Loading...
HomeMy WebLinkAboutNCG551760_Renewal (Application)_20190429ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Airertor Beverly Lail Beverly Lail PO Box 91 Connellys Springs, NC 28612 Subject: Permit Renewal Application No. NCG551760 3886 Miller Bridge Road Burke County Dear Applicant: NORTH CAROLINA Environmental Quality April 29, 2019 The Water Quality Permitting Section acknowledges receipt of your application for a new NPDES WW permit, including supporting documentation and your check number 2128 in the amount of $60.00 as payment of the application fee. These items were received in our offices on April 29, 2019. Your application will be assigned to a permit writer within the Section's NPDES WW permitting branch. The permit writer will contact you if additional information is required to complete evaluation of your application. Your timely and direct response to any such request will help to expedite the review process. Please note that acceptance of the application does not guarantee a NPDES permit will be issued for the proposed activity. A permit will only be issued following a complete review of the application, concluding the proposed discharge is allowable per applicable statutes and rules. Information regarding the status of your renewal application can be found online using the Department of Environmental Quality's Environmental Application Tracker at: https•//deq nc gov/permits-regulations/permit-guidance/environmental-application-tracker If you have any additional questions about the permit, please contact the primary reviewer of the application using the links available within the Application Tracker. Sincerely, Wren Thedford Administrative Assistant Water Quality Permitting Section ec: WQPS Laserfiche File w/application North Caroiina Department of Environmentai Quality I Divisan of Water Resources D- Asheville Reganal Office12D90 U.S. 70 N ghway I Swannanos, North Carolina 28778 `� 828--A-4500 BROOKS ENGINEERING ASSOCIATES April 4, 2019 Planning & Project Management / Civil Engineering Surveying Environmental Engineering & Services 17 Arlington Street / Asheville NC 28801 www.brooksea.com / 828-232-4700 NC DENR/DWR/Water Quality Permitting Section 1617 Mail Service Center Raleigh, NC 27699-1617 Attention: Charles Weaver Regarding: Cover Letter & Alternatives Analysis Lail Residence SFR NPDES Application 3886 Miller Bridge Road Burke County BEA Project Ne. 486919 Dear Mr. Weaver: On behalf of Ms. Beverly Lail, BEA is submitting the attached Notice of Intent for coverage under NCG550000. This Cover Letter is intended to provide a narrative description of the project and serve as the request for the Authorization to Construct. Project Description The property is 0.65 acre tract a located at the intersection of Miller Bridge Road and Owens Mountain Avenue in Burke County. The three bedroom single family residence located on the property was built in 1979. The existing septic system was identified as failing by the County Health Department. An investigation by the Burke County Health Department and the NCDHHS Regional Soil Scientist was performed in May of 2018. No options were identified as part of the investigation and the system was identified as Non -repairable and the site deemed Unsuitable for installation of a subsurface system. Additionally a private licensed soil scientist was hired to evaluate the subject site and the adjacent parcel (partially owned by Ms. Lail) for feasibility and both sites were determined to be unsuitable. Proposed is an EZ Treat recirculating fixed media system unit with UV disinfection to treat the wastewater from his park model for discharge in to the unnamed tributary of Tims Creek. The site was visited by myself and Tim Heim from the regional NCDEQ of ice to investigate the site feasibility. No conditions prohibiting the proposed discharge Alternatives Feasibility a) This area of Burke County is not served by any public or private sewer systems. Refer to Attachment D for a map of the nearest permitted sewer collection systems per NC OneMaps. The nearest collection system is over 2 miles away. It would be impossible from a permitting standpoint and economically infeasible to connect to any of the existing permitted sewer treatment plant systems. b) The letter from the Burke NCDHHS Regional Soil Scientist is provided as Attachment A. c) Provided as Attachment B is a letter from a NC Licensed Soil Scientist that the site, and adjacent property is unsuitable for any type of onsite system (including subsurface drip or irrigation) due to space limitations. d) The adjacent parcel also partially owned by Ms. Lail was also found to be unsuitable (see soil scientist's letter). Receiving Waters The receiving water is a Class C stream. There are no know restrictions for Tims Creek or this tributary. The 7Q10 report from the USGS is provided as Attachment C. Approximate Lat/Long of the discharge location would be N 35' 42' 31.57" W 81' 28' 29.64" Enclosed with this Cover Letter and request for the Authorization to Construct are three sets of sealed plans and specifications and a fee check for $60. We appreciate your review of this application. We look forward to working with you on this project. Sincerely, Brooks Engineering Associates, P.A. Mark C. Brooks, P.E. Enclosed: Fee Check for $60 3 sets of Engineering Plans Attachments: A — Documentation from NCDHHS Regional Soil Scientist B — Letter for Licensed Soil Scientist C — 7Q 10 documentation D — Map of closest permitted sewer systems per NC OneMaps ATTACHMENT A County Denial Letter DEPARTMENT OF HEALTH AND HUMAN SERVICES DIVISION OF PUBLIC HEALTH ROY COOPER GOVERNOR MANDY COHEN, MD, MPH SECRETARY DANIEL STALEY DIRECTOR May 16, 2018 Nathaniel Hall Burke County Environmental Health 110 N. Green St. P O Box 219 Morganton, NC 28655 RE: Subject: Soil/Site evaluation for a repair of subsurface treatment and disposal system. Owner: Beverly Lail Location: 3886 Miller Bridge Rd, Connelly Springs, NC 28612 Parcel Number: 2762524006 Size: 0.667 acres Mr. Hall: On 5/09/18 I investigated the on -site wastewater system and performed a soil and site evaluation of the aforementioned property. Present at the visit was yourself, Jackson Stump (EH intern) and the property owner. This evaluation was done to determine the site's suitability for a repair of the subsurface treatment and disposal system for the existing three -bedroom residence. The water supply to the residence is provided by an on -site bored well but public water is available. While no malfunction was observed during this visit the system has been failing from the lower side of distal end of the drainfield. The drainfield was located by probe where the depth was less than four feet. The property was evaluated in accordance with the North Carolina Laws and Rules for Sewage Treatment and Disposal Systems, 15A NCAC 18A .1900. Listed below are the results of the evaluation and recommendations for the site. Please share this report with the applicant/property owner. The most limiting site factors encountered are listed below: • Soil Characteristics (Morphology) (Rule .1941a (3))- expansive clay minerology (unsuitable) was encountered at depths ranging from 10 to 32 inches below the natural soil surface. • Soil Wetness Condition (SWC) (Rule .1942)- is less than 12-inches below the natural soil surface based on soil colors of chroma 2 or less (Munsell Color Chart). W W W.NCDHHS.GOV TEL 919-707-5874 • FAx 919-845-3972 LOCATION: 5605 SIX FORKS RD • RALEIGH, NC 27609 MAILING ADDRESS: 1642 MAIL SERVICE CENTER • RALEIGH, NC 27699-1642 AN EQUAL OPPORTUNITY / AFFIRMATIVE ACTION EMPLOYER Available Space (Rule .1945)- insufficient space on the property with soils that can be classified as suitable or provisionally suitable (i.e. usable/modifiable soils) for the repair of the ground absorption sewage treatment and disposal system. Available space on this site is limited by: o a ten (10) foot horizontal separation distance to any property line. o a fifty (50) foot horizontal separation distance to the existing water supply well. o a five (5) foot horizontal separation distance to any footer. o a fifteen (15) foot horizontal separation distance to any basement or storm water diversion. o a ten (10) foot horizontal separation distance to any water line. o a driveway and other structures. Site Classification The site is NONREPAIRABLE and any modification would not reasonably enable a system to function properly, Rule 1961(1). This is due to the site being UNSUITABLE for installation of a subsurface treatment and disposal system of due to clay minerology (Rule 15A NCAC 18A .1941), depth to soil wetness (Rule 15A NCAC 18A .1942), lack of available space (Rule 15A NCAC 18A .1945) and unable to maintain setbacks (Rule 15A NCAC 18A. 1950). Currently, the site is classified as unsuitable per Rule .1948 based on the above referenced soil/site limitations. This site is unsuitable under Rule .1955, Conventional Sewage Systems. This site is unsuitable under Rule .1956, Modifications to Septic Tank Systems. This site is unsuitable under Rule .1957, Alternative Sewage Systems. This site is unsuitable under Rule .1969, Experimental, Innovative, Accepted Systems, Components, or Devices. Recommendations The owner and applicant have the following options that might allow the use of this property as desired: The applicant may install an interceptor drain around the system. This would need to run from the upper side of the basement on the upper side of the patio to the Property line. At this point it would need to be solid pipe with on media to run past the distal end of the drainfield and to then discharge into the stream. The depth of the drain will be set by the discharge elevation into the stream but should be installed as deep as possible. The media in the drain should be brought to the ground surface. The problem will be maintaining the proper setback from the drainfield to the pipe while not crossing the property line. This property line needs to be located and/or an encroachment into the DOT r/w would have to be obtained to maintain the setback. 2. The applicant may purchase other suitable or provisionally suitable property or may obtain an easement on a suitable or provisionally suitable property to place the ground absorption sewage treatment and disposal system on. a. The applicant also owns the adjoining property on the same side of the creek. Combining it with this property or granting the applicable easements may allow for an area large enough for a aerobic drip irrigation to be permitted. It would require the existing well to be abandoned as well as the DOT culvert and discharge to be rerouted into the stream head located in the r/w for Millers Bridge Rd. If the applicant would like to purse this option further soil evaluation as well as available space would have to be completed and confirmed. 