT + REACHES ARE BASED ON EXISTING \�\ CONDITIONS SURVEY. ,., 0' 20' 40' 60' n�rnvairui r` o+ � ti y`•, EAL 040280 �M-iN6�� 590 585 5B0 579 203+80 20q+00 it A UI LT PROFILE PROPOSED PROFILE 204+50 205+00 590 585 580 $79 205+50 245+77 cr I � 1 �O � •264+00 �_•�-� � ______ ___ � r 1r� i '-=-�'L r—rte''''-._Jy •!' �'� �i !, \ r' tos,.g2 700 �nrrwil 0' 20' 40' 80' (ita,rzoil,M1! I U) A " m Zz z o oz h 'az 2¢I"€ m • p 9�L = 0 0280 Y) �— N CcF-L7L.E� t �t P ,_ ld _ TJ — ld _ld_l } d 3/�-old ��d� �/ •�, '` j I 3 Qo ti ld 7d mot) Li oo.� . ' • ., � ii •'., , . Ck C z ' u \\; --------- 46- NOTES: - NOTES: 1. FOR ENHANCEMENT REACHES, THE EXISTING, CONDITIONS THALWEG WAS USED TO DEVELOP PROPOSED MITIGATION CREDITS AS OUTLINED IN THE MITIGATION PLAN. BECAUSE THE ALIGNMENTS OF ENHANCEMENT REACHES WERE NOT ALTERED DURING CONSTRUCTION, AS-BUILTALIGNMENTS ARE ALSO BASED ON THE EXISTING CONDITIONS SURVEY. 2. AS -BUILT BANKFULL LINES FOR ENHANCEMENT REACHES ARE BASEO ON EXISTING CONDITIONS SURVEY. 40' 60' r� R. w 1 ` I 1 1 1 1 1 I k1 . f, R i i 1 , 1 I I 1 y � 11 ,1 1 II 11 FA NOTES: I FOR ENHANCEMENT REACHES, THE EXISTING CONDITIONS THALWEG WAS USED TO DEVELOP PROPOSED MITIGATION CREDITS AS OUTLINED IN THE MITIGATION PLAN, BECAUSE THE ALIGNMENTS OF ENHANCEMENT REACHES WERE NOT ALTERED DURING CONSTRUCTION, AS -BUILT ALIGNMENTS ARE ALSO BASE❑ ON THE EXISTING CONDITIONS SURVEY. 2. AS -BUILT BANKFULL LINES FOR ENHANCEMENT REACHES ARE BASED ON EXISTING CONDITIONS SURVEY. y 3 , a' 2• a, 20' 40• so, wwzavre!� 3 S AL 040280 b!J � O ERo6 ��� <<\ � •. Vis- � „�" E` wr\\ MUD LICK CREEK + /� 1 / r , r �* NOTES: 1. FOR ENHANCEMENT REACHES, THE EXISTING CONDITIONS THALWEG WAS USED TO DEVELOP PROPOSED MITIGATION 1 CREDITS AS OUTLINED IN THE MITIGATION PLAN. BECAUSE THE ALIGNMENTS OF ENHANCEMENT REACHES WERE NOT ALTERED DURING CONSTRUCTION, AS -BUILT ALIGNMENTS ARE ALSO BASED ON THE EXISTING CONDITIONS SURVEY. 2 AS -BUILT BANKFULL LINES FOR ENHANCEMENT REACHES ARE BASED ON EXISTING CONDITIONS SURVEY. CIC 1 0 2 S L r - 04 'YCF�A N P �. c� ft b10 A x C SCC � t % G �% �, I x g^ / n' z' a' s' i� I I r e Cr�TIGiI 1 I 1 O 0 20' ao' 60' (� — ��� <<\ � •. Vis- � „�" E` wr\\ MUD LICK CREEK + /� 1 / r , r �* NOTES: 1. FOR ENHANCEMENT REACHES, THE EXISTING CONDITIONS THALWEG WAS USED TO DEVELOP PROPOSED MITIGATION 1 CREDITS AS OUTLINED IN THE MITIGATION PLAN. BECAUSE THE ALIGNMENTS OF ENHANCEMENT REACHES WERE NOT ALTERED DURING CONSTRUCTION, AS -BUILT ALIGNMENTS ARE ALSO BASED ON THE EXISTING CONDITIONS SURVEY. 2 AS -BUILT BANKFULL LINES FOR ENHANCEMENT REACHES ARE BASED ON EXISTING CONDITIONS SURVEY. CIC 1 0 2 S L r - 04 'YCF�A N P �. c� ft b10 A Q g^ n' z' a' s' e Cr�TIGiI O 0 20' ao' 60' (� — SII �-- -- y00 s _ - - l •� � _ ....