HomeMy WebLinkAbout20190370 Ver 1_RE_ U-4906_Revised Permit drawings and impacts_20190430Carpenter, Kristi
From: Westphal, Anneliese
Sent: Tuesday, April 30, 2019 3:02 PM
To: Steenhuis, Joanne
Subject: RE: U-4906_Revised Permit drawings and impacts
Attachments: U-4906 HYD_Permit_drawing_4-12-2019.pdf
Joanne,
Thanks for your patience while I checked the numbers. Attached are the correct
drawings and impacts summary for the U-4906 project. These drawings reflect the
corrections that were made after we addressed Brad's comments (see my email below).
Please note that for Sties 3 and 4 (stream sites) any impacts shown as an area in the SW
impacts columns are just area representations of the linear impacts — they are not
additional impacts. If you have any questions, perhaps we can discus in person
tomorrow. I will have a print-out of the drawings if we need to refer to them.
Thank you,
Anneliese
Anneliese Westphal
Environmental Senior Specialist
Division 3
NCDOT- Division of Highways
910 341 2000 office
910 604 1330 mobile
910 675 0143 fax
awestphalAncdot.aov
5501 Barbados Blvd
Castle Hayne, NC 28429-5647
From: Steenhuis, Joanne
Sent: Wednesday, April 24, 2019 4:06 PM
To: Westphal, Anneliese <awestphal@ncdot.gov>
Subject: RE: U-4906—Revised Permit drawings and impacts
sure
From: Westphal, Anneliese
Sent: Wednesday, April 24, 2019 3:52 PM
To: Steenhuis, Joanne <loanne.steenhuis@ncdenr.gov>
Subject: RE: U-4906—Revised Permit drawings and impacts
Joanne,
Can you please wait until you hear from me before issuing this permit? I am checking
the numbers again.
Thank you,
Anneliese
From: Steenhuis, Joanne
Sent: Wednesday, April 24, 2019 12:41 PM
To: Westphal, Anneliese <aestphal@ncdot.gov>
Subject: RE: U-4906_Revised Permit drawings and impacts
Anneliese,
This is the one I need to rewrite the 401 for, correct?
From: Westphal, Anneliese
Sent: Wednesday, April 24, 2019 9:53 AM
To: Shaver, Brad E SAW <Brad.E.Shaver@usace.army.mil>
Cc: Steenhuis, Joanne <joanne.steenhuis@ncdenr.gov>; Herndon, T. Mason
<tmherndon@ncdot.gov>
Subject: U-4906_Revised Permit drawings and impacts
Brad,
Please find attached revised permit drawings (including a revised impact summary
table) for the subject project. This replaces the permit drawing package that was
included in the ePCN which was submitted on March 25, 2019.
The permit drawing sites we discussed and some changes are summarized below:
Permit drawing 8 (Site 2): This permit drawing was changed to show a 3:1 front
slope. This resulted in a change on the impact summary table to 0.005 acres of fill (not
0.006 acres)
Permit drawing 11(Site 3): As discussed, the impacts at the inlet of the proposed pipe
are for tying the existing channel to the proposed culvert. There was no change to the
original impacts at this site.
Permit drawing 14 (Site 4): The previously noted 2 feet of permanent stream impacts
was not needed since those impacts were within the existing pipe impacts.
Also, due to a drainage request, the effects assessment by the State Historic
Preservation Office is not yet complete for this project. There will be a change in the
drainage easements and drainage structures at the church property which is shown on
permit drawing sheets 6 and 7 as a historic property. No jurisdictional features are
present in the vicinity of the church, and therefore the area is not designated as a
permit "site." The assessment of effects meeting with for these changes is scheduled
for May 7, 2019.
Please let me know if you have any questions or concerns.
Thank you,
Anneliese
Anneliese Westphal
Environmental Senior Specialist
Division 3
NCDOT- Division of Highways
910 341 2000 office
910 604 1330 mobile
910 675 0143 fax
awestphal(cDncdot.gov
5501 Barbados Blvd
Castle Hayne, NC 28429-5647
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third
parties.