3. The applicant/owner may apply for and receive a permit for permanent Pump and Haul from our Department under Rule .1961, to an approved NCDEQ facility. 4. The Division of Water Resources, NC Dept. Environment Quality (NCDEQ) in Raleigh, North Carolina may be contacted at (919) 791-4200 or your Winston-Salem Regional office at 336-776-9800 to pursue options available through that department. 5. Aground absorption sewage treatment and disposal system can be pursued under Rule .I948(d). Written documentation, including engineering, hydro -geologic, geologic or soil studies, shall indicate that the proposed system can be expected to function satisfactorily. The substantiating data shall indicate that: 1. A ground absorption system can be installed so that the effluent will be non-pathogenic, non- infectious, non -toxic, and non -hazardous; 2. The effluent will not contaminate groundwater or surface water; and 3. The effluent will not be exposed on the ground surface or be discharged to surface waters where it could come in contact with people, animals, or vectors. If you have any questions or if I can be of assistance, contact me at 828-764-5076, E-mail at alan.mckinney@dhhs.nc.gov, or PO Box 1972, Boone, NC 28607. Sincerely, 1,2 Alan McKinney Regional Soil Scientist Site Overview Approximate LHD pit locations armhown by: Approximate RSS auger borings are shown by: AB# (not to scale) ! 0 Yfj (*Viy 11f.JlC .; d "o . g � v � f r o ATTACHMENT B Letter from NC Licensed Soil Scientist 708 Broadway Street NW Lenoir, NC 28645 February 28, 2019 Ms. Beverly Lail P.O. Box 91 Icard, NC 28666 Re: 3886 Miller Bridge Rd; Connelly Springs, NC Tax PIN 2762524006 and adjoining tract Tax PIN 2762512879 Dear Ms. Lail: On October 11, 2018 and February 27, 2019, 1 conducted soil investigations of the above referenced properties. This investigation was conducted in accordance with the North Carolina Septic System rules (15A NCAC 18A .1900) and statute GS 130A-335 in an effort to locate an area for a repair septic system drainfield for the existing house. Based on this investigation, only very limited areas on the tract with the house site (Tax PIN 2762524006) were found to be suitable for any kind of septic system drainfield. These were not of adequate size to allow a septic system to function correctly over the long term. Limitations observed were fill and shallow depth to soil wetness condition. No part of the adjoining tract (Tax PIN 2762512879) was suitable due to soil wetness condition at depths of 5 to 13" below natural ground surface. Consideration was given to site alterations that might allow a septic system to function. No drainage system or other alteration is likely to make this site functional for a drainfield. Similarly, conditions on the site are such that a .1948 (d) proposal that would function satisfactorily is not possible. Additional consideration was given to potential for land application of the wastewater from this house under Section .0600 of the NCAC 02T rules, Single Family Residence Wastewater Irrigation Systems. Based on the distance from the house to the creek ranging from 102' to 74', and from the house to front and side property lines ranging from 54' to 27' there is no area (0 square feet) on the property that meets the setbacks listed in 15A NCAC 02T .0606. Based on the above, no type of soil based wastewater disposal system is possible on this site. If you have any questions regarding this report you are welcome to call me at 828-234-3776. Sincerely, Constance M. Adams, LSS ATTACHMENT C 7Q10 Report Mark Brooks From: Weaver, John <jcweaver@usgs.gov> Sent: Monday, February 25, 2019 2:02 PM To: Mark Brooks Cc: John C Weaver Subject: Response from USGS concerning... Re: [EXTERNAL] 7Q10 flow needed Mr. Brooks, In response to your inquiry about the low -flow characteristics (7Q10, 30Q2, average annual discharge) for a location on an unnamed tributary to Tims Creek in the vicinity of Hildebran in eastern Burke County, the following information is provided: No USGS discharge records are known to exist for the point of interest, as identified by the lat/long coordinates (35 42 31.57 N // 8128 29.64) provided in your email dated February 11, 2019. In the absence of site -specific discharge records sufficient for a low -flow analysis, estimates of low -flow characteristics at ungaged locations are determined by assessing a range in the low -flow yields (expressed as flow per square mile drainage area, of cfsm) at nearby sites where such estimates have previously been determined. A basin delineation completed using the online USGS StreamStats application for North Carolina (http://water.usg_s.goy/osw/streamstats/north carolina.html) indicates the drainage area for the point of interest (35.70887,-81.47502 NAD83) is 0.14 sgmi. For streams in Burke County, low -flow characteristics published by the USGS are provided in the following reports: (1) The first is a statewide report completed in the early 1990's. It is USGS Water -Supply Paper 2403, "Low -flow characteristics of streams in North Carolina" (Giese and Mason, 1993). An online version of the report is available at hgp://yubs.usgs og v/wsp/2403/report-Rdf. The report provides the low -flow characteristics (based on data through 1988) via regional relations and at -site values for sites with drainage basins between 1 and 400 sgmi and not considered or known to be affected by regulation and/or diversions. (2) The second is a statewide report published in March 2015. It is USGS Scientific Investigations Report 2015-5001, "Low -flow characteristics and flow -duration statistics for selected USGS continuous -record streamgaging stations in North Carolina through 2012" (Weaver, 2015). The report is available online at httR//t)ubs.usgs.gov/sir/2015/5001/. The report provides updated low -flow characteristics and flow -duration statistics for 266 active (as of 2012 water year) and discontinued streamgages across the state where a minimum of 10 climatic years discharge records were available for flow analyses. Inspection of the above reports indicates the presence of four (4) selected nearby USGS partial -record sites (2) and continuous -record streamgages (2) in vicinity of the point of interest where low -flow characteristics were published. Among these 4 sites, the low -flow discharge yields for the indicated flow statistics are as follows: Annual 7Q10 low -flow yields =_> from 0.2 to 0.47 cfsm (average 0.29 cfsm, median 0.24 cfsm) Annual 30Q2 low -flow yields =_> from 0.5 to 0.85 cfsm (average 0.63 cfsm, median 0.58 cfsm) Average annual discharge yields ==> from 1.4 to about 1.8 cfsm (both average and median about 1.55 cfsm) Application of the above range in yields to the drainage area (0.14 sgmi) for the point of interest results in the following estimated low -flow discharges: Annual 7Q10 discharges => from 0.03 to 0.07 cfs (average about 0.04 cfs, median about 0.03 cfs) Annual 30Q2 discharges => from 0.07 to 0.12 cfs (average about 0.09 cfs, median about 0.08 cfs) Average annual discharge ==> from 0.2 to about 0.25 cfs (both average and median about 0.2 cfs rounded) Please note the estimated flows are provided in units of cubic feet per second (cfs). Please understand the information provided in this message is based on a preliminary assessment and considered provisional, subject to revision pending further analyses. Hope this information is helpful. Thank you. Curtis Weaver J. Curtis Weaver, Hydrologist, PE Email: icweaver(cbusgs.gov USGS South Atlantic Water Science Center Online: httos://www.usgs-cov/centers/sa-water North Carolina - South Carolina - Georgia 3916 Sunset Ridge Road Raleigh, NC 27607 Phone: (919) 571-4043 // Fax: (919) 571-4041 On Mon, Feb 11, 2019 at 12:09 PM Mark Brooks <mbrooksgbrooksea.com> wrote: Mr. Weaver - I need the 7Q 10 flow for an NPDES permit application for an unnamed tributary of Tims Creek in Burk County located at N 35' 42' 31.57" W 81 ° 28' 29.64". Please confirm receipt of this email and let me know if this is something you can help me out with. Thanks! Mark C. Brooks, P.E. Brooks Engineering Associates, P.A. 17 Arlington Street Asheville, NC 28801 (828)232-4700 MKS ENGINEERING ASSOCIATES 0 -'- Virus -free. www.avq.com 2 ATTACHMENT D Regional Sewer Map H , , J a E, ; .� 1? 44 I,- ra r 'i , " 41 A;M t Ave Pit hnso n Brog e Rd. "ey Mountain Subject Site S, For-( ye FIGURE 1 SITE LOCATION AND NEAREST SEWER Shown are the locations of the nearest public sewer service areas and collections mains per NC OneMaps. Q z t— Q Q } ❑ U ul W w2 W z fl ❑ W W In Z Q Z N to m J z M W p z z U 1 1 O CL 14 rk w1 Et Lij 41 Z 2 W ko _J Q r -� CD w m C] Z W . M Q aa� U m to m ti z W W F Q -3 U ❑ 0 Na N (q Q W ma m Z U tY ❑ W U7 W (p Z Q z z W E Y LU 0 z a It z mW a Y 0 0 m m 0 N N U Q z !r 0 TABLE OF CONTENTS 1.0 System Summary & Project Information..............................................................................1 1.1 Project Summary ............................................................................................. 1 1.2 Design Flow and Influent Characteristics......................................................... 1 1.3 Contacts.......................................................................................................... 1 1.4 Scope & Qualifiers........................................................................................... 1 2.0 Collection System & General Conveyance Piping.............................................................3 2.1 Location of Sanitary Sewage Systems............................................................. 3 2.2 Sewer Line General Specifications.................................................................. 3 3.0 WastewaterTreatment...................................................................................... 9 3.1 Primary Treatment System................................................................................ 9 3.2 Aerobic Pretreatment System............................................................................ 