� ..._ .._ .,_�,� _ ..... Ire •�+d3f� .�' � '� 316 � i' I1 1 I I I I 1 NOTES: 1. FOR ENHANCEMENT REACHES, THE EXISTING CONDITIONS THALWI=G WAS USED TO DEVELOP PROPOSED MITIGATION CREDITS AS OUTLINED IN THE MITIGATION PLAN. BECAUSE THE ALIGNMENTS OF ENHANCEMENT REACHES WERE NOT ALTERED DURING CONSTRUCTION, AS -BUILT ALIGNMENTS ARE ALSO BASED ON THE EXISTING CONDITIONS SURVEY, 2 AS -BUILT BANKFULL LINES FOR ENHANCEMENT REACHES ARE BASED ON EXISTING CONDITIONS SURVEY. o' 2' 4' 6' o' 20' 40' oo' luno a� s"�Z Zo Z� Qp .a Looma aZ �aFE � 3 M cd 0 NOTES: t FOR ENHANCEMENT REACHES, THE EXISTING CONDITIONS THALWEG WAS USED TO DEVELOP PROPOSED MITIGATION CREDITS AS OUTLINED IN THE MITIGATION PLAN. BECAUSE THE ALIGNMENTS OF ENHANCEMENT REACHES WERE NOT ALTERED DURING CONSTRUCTION, AS -BUILT ALIGNMENTS ARE ALSO BASED ON THE EXISTING CONDITIONS SURVEY, 2. AS -BUILT BANKFULL LINES FOR ENHANCEMENT REACHES ARE BASED ON EXISTING CONDITIONS SURVEY. CD x 0 -o vi IT, in X O q D SEAL'" oaazao VAq, SLA tJ P � ••`, 0 uj ll Ur" © p PPte\\ bq - p 8 0' 2' 4' W �� IVER•�3 �i OS 0' 20' 40 Cn' U � d — F ,�j i Mrrc�nRU \'Area for bare root planting= 9.6 acres 5lrcarubnnlc 1'l:w ling 2ouc l.ivu 3rrrkes+uu! N.rbuecqur }Yngr 51:C[ICS Cnlllnlnn l\11111L' na sparing 111 LM 111!11. 51eL Shaluln rF nr SlelmS rurmu Silks ❑uessuud It n 2-x n. pi'--t.i•'r,l .ehmh Spen'irl Cnnlnsun Nnmc AU, Spacing 1 SI h'rm0ha f,r'rarwhY111rrn Grceu Ash 121L (, phdmnrs'S- orridennAir vramarr 1211 G Ccrcisrmxrrhvnrr Redb.r f'apnh,s,lel Al. C4i[unnoad 12R 6 1h•011nnf9rn Rirrr RW, 12 p. 6 Cr HA urrirf •rNnrir Hac4bzrry• 12 n, 6 Nl ss'n.1}Jrnlirn Hluak Glm, 17 4 fr Uffi—mmtr ,61m Aulrrican film 121L r, 011,11 9giulmrn P.Ww Hophomh.nnl 121E Srnnhnrar SNp, l:Ide,krry 12R- 6 ltubrnrn prrxdnrrrtrrin Rhck Loctut fIR. G L'ar++us lommrrurl SHIN ❑ugt—d 11 It, 6- Flmnnrlu-F.r ,vrgorr Witch h—I 12 n. 6- Ccpknlm IT'l. orrideuln7rs RUuanUu511 1211. 6- L1f�1lpvv.r 1vrAi,riro,n Parinunne 121E 6- CuR+herr e-nrnlirrinrrn tlnmrllod l2 R- C- Ar—L7Jluru Sn.Inlp Tupelo 12R 6- S,—p Chuhm OIL 12 rL 6- Orvrrr+n "h rrr Nolte O,"Is 12 f1, f, l.lrinrlemlran rrrlYl'rrr Tl;%p Poplar 121L 6- \'Area for bare root planting= 9.6 acres 5lrcarubnnlc 1'l:w ling 2ouc l.ivu 3rrrkes+uu! N.rbuecqur }Yngr 51:C[ICS Cnlllnlnn l\11111L' na sparing Indre. spacing 111!11. 51eL Shaluln rF nr SlelmS rurmu Silks ❑uessuud It n 2-x n. pi'--t.i•'r,l .ehmh Sirearnbank Pkanitng Zone d 8p'- lea, 240, SEAL � 040280 N 0' aois0zdn' iyoaea-,iai PROPERTY BOUNDARY FOR REPRESENTATIVE PURPOSES ONLY. NOT FINAL SURVEY. \ �d a )a, q\) o- �d 111 ro- nF I m� Q 4-4 6 0 r4 u �1 E