9 3.3 Post Aeration Apparatus...................................................................................12 4.0 Site Preparation.........................................................................................................................14 4.1 Clearing & Grubbing.........................................................................................14 4.2 Seeding & Mulching..........................................................................................14 5.0 Inspection And Monitoring Proceedings............................................................................17 6.1 Pre -Construction Meeting.................................................................................17 6.2 Intermediate Inspection of the System..............................................................17 6.3 Final Inspection & Start-Up...............................................................................17 6.4 Regular Monitoring...........................................................................................18 6.5 Residuals Management....................................................................................18 6.0 Calculations 6.1 Buoyancy Calculations 6.2 Recycle Ratio Calculations 6.3 TDH Calculations for Pod Dosing (and Pump Curves) 7.0 Manufacturer Cut -Sheets 7.1 Tanks 7.2 EZ Treat System 1.0 SYSTEM SUMMARY & PROJECT INFORMATION 1.1 Project Summary This Engineer's Report and accompanying Engineering Drawings are for a new onsite wastewater system to serve a three bedroom single family residence located at 3866 Miller Bridge Road in Burke County (PIN 2762524006). The system is designed for compliance with the state General NPDES Permit for Single Family Residences NCG550000. The house currently has a septic system permitted through Burke County but the system is failing and there are no land based wastewater disposal options. The proposed wastewater treatment system consists of a septic tank, EZ Treat aerobic treatment system with UV disinfection and post -aeration apparatus. Section 7.0 includes system components' product specification (cut) sheets. The system's performance is document by NSF Certification for NSF/ANSI Standards 40, 245, and 350. Any use of "equivalent products" shall first be approved by the Project Engineer prior to installation. 1.2 Design Flow and Influent Characteristics The system is designed for domestic strength raw wastewater from the Inn facility. The design flow is based upon 120 gpd per room in accordance with 15A NCAC 02T .0114 wastewater design flow rates. 1.3 Contacts Engineer — Mark Brooks, PE, Brooks Engineering Associates 828-232-4700 Owner Contact — Bevrely Lail 828-244-1624 Tank Manufacturers — Dellinger Tank Company 800-948-1666 EZ Treat — Mike Stidham, 703-408-2916 1.4 Scope & Qualifiers This specifications manual is intended only for the use of permitting and construction of the intended wastewater treatment system. Any changes to these plans and specifications shall 1 be approved by the Project Engineer. Any changes in layout of equipment not approved shall release the Engineer from any potential liability associated with the system. The maintenance and operation of the system are to be in accordance with the Operation & Maintenance Plan provided as a separate document. If the system is not operated and maintained in accordance to manufacturer recommendations and documented as such any warranty may be voided. Notify Engineer in sufficient time to permit inspection of underground work before backfilling is begun. A final inspection shall be required with the Owner, Engineer, NCDEQ representative, and Contractor. Only the set of engineering plans with revision labeled "RELEASED FOR CONSTRUCTION" shall be utilized for construction. All construction lines shall conform to the latest County and State of North Carolina specifications as defined by Standards and Specifications and the North Carolina Building Code. Where two (2) standards conflict, the more stringent shall apply. In the event that the Contractor or another supplier proposes an alternate component to the specified manufacturer or component type, certain procedures must be followed. If proposing an alternate, the Contractor (supplier) must submit, no less than 15 business days in advance of the bid date (if during the bid review period) or 15 days prior to the need for installation. If needed, the contractor must provided a system hydraulic analysis based on the proposed component (including pipe sizes, flows, velocities, retention times, etc.), a list of exceptions to the governing specifications herein and/or demonstration of compliance to of these specifications. This information must be submitted to the Engineer for pre -approval of the alternate equipment being proposed and determination of compliance with these Contract Documents. If the equipment differs materially or differs from the dimensions given on the Drawings, the Contractor (supplier) shall submit complete drawings showing elevations, dimensions, or any necessary changes to the Contract Documents for the proposed equipment and its installation. Pre -approval, if granted, will be provided in writing by the Engineer to the Contractor (supplier) at least five business days in advance of the bid or installation date. If the Engineer's approval is obtained for Alternate Equipment, the Contractor (supplier) must make any needed changes in the structures, system design, piping or electrical systems necessary to accommodate the proposed equipment at the expense of the Contractor (supplier). 2 2.0 COLLECTION SYSTEM AND GENERAL CONVEYANCE LINES 2.1 Location Of Collection System There is no collection system, only a 4" gravity service line from the single home. The location is a direct piping to the initial septic tank. 2.2 Sewer Line General Specifications The service lines shall be constructed of non -pressure pipe and fittings which shall be Schedule 40 PVC. All non pressurized piping shall maintain a minimum slope of 1/8-inch fall per lineal foot. Bedding and compaction shall be to a 95% Standard Proctor Test (ASTM Standard D 698) and trenching and installation shall be consistent with ASTM D2321. These specifications do not cover interior or initial building connections. Force Mains and all pressurized lines shall be constructed of Schedule 40 PVC of a size as noted on the engineering plans. The following are general location and separation guidelines: ♦ Typically a 3-foot minimum cover shall be maintained on all sewer lines. Gravity lines that drain completely can be shallower if needed due to rock conditions. ♦ Sewer lines may cross a water line if 18 inches clear separation is maintained, with the sewer line passing under the water line. The sewer line shall be constructed of ductile iron pipe and the water line shall be constructed of ferrous material equivalent to water main standards for at least 10 feet on either side of each crossing. ♦ Sewer lines may cross a storm drain if at least 24 inches of clear separation is maintained or the sewer pipe is of ductile iron or encased in ductile iron pipe for at least 5 feet on either side of the crossing. ♦ Sewer lines may cross a stream if at least three feet of stable cover can be maintained with a horizontal boring or the sewer line is of ductile iron pipe or encased in ductile iron pipe for at least 10 feet on either side of the crossing and protect against the normal range of high and low water. 3 Sizin Individual gravity sewer main lines shall not be less than 4 inches in diameter. Building sewers shall be in accordance with the state plumbing code and approved by the local building inspector Pressurized sewer lines shall be sized according to lines sizes depicted in the engineering construction drawings. All pressure sewer lines shall be sized to have velocities no less than 2 feet per and no more than 6 feet per second from the supplying pump at typical head conditions to maintain scour velocity and minimize hammer. Three (3) feet minimum cover shall be provided for all sewers unless ferrous material pipe is specified. Ferrous material pipe, or other pipe with proper bedding to develop design supporting strength, shall be provided where sewers are subject to traffic bearing loads. Additional protection shall be provided for sewers that cannot be placed at a depth sufficient to prevent damage. Steep Slope Installation All grades for gravity and pressure sewer lines are anticipated to be less than 20%. However, should field conditions warrant, sewers on 20 percent slopes or greater shall be anchored securely with concrete, or equal, with the anchors spaced as follows: a. Not greater than 36 feet center to center on grades 21 % to 35%; b. Not greater than 24 feet center to center on grades 35% to 50 %; and c. Not greater than 16 feet center to center on grades 50% and over. Mechanically fastened joints (such as MegalugTM or Certa-Lok YelomineTM) may be utilized in lieu of slope anchors in certain circumstances. The project engineer should be consulting if a substitution to the slope anchors is desired. The supply and return lines are on slopes that exceed 50%. There are no steep slopes on this project. Trenching Trench excavation shall conform to the line, depth and dimensions shown on the plans or as directed by the Engineer. The trench shall be properly braced and shored so that workmen may work safely and efficiently. If unstable conditions are encountered, the Engineer shall be notified in order that proper bedding materials may be selected. Trench excavation or 4 excavation for pipelines shall consist of excavation necessary for the construction of sewers, conduits and other pipelines and all appurtenant facilities thereof, pipe embedment materials, and pipe protection, insulating and sleeving in ductile iron pipe, as called for on the plans. It shall include site preparation, backfilling and tamping of pipe trenches and around tanks and the disposal of waste materials, all of which shall conform to the applicable provisions of these specifications. When rock, excessive organics, muck, quicksand, soft clay, swampy or other material unsuitable for foundations or subgrade are encountered which extend beyond the limits of the excavation, such material shall be removed and replaced with pipe foundation material as specified in the engineering drawings. Surface drainage shall not be allowed to enter excavated areas. Rock in Pipe Trenches Rock encountered in trench excavation shall be removed for the overall width of trench which shall be as shown on the plans. It shall be removed to a minimum depth of three (3) inches below the bottom of the pipe and replaced with a suitable compacted (to standard) fill material. If surcharges are to be levied due to excavation of rock, the Engineer must be notified to inspect and verify the rock conditions prior to backfilling. Pipe Installation The pipe material listed above shall be installed in accordance with the manufacturer's recommendations and the requirements of these specifications. All sewer lines shall be laid to the line and grade shown on the plans. No deviations from line and grade shall be made, unless they have been approved by the Engineer. The pipe interior shall be kept clean before and after laying by means approved by the Engineer. Pipe ends shall be plugged at the end of each work day or when work is temporarily stopped. The plugs shall be watertight so that water and debris will not enter the pipe. Backfilling (a) All backfilling shall be done in such manner as will not disturb or injure the pipe or structure over or against which it is being placed. Any pipe or structure injured, damaged or moved from its proper line or grade during backfilling operations shall be excavated, repaired and then re- backfilled as specified herein. All backfill shall be compacted to a minimum of 95% Standard Proctor. The contractor is responsible for procuring testing from a qualified geotechnical testing firm and providing documentation of testing if requested. (b) The Contractor shall replace all surface materials and shall restore paving, curbing, sidewalks, gutters, shrubbery, fences, sod, and other surfaces disturbed, to a condition equal to that before the work began, furnishing all labor and materials incidental thereto as provided elsewhere in contracting agreements. The backfilling of the trench after the pipe installation and testing shall be in accordance with the standard trenching detail in the engineering construction drawings. Testing All gravity (non -pressurized) sewer lines shall be tested by Low Pressure Air Exfiltration Testing with the following steps. 1. All branch fittings and ends of lateral stubs shall be securely plugged at each manhole. All stoppers shall be adequately braced when required. 2. Air shall be slowly supplied into the plugged pipe line until the internal air pressure reaches 4.0 pounds per square inch or 4.0 pounds per square inch greater than the average back pressure of any ground water that may submerge the pipe. At least two minutes shall be allowed for temperature stabilization before proceeding further. 3. Calculate the pressure drop as the number of minutes for the air pressure within the pipeline to drop from a stabilized pressure of 3.5 to 2.5 psig. 4. The time allowed for mixed pipe sizes of varying lengths should be calculated as described in ASTM C828-76T. 5. The following times are for one pipe size only: Pipe Size (inches) Time, T (sec/100 ft) Allowable Air Loss, Q (ft3/min) 6 42 2.0 8 72 2.0 10 90 2.5 12 108 3.0 15 126 4.0 18 144 5.0 21 180 5.5 24 216 6.0 27 252 6.5 30 288 7.0 6. The pipe line shall be considered acceptable if the time interval for the 1.0 psi pressure drop is not less than the holding time listed in the following table. 7. If the test fails, the Contractor will be required to locate the cause of the failure, make necessary repairs, and repeat all testing of the line until the test is passed. M. For pressure sewer lines the following Hydrostatic Testing Procedure shall be utilized. 1. As a minimum, all sewer force mains shall be tested in accordance with the Hydrostatic Testing Requirements of AWWA C600. 2. After pipe has been laid and backfilled, all newly laid pipe or any valve section thereof shall be subject to a hydrostatic pressure of not less than 150 psi or 1-1/2 times the working pressure, whichever is greater. The duration of the pressure test shall be two hours. Each valve section of the pipe shall be slowly filled with water. All air shall be expelled from the pipe while the pipe is being filled and before the application of the specified test pressure. Taps may be required at points of highest elevation. These taps are to be tightly plugged after completion of the test. 3. The test pressure shall be applied by means of a pump connected to the pipe in a manner satisfactory to the Project Engineer. The pump, pump connections, gauges, and all necessary apparatus and labor shall be furnished by the Contractor. The Contractor shall calibrate the gauges in the presence of the Design Engineer. 4. A test shall be made only after a part or all of the backfilling has been completed and at least 36 hours after the last concrete thrust block has been cast with high -early strength cement or at least seven (7) days after the last thrust block has been cast using standard cement. 5. Any cracked or defective pipes, fittings, or valves discovered during hydrostatic pressure tests shall be removed and replaced with sound material and the test repeated until satisfactory to the Design Engineer. 6. Leakage shall be defined as the quantity of water that must be supplied into the newly laid pipe, or any valved section thereof, to maintain pressure within 5 psi of the specified test pressure. Leakage shall not be measured by a drop in pressure in a test section over a period of time. 7. Allowable leakage shall not exceed the following U.S. gallons per hour reported in Table 1: Table 1. Allowable leakage per 1000 ft of pipeline (gph) Avg. Test Pr 'essure (PSI) NUMINIAL F IYC UIHIVIC I CI-C (INl Y1tJJ 0� 3 4 6 8 10 12 250 0.36 0.47 0.71 0.95 1.19 1.42 225 0.34 0.45 0.68 0.90 1.13 1.35 200 0.32 0.43 0.64 0.85 1.06 1.28 175 0.30 0.40 0.59 0.80 0.99 1.19 150 0.28 0.37 0.55 0.74 0.92 1.10 125 0.25 0.34 0.50 0.67 0.84 1.01 100 0.23 0.30 0.45 0.60 0.75 0.90 7 If the pipeline under test contains sections of various diameters, the allowable leakage will be the sum of the computed leakage for each size. Alternatively, no pipe installation will be accepted if the leakage is greater than that determined by the following formula: In inch -pound units, L _ ,SDJ 133,200 Where: L = allowable leakage, in gallons per hour S = length of pipe tested, in feet D = nominal diameter of the pipe, in inches P = average test pressure during the leakage test, in pounds per square inch (gauge) The Contractor shall notify the Project Engineer when the work is ready for testing, and all testing shall be done in the presence of a representative of Brooks Engineering. All labor, equipment, water, and materials, including meters and gauges, shall be furnished by the Contractor at his own expense. Valvinp Valving shall be consistent with material types and sizes of piping as shown on the Engineering Plans. Any air release valves must be mechanical lever air/vacuum relief valves (not flapper type). `3 3.0 WA S TEWA TER TREATMENT SYSTEM The wastewater pre-treatment system consists of the appropriately sized septic tank and EZ Treat media filtration aerobic pretreatment system. Locations of the treatment equipment shall meet the setback requirements set forth in NCAC 2H .0100, et. sec. 3.1 Septic Tank Septic tank sizing meets the criteria outlined 15A NCAC 18A .1952 and shall be consistent with sizing specified in EZ Treat NCDHHS approval IWWS-2015-03-R1. Alternate tank manufacturers may be utilized but sizing and construction specifications must be met. All tanks shall be precast concrete and meet construction and testing specifications outlined in15A NCAC 18A. 1953. All tanks shall be tested for leakage by either a 24 hour leak test or vacuum testing by the tank manufacturer. All inlets and outlets shall have 4" rubber pipe boots precast in to the tanks. Risers shall be NCDENR approved plastic risers with riser rings precast in to tanks. The initial and post - anoxic septic tank shall be equipped with an NCDENR approved residential septic tank filter. The filter handle must be accessible without the operators head entering the tank riser. 3.2 Aerobic Pretreatment System The aerobic pretreatment system specified is an EZ Treat Model 600 system to be installed and maintained in accordance with IWWS approval 2015-03-R1. All conditions outlined in the approval shall be met. The following manufacturer specifications shall be met. Excavation and Backfillin 1. Excavated materials acceptable as backfill shall be stockpiled in a location approved by the Owner. The materials shall be located away from the edge of any excavations. Excavated materials shall not be stored within the drip lines of existing trees. 2. All open excavations shall be barricaded when construction in the area has stopped. Night barricading should include posted warning lights. 3. Protect existing structures, utilities, sidewalks, pavement, and other facilities from damage caused by settlement, lateral movement, undermining, washout, and other hazards created by earthwork operations. Protect root systems from damage or dry - out to the greatest extent possible. 4. Soil materials shall be free of boulders, roots, sod, organic matter, and frozen material. 9 5. Bedding materials for pre -cast concrete structure installation shall be #57 washed stone to the dimensions and depth shown on the construction drawings. 6. All excavation is unclassified and includes excavation to sub grade elevations indicated on the construction drawings regardless of character of materials and obstruction encountered. In the event that rock is encountered, the Contractor shall remove it at no additional cost to the owner. 7. Stability of excavations shall be maintained by sloping of the sides and shall comply with local codes, ordinances, and requirements of agencies having jurisdiction. Where space restrictions prevent sloping of the sides, shoring and bracing of the walls shall be employed in full compliance with OSHA requirements. In the case of pipe installations, sheeting shall remain in place until backfilling progresses to a stage where no damage to the pipe will result from removal. 8. The Contractor shall attempt to prevent surface and subsurface water from flowing into excavations. The Contractor shall provide equipment, materials, and work necessary to dewater any accumulation of water in the excavation to prevent softening of the soils, undercutting of footings, and changes to the soils detrimental to the stability of the improvements. 9. Excavations for structures shall conform to dimensions and elevations shown on the construction drawings within a tolerance of plus or minus 0.10 feet and to the standards of ASTM C891-90. 10. Backfill shall be installed to excavated spaces in 8-inch lifts and tamped by hand or pneumatically around pipe or structures. Tamping shall be performed evenly on both sides of pipe and around sides of structures to a depth such that damage to the pipe or structures is avoided as a result of subsequent methods of compaction. Extreme care shall be exercised in backfilling operations to avoid displacement of pipe and structures either horizontally or vertically. Backfill consolidation by ponding water is not permitted. Compaction of each layer of backfill and the top 6 inches of sub -grade shall achieve a 90 percent maximum dry density as measured by AASHTO method T- 99. 11. Remove all waste materials including unacceptable excavated material, trash, and debris and legally dispose of it off Owner's property. Where settling is measurable or observable at excavated areas during project warranty period, the Contractor shall remove surface finish, add backfill material, compact, and replace surface treatment to a quality and appearance matching adjacent areas of previous work. Septic Tank and Recirculation Tank Installation and Testing 1. Septic tanks shall conform to criteria in NCAC 18A .1953. The septic and recirculation tank should be installed on a 6-inch minimum layer of No. 57 washed stone aggregate. 2. Place bell ends of pre -cast sections or the groove end of the concrete facing down. In preparation for making joints, all surfaces of the portion of the section to be jointed and the factory -made jointing materials shall be clean and dry. Each joint, seam, and pipe 10 penetration inside and outside of joints shall receive liberal applications of non -shrink grout as well as liberal amounts of bitumastic waterproof sealant. Lifting holes and other penetrations of the pre -cast structure wall shall be sealed with non -shrinking grout. Pipe connections shall be made so that the pipe does not project beyond the inside wall of the structure. Grout connections as necessary to make smooth and uniform surfaces on the inside of the structure. 4. Before placing any tank into operation, remove any dropped grout, sand or other imperfections and obstructions from the interior of the structure. Specifically, the inside walls of the tank shall be smooth and uniform. Smooth -finish inverts so that wastewater flow is confined and directed through the inlet and outlet pipes with easy transition. 5. Tanks shall be backfilled in accordance with the applicable specifications herein before described. 6. All pipe penetrations shall be through Press -Seal Cast -A -Seal 402 or approved equal. 7. All joints (mid -seam, top -seam) shall be sealed using Concrete Sealants butyl sealant #CS-102 meeting ASTM C-990. 8. All service access openings will be a minimum of 24 inches. Exceptions may be made on a case by case basis with E-Z Set Company's and engineer's prior written approval. All access openings shall be fitted with E-Z Set Company riser assemblies. 9. A 24-hour static water test, in accordance with ASTM standards, shall be performed on all precast tanks in order to insure they are water tight. a. The testing shall be performed in the presence of the engineer or his representative. b. Each tank shall be filled with water and the initial water level shall be measured. C. At the end of the 24-hour period the level of the water shall be measured again. d. The engineer shall pass the tank if the water level did not drop more than 0.5 inches or if the total volume of the displaced water is less than 1 percent of the total effective liquid capacity of the tank. e. Tanks may also be leak -tested by applying a vacuum of 5-inches of Hg with riser assemblies in place. f. Each failed tank shall be tested again. In the event that the tank does not pass the second test, the Contractor shall remove and replace the tank at no additional cost to the owner. 10. Septic Tank and Recirculation Tank shall meet the following additional criteria: a. Minimum liquid depth of 36 inches. b. Minimum airspace of 9 inches. c. Length shall be at least twice as long as the width. d. Septic tank shall be constructed with a baffle wall dividing the tank interior 2/3rd to 1/3rd. The baffle wall shall be constructed to permit passage of effluent through a slot or holes located between 45 and 55 percent of the interior depth. e. Recirculation tank shall be a true two compartment(s), with a baffle wall dividing the tank interior 2/3rd to 1/3rd. The baffle wall shall be constructed so liquid levels in either compartment are independent and liquids will not by-pass 11 between compartments except as designated by the system's treatment flow path. f. Septic tank shall be fitted with an effluent filter that extends down to 50 percent of the liquid depth of the tank. Piping Installation and Testing 1. Piping shall be PVC and of type and size as shown on the construction drawings. Piping shall be installed with a minimum of three (3) feet of cover unless shown otherwise on the construction drawings. 2. Piping shall be installed to be able to meet a pressure test whereby the pressure remains constant for a minimum of two hours, and the allowable leakage is not more than 10 gpd/inch of pipe diameter/mile. 3. Any line installed under the driveway shall be sleeved in Class 52 Ductile Iron Pipe and extend a minimum of 5 feet on either side and as shown on the construction drawings. 4. EZ Treat shall provide the bypass valve and all specialty fittings. PVC piping and connections are the responsibility of the contractor. E-Z Treat Dosing Pump and Control Panel 1. The E-Z Treat dosing pump shall be Sta-Rite_STEP 20 model for operation on a single phase, 115 Volt service, or preapproved equal. 2. The control panel shall be an American SR-12 simplex panel. The panel shall have one on/off timer, high/low water alarm, and low water level/run dry pump protection. 3. The control panel shall be in a NEMA 4X enclosure, installed in accordance with the manufacturer's recommendations, and within 10 feet of the E-Z Treat unit. 4. No splices may be placed in the pump tank or riser. All splices shall be made above ground in a NEMA 4x junction box. 5. Control and alarm circuits shall be on separate circuits. 6. The audible/visual alarms shall be external to any structure. 7. Timer on the panel shall be preset for a 2 minute on/ 10 minute off regime which may be changed at the engineer's or manufacturer's discretion. 8. Panel must include daily, 7-day and 30-day logging capabilities. 3.3 Post Aeration Apparatus The post aeration apparatus shall be constructed of concrete with a Class C rip -rip energy dissipater as shown on the Engineering Drawings. During excavation remove spongy and otherwise unsuitable material and replace with approved material. Loosen exceptionally hard spots and re -compact. Take every precaution to obtain a subgrade of uniform bearing power. 12 When necessary, compact subgrade with a high-energy mechanical tamper. Compaction shall be a minimum of 95% of Standard Proctor to within 2' of final grade and 100% of Standard Proctor in the upper 2' in accordance with ASTM D 698. Concrete shall be of Standard weight concrete, ready -mixed concrete conforming to ASTM C 94. Maximum size aggregate of 1". Maximum slump of 4". Minimum compressive strength at 28 days, 3,000 psi. Concrete shall comply with requirements of Section 03300 - Cast -In -Place Concrete for air entrained concrete. Concrete shall be places on a 4" aggregate base. Forms shall be -wood or steel, straight, of sufficient strength to resist springing during depositing and consolidating concrete, and of a height equal to the full depth of the finished paving. Provide an industry standard sealant. 13 4.0 SITE PREPARATION 4.1 Clearing & Grubbing The disposal areas must be cleared and grubbed. Clearing and grubbing allowed in in areas as needed for equipment access and tank setting but is to be minimized 4.2 Seeding & Mulching Fertilizing, seeding, and mulching of disturbed areas not utilized for the drainfield installation shall be completed within ten (10) working days following completion of system installation and final inspection of the system by the project engineer or local health department. This may require that a temporary seeding mixture be used during given dates of the year when permanent seeding would not be allowed. Jute, Excelsior or Mulching All seeded areas shall be mulched. Grain straw may be used as mulch at any time of the year. If permission to use material other than grain straw is requested by the Contractor and the use of such material is approved by the Engineer, the seasonal limitations, the methods and rates of application, the type of binding material, or other conditions governing the use of such material will be established by the Engineer at the time of approval. Applying Mulch (1) Mulch shall be applied within 24 hours after completion of seeding unless otherwise permitted by the Engineer. Care shall be exercised to prevent displacement of soil or seed or other damage to the seeded area during the mulching operations. (2) Mulch shall be uniformly spread by hand or by approved mechanical spreaders or blowers which will provide an acceptable application. An acceptable application will be that which will allow some sunlight to penetrate and air to circulate but also partially shade the ground, reduce erosion, and conserve soil moisture. (3) Straw mulch shall be applied at the rate of not less than 2 tons per acre. Maintenance of Seed and Mulching: Areas where seeding and mulching have been performed shall be maintained in a satisfactory condition until final acceptance of the project. 14 Erosion Control (a) During the construction of the project, the Contractor shall be required to take the necessary steps to minimize soil erosion and siltation of rivers, streams, lakes and property. The Contractor shall comply with the applicable regulations of the appropriate governmental agencies in regard to soil erosion control and sedimentation prevention. Additional permitting may be required for erosion control. It is the contractor's responsibility to make that determination and adhere to local and state permitting requirements. (b) The Owner will limit the area over which clearing and grubbing and excavation operations are performed. (c) Prior to the end of each work day on the project, the Contractor shall take the necessary measures to protect the construction area from erosion. (d) Temporary and permanent erosion control measures shall be accomplished at the earliest practicable time. Temporary erosion control measures shall be coordinated with permanent measures to insure economical effective and continuous erosion control during the life of the project. (e) Temporary erosion control measures shall include, but are not be limited to the use of temporary berms, dams, dikes, drainage ditches, silt ditches, silt fences, vegetation, mulches, mats, netting or any other methods or devices that are necessary. (f) Erosion control measures installed by the Contractor shall be suitably maintained by the Contractor until the site is fully stabilized. (g) Where excavation is adjacent to streams, lakes or other surface waters, the Contractor shall not place excavated materials between the excavation and the surface waters. (h) Where live streams are crossed by the project, the Contractor shall exercise particular care to minimize siltation of the stream. Temporary erosion control measures shall be constructed. These may include but not be limited to use of coffer dam in the stream, dikes, diversion ditches and/or temporary sediment traps at the top of the banks, and silt fences on all creek banks. All temporary erosion control measures shall be acceptably maintained until permanent erosion control measures are established. (i) Where runoff on natural ground may cause erosion of the trench or erosion of the backfill in the trench, the Contractor shall construct temporary erosion control 15 measures. These may include but not be limited to diversion ditches, check dams and silt basins or other suitable erosion control measures. Q) Permanent seeding of disturbed areas shall be accomplished at the earliest practicable time. (k) Gravel construction entrances shall be installed at all locations used regularly as ingress and egress to the project site. (1) Stream and River Crossings Diversion ditches shall be constructed at or near the top of each river bank at river crossings. Localized stormwater runoff shall be diverted by way of the diversion ditches away from the disturbed stream bank. Other specified erosion control material shall be used in ditches and swales. 16 5.0 INSPECTION AND MONITORING PROCEEDINGS 5.1 Pre -Construction Meeting A pre -construction meeting shall be scheduled which shall include the contractor, a DEQ representative, the engineer or his representative, and the system(s) manufacturer representative. Scheduling this meeting shall be the responsibility of the installation contractor and all parties shall receive a minimum of one week's notice prior to the meeting date scheduled. Any changes to the plans requested by the contractor or DEQ representative will be discussed at this meeting and responded to within 3 business days by the engineer. 5.2 Intermediate Inspection of the System during Construction The contractor shall notify the engineer in time to inspect the site and insure proper installation of the system components prior to backfilling. Periodic inspections by project engineer during installation to assure compliance with agreed - upon installation procedures for drainfield installation shall be required. A specific schedule can be established at the preconstruction meeting. 5.3 Final Inspection & System Start -Up A copy of the engineer's Inspection Form shall be provided at the pre -construction meeting. This document shall be utilized during final system inspection and start-up. Start-up Procedures Start-up testing shall be required for all electrical and pressurized components of the onsite wastewater system. Testing of all components to insure operation in accordance with intended function shall be checked and recorded. Potable water shall be utilized for all system testing. 17 Pumps and Controls Potable water shall be introduced into the pump tank sufficient to activate (either by float switches or time -dose) the pumping system for 2 on/off dosing cycles for the treatment pod. All spray nozzles shall be checked to insure a consistent spray pattern over the media. A minimum of 10 psi pressure shall be maintained in the pod distribution piping. 6.4 Regular Monitoring Routine inspections of the system are required per the manufacturer's recommendations. The inspections shall be contracted by the property owner and conducted by a private Certified Operator other individual certified by EZ Treat. The monitoring schedule shall be consistent with NCG55185. Routine inspections shall include at a minimum: 1. checking the sludge levels in the septic tanks and pump tank. 2. cleaning the septic tank filters and grease trap filter. 3. checking the pumping system to insure both pumps are operational. 6.5 Residuals Management Sludge generated in the treatment system as well as biomass buildup in the media pods shall be monitored on a semi-annual basis. Should sludge build-up be identified, as demonstrated by increased TSS in the effluent or by tanks checking with a sludge -judge, the tankage should be pumped by a licensed septage hauler for disposal at a local POTW permitted for off -site septage processing. 18 6.0 CALCULATIONS 6.1 Buoyancy Calculations DOSE TANK Assumptions * Worst Conditions for tank upheaval are assumed to be with the tank empty. --Input Value Calculated Value Density of H2O (lb/cu. ft) Density of Soil (lb/cu. ft) Density of Steel (lb/cu. ft) Density of Concrete (lb/cu. ft) Tank Dimensions Concrete Tank Material Length (ft) Width (ft) Height (ft) Top Thickness (ft) Wall Thickness (ft) Bottom Thickness (ft) Baffle Thickness - avg (ft) Depth below G.S. (ft) Volume of Tank (gal) 201 Volume of Tank (cu. ft) _Weight of Tank (lb) from Mfr. 10,448 Weight of Tank Calculated Effective Soil Weight 55.4 Volume of Soil over Concrete Tank(cu. ft) 5,539 Weight of Soil over Concrete Tank (lb) Effective Weight of Water in Tank gal/in in Tank Depth above Pump (in) 0.0 Gallons below minimum liquid level over pump - Weight of water in tank (lb) Len Tank Force Analysis 15,628 Effective Downward Force (lb) = water in tank + wt concrete + wt of soil over buoyancy counter measures 12,513 Buoyancy Force (lb) = volume of submerged tank x density of water yes Is downward force approximately 1.2 x buoyancy force? The tank will not rise due to upheaval. I Heioht Ground Surface Brooks Engineering Associates, PA 4/5/2019 SEPTIC TANK Assumptions * Worst Conditions for tank upheaval are assumed to be with the tank empty. -_Input Value Calculated Value Density of H2O (lb/cu. ft) Density of Soil (lb/cu. ft) Density of Steel (lb/cu. ft) Density of Concrete (lb/cu. ft) Tank Dimensions Concrete Tank Material Length (ft) Width (ft) 5: Height (ft) 0- 3. Top Thickness (ft) 0.2 Wall Thickness (ft) 0.3 Bottom Thickness (ft) 0. Baffle Thickness - avg (ft) �._ Depth below G.S. (ft) Volume of Tank (gal) 201 Volume of Tank (cu. ft) Weight of Tank (lb) from Mfr. 13,879 Weight of Tank Calculated Effective Soil Weight 69.0 Volume of Soil over Concrete Tank(cu. ft) 6,897 Weight of Soil over Concrete Tank (lb) Effective Weight of Water in Tank gal/in in Tank Static Water Level (in) 0.0 Gallons below minimum liquid level over pump - Weight of water in tank (lb) Tank Force Analysis 19,782 Effective Downward Force (lb) = water in tank + wt concrete + wt of soil over buoyancy counter measures 12,513 Buoyancy Force (lb) = volume of submerged tank x density of water yes Is downward force approximately 1.2 x buoyancy force? The tank will not rise due to upheaval. Ground Surface Brooks Engineering Associates, PA 4/5/2019 6.2 Pod Recirc Ratio Run Time Rest Time Dose Cycle Time Pods Dose Per Cycle GPM per dose/pod Gallons per Cycle Cycles per Day Recirculation Ratio PROCESS DESIGN CALCULATIONS POD DOSING REGIME CALCULATIONS z min 10 min 12 min 1 pod 20 gpm 40 gal 120 5.00 to 1 6.3 TDH Calculations for Pod Dosing (and Pump Curves) POD DOSING PUMP TDH = AH + hm where: AH = elevation head hm = major pipe losses, utilize Hazen Williams equation with equivalent lengths for fittings hm = (4.727 L/ d4.81) (Q/C)1.85 where: Q in cfs, L in feet, d in ft. no user input user input req'd Piping: _ Diameter = inches (nominal) equals 1.59 inches (ID) 0.1325 ft. NODE: INPUTS Elevation Head Loss Major Losses Equiv. Length Sum No. inputs Fittings Details Initial Elev. Final Elev. L "C" (FT) Eq. Length 1 Pie 26.0 90 DEG ELL threaded 5 25.00 45 DEG ELL threaded 3 0.00 90 DEG TEE threaded 7 7.00 COUPLING threaded 1.5 1.50 GATE VALVE threaded 1 2.00 GLOBE VALVE threaded 45 0.00 ANGLE VALVE threaded 22 0.00 1_ CHECK VALVE threaded 14 14.00 5 45 4 3.5 3 a 25 2 is t 0.5 0 Q (gpm) /.H hm (feet) TDH PSI Velocity 3 7.00 0.08 7.08 3.1 0.54 5 7.00 0.20 7.20 3.1 0.91 10 7.00 0.71 7.71 3.3 1.82 15 7.00 1.51 8.51 3.7 2.72 20 7.00 2.57 9.57 4.1 3.63 25 7.00 3.89 10.89 4.7 4.54 30 7.00 5.45 12.45 5.4 5.45 35 7.00 7.25 14.25 6.2 6.36 40 7.00 9.28 16.28 7.0 7.27 45 7.00 11.54 18.54 8.0 8.17 EZ TREAT SPRAY NOZZLES 5 7 10 20 30 40 60 80 100 15C PSI -GPM spray nozzle flow 75.46 GPM PSI 0.91 1.1 1.3 1.7 2.1 2.4 2.9 3.3 3.6 4.3 5 7 10 20 30 40 60 80 100 150 Brooks Engineering Associates P. 1 of 1 8/18/2016 7.0 Manufacturer Cut -Sheets 7.1 Tanks 7.2 EZ Treat © 2008 Details Provided by APPIAN Consulting Engineers www.appionengineers.com 06/30/2008 — 3:48:28 PM GENERAL NOTES: 1. Design specifications conform to latest ASTM C1227 specifications "Precast Concrete OUTLET _ o INLET Water and Wastewater Structures" WATER = p 2. Concrete compressive strength 4,000 psi minimum. LEVEL 0 O 3. Steel reinforcing design to conform to the requirements of ASTM C890 specifications for O 0—_ — "Structural Design Loading for Water and Wastewater Structures" and shall utilize grade Q N FLOW 60 re -bars conforming to the requirements of ASTM A615 or WWF conforming to the LO "' N requirements of ASTM A185 or both. Place Additional reinforcing at all openings. 4. Optional Cast Iron casting with 24" dia. access in top section per NCDOT standards or ELEVATION optional 20" round EZ set lid or as otherwise specified. Supplied by either Dellinger Precast r- or customer. To be field adjusted using approved methods by contractor. OPTIONAL 5. Pipe penetration locations as per job requirements. Pipe inlet and outlet locations to ROUND LID ' have PSX Direct Drive boots or equal. Pipe Inlet locaions (typical 3 sides) to be knock 2 out pannels. Effluent Filter supplied by Dellinger. Inlet Tee & Pipe supplied by contractor. 6. Joints to be sealed with ConSeal CS102. butyl rubber joint sealant or r� I ;DIA equal. Sealant meets or exceeds the requirements of latest federalspecification SS-S-0021(210-A), AASHTO M-198B,and ASTM C-990-91. 7. Lift Insert / Lift Eye Pin by M.A Industries or equal, j 5" 2 Cast-in by Dellinger Precast. Lifts meet or exceed L - - - - _ _ _ - - J OSHA requirements. '. ` 52„ TOP & 8. Method of namufacture is Wet Cast. ■ 9. Sections are monolithic. Weights: "(0.) W: 46�Cj.�)DIM'BOTSOM Top Section 4,271 ±lbs. 1�" 11 � ��.p ) Base Section 4,426 ± lbs. 10. I.D. = Inside dimension 106p.) 4" KO INLET O.D. = Outside dimension 100 ' (TYP. 3 SIDE) L =Length TEE - SEE F�G� W =Width II NOTES 3 & 5 H = Height ' �� r I 0 LO u 0 0 u, NOTES 3 & 4 IMPRINT: 0- STB-79 F__ 1000 Gal. Y U = 4" OUTLET ~ EFFLUENT FILTER M NOTES 3 & 5 30% LIQUID - DEPTH FROM BOTTOM. BOTH SIDES. NOTE 10 w rn co v 4" WIDE = SLOT CV Cl) 3" THICK 1 WALLS TYP. ,108 TP�K Z„ 1'� �G 113 2" x 6 1 /2" VENT AT TOP OF BAFFLE TOP SECTION 'Y\S AMID SEAM DIM'S I I 60 N ' tom`. �h \ NOTE 3 4" THICK BAFFLE @ BASE & TOP iff 1,000 Gallon (Mid Seam) SEPTIC TANK 4531 North Hwy 16 - Denver, N.C. 28037 ■ Phone: 800-948-1666 ■ 704-483-2868 - Fax: 704-483-2363 BASE SECTION Scale: Not To Scale Revision Date: February 2008 Detail # ST-1,000-MS - 4 Top View 60 ".5 54.5" 20 Access openings to receive concrete lids, rings/covers, aluminum hatch, or as specified. a Side knockouts to receive 4" pipe or as specified. 26" _-A 3" } ConSeal CS102, 20 " --� - 26 " - butyl rubber - sealant or equal in all joints. Outlet ' Inlet Inlet port opening 4" State approved rubber boots. Outlet port opening 2" State approved rubber boots. 45 " 43 " Plan View PT - 283 Non Traffic Rated Liquid Capacity 1,000 Gallons 4000 PSI (min) Concrete Est Weight: Top 1,712 Ibs; Base 5,865 Ibs Manufactured By: By_ DELLINGER PRECAST, iNC. 4531 North Hwy 16 Denver, NC 28037 Phone 800-948-1666 704-483-2868 Fax 704-483-2363 NPCA Certified Plant 21.47 Gallons/inch 54 50 " 60 ".5" _ .. _ 26" 4" 60.5" 54.5" End View 4 ,. E-Z ��►TREAT PO Box 176 Haymarket, Virginia 20168 Re -Circulating Synthetic Sand/Gravel Filter Reuse Independent Testing BOD-2.6/TSS-1.8/Turbidity-2/Ph-7/Nitrogen Reduction 66% NSF C.Mn.d to NSF/ANSI Standard �O Class I E-Z Treat Re -Circulating Synthetic Sand Filter System Overview YV i V EPA Design Guidelines Figure 1. Typical Recirculating sand filter system Inflow I Concrete or liner enclosure Distribution Ones ............. Septic tank C, ixecx% Filter endI ---- effluent ...... --- Outflow 4--= float Ball Open sand fifter Underdrain valve Pump Recirculation/dosing tank E-Z TREAT RECIRCULATION SAND/MEDIA FILTERS ISTRIBUTION LINES SEPTIC TANK INFLOW RECIRCULATION PUMP DISCHARGE BALL FLOAr-7w VALVE -J�,_PUMP RECIRCULATION/DOSING TANK E-Z Treat System Technology As the U.S. EPA document "Technology Assessment of Intermittent Sand Filters" states: "Intermittent sand filter filtration of wastewater is not new technology" the concept was employed in the U.S. in the mid-1800's. "Intermittent sand filters are ideally suited to rural community clusters, small cluster homes, individual homes and business establishments. They can achieve advanced secondary or even tertiary levels of treatment consistently with a minimum of attention." (Anderson, et al, 1985) The EPA points out that sand filters operate reliably in a trouble free manner and the technology is very "fail safe" in that it is inherently stable. The biology of the system is quite diverse, typically including many trophic levels of microorganisms, and some macro organisms. (Calaw et al, 1952, Calaway, 1957) These characteristics render the process inherently resistant to upset and also allow it to readily accommodate sanitations where loading is highly non -uniform. Design Many types of media are used in packed -bed filters. Washed, graded sand was the most common. Other granular media used include crushed glass, garnet, anthracite, plastic, expanded clay, expanded shale, open -cell foam, extruded polystyrene, and bottom ash from coal-fired power plants. Media characteristics can limit the number of doses possible. Media re -aeration must occur between doses. As the effective size of the media decreases, the time for drainage and re - aeration of the media increases. The BOD51oading should decrease with decreasing effective size of the sand. Recirculation tank sizing For single-family home systems, the recirculation tank is typically sized to be equal to .75 to 1 times the design peak daily flow. Recirculating filter performance dSingle-family home filters. media: es = 4.0 mm; uc = <2/5. Design hydraulic loading (forward flow)= 25 gpd/ft2. Recirculation ratio = 5:1. Doses per day = 48. Open surface, winter operation. RSFs are extremely reliable treatment devices and are quite resistant to flow variations. In general, gravel RSF systems are far less prone to odor production than RSFs. Increased recycle ratios should help minimize such problems. However, power outages will stop the process from treating the wastewater, and prolonged outages would be likely to generate some odors. Operating Costs Power costs for pumping at 3 to 4 kWh/day are in the range of $90 to $120 The E-Z Treat System incorporates technology resulting from years of independent research in re- circulation sand bio filtration. Our system applies each area of this technology in a pre -packaged system, insuring consistent in the field performance reducing BOD, TSS and Total Nitrogen. E-Z Treat System addresses media size and composition, drainage and ventilation, optimum dosing cycles per hour, depth of filter media, pre-treatment of effluent, pre -filtering of effluent to insure particle size, even distribution of effluent over the media and piping design that optimize treatment within the system. E-Z Treat Loading Rates In accordance with the EPA Design Guidelines and field testing of the E-Z Treat re -circulating sand/media Filter Model # 600 can be continuously loaded at 750 GPD and 2 lb BOD Model# 1200 can be continuously loaded at 1400 GPD and 4 Lb BOD. EPA research and testing has proven that system designs, such as the E-Z Treat System, will produce a high quality effluent at loading rates in excess 25 gal/ft2/day. System Overview Prior to entering the re -circulating pump tank the effluent will be treated in an anaerobic chamber fitted with an effluent filter; this filter should remove any solids greater than 1/16 inch. The second chamber will be a re -circulation chamber fitted with a float ball by-pass valve and re -circulation pump. The float ball by- pass valve connects, inside the re -circulation tank, to the 4 inch return line from the sand filter. The float by-pass valve maintains a constant liquid volume in the re -circulation tank. The float by-pass valve allows the effluent to be constantly re -circulated through the sand/media filter discharging only the daily forward flow volume after it has passed through the filter. In designs using an external splitter box the float by- pass valve would be eliminated from the re -circulation chamber. The following are recommended System & Re -Circulation Chamber sizes and Timer Settings for year round residential properties. Min. Number Timer Timer Design Septic Re-Circ of Number of Setting Setting Flow Tank Tank Units Units Mod.#600 Mod.#600 Mod.#1200 Mod.#1200 Min. GPD Sizing Gal. Mod.#600 Mod.#1200 Min./On Min./Off Min./On Min./Off 300 750 300 1 1 2.5 24 2.5 39 400 750 400 1 1 2.5 20 2.5 28 500 900 500 1 1 2.5 16 2.5 22 600 900 600 1 1 2.5 14 2.5 18 700 1000 700 1 1 2.5 21 2.5 15 800 1000 800 2 1 2.5 18 2.5 13 900 1500 900 2 1 2.5 15 2.5 11 1000 1500 1000 2 1 2.5 13 2.5 9 1100 1500 1100 2 1 2.5 12 2.5 8 1200 2000 1200 2 1 2.5 10 2.5 7.5 1300 2000 1300 2 1 2.5 9 2.5 7 1400 2000 1400 2 1 2.5 8 2.5 6 Note: Tank sizing are not exact and may vary (+ or - 10%) based on availability of locally produced tanks. 9 ............................................. ............................................. ...... - - am . .a w . 0000 a a No a a . r . . . ON am . ... .... • .... .wraa...�.... ..rr....raia�aaiaaiiaa■..��a.........r... .�i:.aii.i�i-.ia ii aiiaiia .. w•......��.aiaiiii.iii�iii.waw.w.rwaw...... ..ram a .r".ami..aliriiiii,iiw �i.r.w..r••..... tea.. a..woos ..,.ir.aaa'... r!. R. N.w M. a.�. iJ. as wa a...... = Mao.. .. ..ia ...a.�..waia " iais�iiiiirwri�•••r• a. am as as aa..r as wa.� is to a�..ai_� i a...a �. •�• w �• -• ■..raaMAN as mom aa.a.a as w is i i i.7*.■ia"lw-a•-m-aa. ■rr...�ara 6. a a a a. a ai.a a a�aaa a a We a aa.a .r..ra..w.i.aa-a.iaiaa.a.■ o ■iaa.aaaawaaa•-a••• ■......wwi■aaia..aiaisiiisi.i�.iaa..r....a....r. ■..........•ia�..... Sam moos memo aaa.w... ...ra.iaa.■■i■iiiaiii��i�.iaaaa.�...a.a....-• ..a.maw.a.wiwaa.w.�i���iiia��.w��.*.awwa-a-a. .....ww.aaawwaaa...awaaiaiiaasaaaa.a.w•w•+•-� Iwl.l.� is IF a a a a i a a a i i iii i i i a i a■i a a a a a a s w e wa" -=maiSiiaaaaiii.iii0i*i60a0iaaiiaaaowiw=d This media is very uniform and provides ample surface area for biological growth. The media also has enough voids to accommodate good air and liquid flow; these void spaces also allow the passage of very small solids that would clog many filters. The media is very lightweight making it resistant to compaction which can lead to poor air and liquid flows, a problem that plagues many media filters. The media consists of lightweight, non -biodegradable plastic spheres. Model # E-Z Treat 600 -. _.__.. 49 /" SAL 3.25 �- �n�•n MODEL — 600 �In -DWa. -140m SCALE: 1:74WEMGWT-.. ..... SHMI&I E-Z Treat Model# 1200 91; (W) _ _-._ saes onaawee s•eraro w,E __._ � Horace occwu i • ea rrt —. ,..—•..•- THEE MCY CECM1l t MO wren ... 'w•rerr a re�4eM i am a. Iwomewrs IYie AarleaR '.warm i IMYFMp1 oow�C+uRawyo ,LL VALVE TILE' SIU DWG. NO A E—Z TREAT-3 SCALE: 1:50WEIGHT: SHEET 1 5 Spraying Systems CO.' P Y y Experts in Spray Technolog Spraying Systems Co: INDUSTRIAL SPRAY PRODuc-T's Request a FREE PrInted Copy] Home Experts in Spray Technology Catalog 70 US 1.800.95.SPRAYor click here Catalog 70 USSection BB5 Email this page Previous PacieNext Page B5 - FullJet® Spray Nozzles, Standard Spray Performance Data *At the stated pressure in psi. Nozzle Type Capacity Spray Orific Max. per ) (gallons minute)* Angle (°) * Inlet Standard Wall Angle g Capa e Free Con Type Mounted Y cit Dia. Pass Size Nom. (in.) (in.) Diae G G (in.) G H G GA G 5 7 10 20 30 40 60 80 100 150 7 20 80 G H D D D A • 1 .031 .025 .07 .08 .10 .14 .17 .19 .23 .26 .29 .35 - 58 53 • 1.5 .047 .025 .11 .13 A 5 .21 .25 .28 .34 .39 .43 .52 52 65 59 • 2 .047 .040 .15 .17 .20 .28 .33 .38 .46 .52 .58 .70 43 50 46 • 3 .063 .040 .22 .25 .30 .41 .50 .57 .68 .78 .87 1.0 52 65 59 1/8 • 3.5 .063 .050 .25 .30 .35 .48 .58 .66 .80 .91 1.0 1.2 43 50 46 • 3.9 .078 .040 .28 .33 .39 .54 .65 .74 .89 1.0 1.1 1.4 77 84 79 • 5 .078 .050 .36 .42 .50 .69 .83 .95 1.1 1.3 1.4 1.7 52 65 59 • 6.1 .094 .050 .44 .52 .61 .84 1.0 1.2 1.4 1.6 1.8 2.1 69 74 68 • 6.5 .094 .063 .47 .55 .65 .89 1.1 1.2 1.5 1.7 1.9 2.3 45 50 46 • 10 .109 .063 .73 .85 1.0 1.4 1.7 1.9 2.3 2.6 2.9 3.5 58 67 61 1/4 • 12.5 .125 .063 .91 1.1 1.3 1.7 2.1 2.4 2.9 3.3 3.6 4.3 69 74 68 • • 9.5 .109 .094 .69 .81 .95 1.3 1.6 1.8 2.2 2.5 2.7 3.3 45 50 46 • 15 .141 .094 1.1 1.3 1.5 2.1 2.5 2.8 3.4 3.9 4.3 5.2 164 67 61 3/8 • 20 .156 .109 1.5 1.7 2.0 2.8 3.3 3.8 4.6 5.2 5.8 7.0 76 80 73 • 22 .188 .109 1.6 1.9 2.2 3.0 3.6 4.2 5.0 5.7 6.3 7.6 87 90 82 • 16 .141 .125 1.2 1.4 1.6 2.2 2.7 3.0 3.6 4.2 4.6 5.6 48 50 46 • 25 .188 .125 1.8 2.1 2.5 3.4 4.1 4.7 5.7 6.5 7.2 8.7 64167 61 • 32 .203 .141 2.3 2.7 3.2 4.4 5.3 6.1 7.3 8.3 9.2 1i ' 72 75 68 1/2 • 40 .250 .141 2.9 3.4 4.0 5.5 6.6 7.6 9.1 10. 15. 1�3. 88 91 83 • 50 .266 .156 3.6 4.2 5.0 6.9 8.3 9.5 11. 13. 14. 17. 91 94 86 4 0 4 4 • 2.5 .188 .172 2.1 2.5 2.9 4.1 4.9 5.6 6.7 7.7 8.5 10 48 50 46 3/4 • 4.0 .250 .172 3.4 4.0 4.7 6.5 7.8 8.9 10. 12. 13. 16. 67 70 63 7 3 6 4 STA- RITE® c S -us The STEP Plus* 4" submersible filtered effluent pumps in 10, 20, 30 and SO GPM models offer dependable performance and value for high pressure filtered effluent applications. These STEP Plus pumps will handle "dry run" conditions where other manufacturers fail. The 10, 20, 30 and SO GPM are industry standard 3-314" in diameter. ■ Filtered Effluent... for residential, commercial, and agricultural use. Shell - Stainless steel Discharge - 10, 20 and 30 GPM models: fiberglass -reinforced thermoplastic; 50 GPM models: stainless steel Discharge Bearing - Nylatron® Impellers - Delrin" Diffusers - Polycarbonate Suction Caps - Polycarbonate with stainless steel wear ring Thrust Pads - Proprietary spec. Shaft and coupling - Stainless steel 300 grade Intake - Fiberglass -reinforced thermoplastic Intake Screen - Polypropylene jacketed Cord - 300 Volt "SOOW" jacketed 10' leads (2-wire with ground); optional 20', 30', 50' and 100' lengths available Delrin® is a registered trademark of E.I. DuPont de Nemours and Co. Nylatron® is a registered trademark of Polymer Corp. ST.E.P. Plusm is a registered trademark of Pentair Water. In order to provide the best products possible, specifications are subject to change. ST E m Pm I%v c, SIA-RITE EFFLUENT PUMP Proven "Floating Impeller" Staging System - Incorporates Pt -in -class performance, sand handling and thrust management staging system with the industry exclusive "dry -run" design element. Reinforced engineered composites and stainless steel, offering high resistance to corrosion and abrasion. Discharge - Tested -tough, fiberglass - reinforced thermoplastic, with proven internal check valve. Large wrench flats and rope hole. Shell - 300-grade stainless steel pump shell offers high corrosion resistance. Shaft - Hexagonal 3/8", 300-grade stainless steel pump shaft; offers generous impeller drive surfaces. Shaft Bearing - Exclusive self- lubricating Nylatron bearing resists wear surface from sand. Motor Bracket - Tested -tough, fiberglass -reinforced thermoplastic; incorporates an integral suction screen. Customer Service: (888) 782-7483 ■ Fax Orders: (800) 426-9446 ■ www.pumps.com ■ Pentair Water ■ Delavan, WI 53115 USA ■ S5594SES STA-RITE' CAPACITY LITERS PER MINUTE 0 25 50 75 100 300 250 w 200 W LL Z 0 w 150 x J Q 0 100 50 0 10 20 30 CAPACITY GALLONS PER MINUTE CAPACITY LITERS PER MINUTE 0 25 50 75 100 125 150 175 1 I I I 1 I I n5 2 300 80 250 rn 60 W W 200 W W LL 4` z z 0 Q 150 40 = _ J a � 0 ° 100 20 50 00 60 175 sTF A 10 SO F 150 ? 125 a 1ay1 J 100 Q OF 75 __... STFA ST �3A a tiA _ ,(, 40 Q h- uj LL 40 g z z Q W w 30 J F 0 20 ~ -... o' a 2 7/ 7Yp so _ 2S 110 0 10 20 30 40 50 0 CAPACITY GALLONS PER MINUTE CAPACITY LITERS PER MINUTE D 25 50 75 100 I I I I i i S�Fp? i 0 10 20 CAPACITY GALLONS PER MINUTE T 80 10 30 CAPACITY LITERS PER MINUTE 0 50 100 150 200 250 300 H II r I I I I i so IN h1lb.10 is MEN Ill I I I bN- lbo- on III III _1;, 1 00211!112 411111 � I� rll 35 30 25 Cr W w w i 20 z a w 15 x J Q F 0 F 10 5 — 0 0 10 20 30 40 50 60 70 80 CAPACITY GALLONS PER MINUTE Customer Service: (888) 782-7483 ■ Fax Orders: (800) 426-9446 ■ www.pumps.com ■ Pentair Water • Delavan, WI 53115 USA ■ S5594SES 3 STA- RITE® ORDERING •R• Catalog Number HP Stages Max. Load Amps Volts Phase/7Length Cycles STEP10 1/2 6 10.5 11S 1/60 STEP20 112 5 10.5 115 1/60 10' STEP30-05121 1/2 3 9.S 115 1/60 10' STEP3OX20FT--05121 1/2 3 9.5 11S 1/60 20' STEP30X30FT-05121 1/2 3 9.5 115 1/60 30' STEP30-05221 112 3 4.7 230 1/60 10' STEP30X20FT-05221 1/2 3 4.7 230 1/60 20' STEP3OX30FT-05221 112 3 4.7 230 1/60 30' STEP30-10221 1 5 9.1 230 1/60 10' STEP30X20FT-10221 1 5 9.1 230 1/60 20' STEP30X30FT-10221 1 5 9.1 230 1/60 30' STEP30-15221 1-112 6 11.0 230 1/60 10' STEP30X20FT-1 S221 1-112 6 11.0 230 1/60 20' STEP30X30FT-15221 1-1/2 6 11.0 230 1/60 30' STEPSO-10221 1 3 9.1 230 1/60 10' STEPSOX20FT-10221 1 3 9.1 230 1/60 20' STEPSOX30FT--10221 1 3 9.1 230 1/60 30' STEP50-1 S221 1-112 4 11.0 230 1/60 10' STEPSOX20FT--15221 1-1/2 4 11.0 230 1/60 20' STEPSOX30FT-1S221 1 1/2 4 11.0 230 1/60 30' RFCIRC PUMP PERFORMANCEPUMP Gallons/Liters per Minute Head (Feet/Meters) PSI Catalog Number STEP 10 0/0 255/78 110 5/19 228/69 99 10/38 170/52 74 12.5/47 120/37 52 STEP20 0/0 180/55 78 7.5/28 160/49 69 15/57 135/41 58 20/76 115/35 50 25/95 75/23 32 STEP30-OS221 & STEP30-05121 0/0 102/31 44 8/30 100/30 43 16/61 97/30 42 24/91 84/26 36 30/114 68/21 29 36/136 47/14 20 STEP30-10221 0/0 171/S2 74 8/30 166/S1 72 16/61 162/49 70 24/91 140/43 61 30/114 114/35 49 36/136 78/24 34 STEP30-15221 0/0 206/63 89 8/30 203/62 88 16/61 199/61 86 24/91 176/54 76 30/114 146/45 63 36/136 101/31 44 STEPSO-10221 0/0 90/27 39 10/38 86/26 37 20/76 83/25 36 30/114 79/24 34 40/152 71122 31 50/190 62/19 27 60/227 49/15 21 70/265 27/8 12 STEPSO-15221 0/0 120/37 52 10/38 115/35 50 20/76 110/34 48 30/114 104/32 4S 40/152 95/29 41 50/190 82/25 35 60/227 65/20 28 70/265 36/11 16 Customer Service: (888) 782-7483 ■ Fax Orders: (800) 426-9446 ■ www.pumps.com ■ Pentair Water ■ Delavan, WI 53115 USA ■ S5594SES Operation and Maintenance E-Z Treat Sand/Media Filter 1-703-7534770 E-Z Set Company requires regular inspection and maintenance of the E-Z Treat Re - Circulating Sand/Media Filter, as a condition of purchase and ongoing operation compliance. The mandatory service contract will include a performance based system inspection. The service provider must be trained and certified by E-Z Set Company. All inspection and maintenance reports must be forward, along with any additional documentation, to E-Z Set Company, the local authorized E-Z Treat Dealer and all required or designated regulatory agencies. The following is a list of the routine maintenance and cleaning procedures that are required by E-Z Set Company. Failure to perform the required system maintenance could reduce the desired performance of the system and will void the warranty on the E-Z Treat Sand Filter System. Semi-annual inspections the first year of operations and annual inspections thereafter. E-Z Treat Re -Circulating Sand/Media Filter Model # 0600 Capacity of Model #0600 - 700 GPD Residential Strength Effluent E-Z Treat Re -Circulating Sand/Media Filter Model # 1200 Capacity of Model #1200 —1400 GPD Residential Strength Effluent Septic Tank The septic and re -circulation tank shall be inspected annually to ensure they are operating properly. Remove the access covers over the tank openings to perform the inspection. 1. Verify the lid and riser assemblies are watertight. Check for any damaged, water weeping marks, holes or cracks. The system must remain watertight to perform properly. 2. Remove, clean and replace the outlet effluent filter in accordance with the instructions provided by the effluent filter manufacturer. 3. Inspect the liquid level in the septic tank, it should be level with the bottom of the outlet pipe. 4. Inspect the effluent and scum layers in the septic tank. Look for oil or any other contaminants that are not normal. 5. Verify the tank has received its scheduled pumping and cleaning. Check the solids layer in each of the tanks. If the solids layer is excessive have the tank pumped. Re -Circulation Tank The re -circulation tank shall be inspected annually to ensure it is operating properly. Remove the access covers over the tank openings to perform the inspection. Verify that the lid and riser assemblies are watertight. Check for any damaged, water weeping marks, holes or cracks, the system must remain watertight to perform properly. Operation and Maintenance E-Z Treat Sand/Media Filter Re -Circulation Tank 1. Inspect the liquid level in the re -circulation tank, it should be level with the bottom of the outlet pipe. 2. At initial Starting -Up of the system remove the end caps from the spray manifold. Operate the re-circ pump by turning the pump control to the "Hand - On" position. Let the pump run for 1 (one) minute the turn the pump control to the "Off' position repeat this procedure three times to flush any construction debris such as dirt or pipe shavings from the spray manifold. Replace the end caps "Hand Tight" do not use wrenches or pliers. Re -set the pump control selector switch to the "Auto" position. 3. Inspect the float by-pass valve. Manually start the re -circulation pump and observe the float ball valve, the ball should drop as the liquid in the re- circulation tank drops the effluent returning from the sand filter pod should flow back into the re -circulation tank and should not flow out the discharge pipe. 4. Verify that all the re -circulation pump floats are in good condition, properly secured to the float bracket and are able to move freely within the re- circulation tank. 5. Observe the system as it re -circulates. Visually verify all flows thru the system. Control Panel/Pumps/Alarms 1. Check the functions of the E-Z Treat Sand Filter control panel. Control: Main Control "On/Off Switch" Function: Turns Power ON or OFF Control: System Setting,Switch "Manual ON" and "Auto On" Function: "Manual ON" overrides all Float Switches and Time Clock Switches "Auto On" allows for normal operations dictated by the Time Clock and Float Switches. Control: Time Clock "Minutes On" and "Minutes Off' Function: Controls run time of re -circulation pump i.e. GPD re -circulated thru media Control: High and Low Water Alarm "Alarm On", "Alarm Auto" and "Alarm Silence". Function: "Alarm On" will manually turn on the audio/visual alarms. "Alarm Auto" is the normal operational setting and "Alarm Silence" turns off the alarms. 2 Operation and Maintenance E-Z Treat Sand/Media Filter 1-703-7534770 Check re -circulation pump. Place the system in the manual mode by turning the re- circulation pump switch to "ON". The re -circulation pump should begin to supply effluent to the spray nozzles in the treatment pod. 2. Check the voltage and motor amp draw and record the readings. If the readings are beyond the limits of the NEC recommendations, have an electrician check the main service line feeding the system control panel. 3. Place the system in the normal operating mode by turning the re -circulation pump switch to "AUTO". Verify the Time Clock ON/OFF settings are the same as set at system start-up. Record those timer settings in the system log. 4. Verify the accuracy of the system ON/OFF Timer Clock. To accomplish this use a stop watch and verify the length of time the re -circulation pump is OFF then verify the time the re -circulation pump is ON, those times should match the ON/OFF Timer Clock settings in the control panel. Re -Circulation Pump Time Clock Window Will Display OFF Sec., Min. or Hr. Light Will Burn Green to Indicate Re- Rotate OFF Dial Until Min. Appears in Window Circulation Pump is OFF Light Will Burn RED to Indicate Re -Circulation Pump is ON — Rotate Dial to Desired Minutes ON OFF Dial Seconds, Minutes or Hours Window Will Display ON Sec., Min. or Hr. Rotate ON Dial Until Min. Appears in Windo ON Dial Seconds, Minutes or Hours Rotate Dial to Desired Minutes OFF Clock Face Dial Will Change the Clock Face From a Maximum Time of 1.5 Units to a Maximum of 30 Units. Always Set the Clock Face to 30. 5. Confirm the operation of the visual and audible "HIGH" and "LOW" water alarms. The control has an alarm switch clearly marked Alarm "ON", Alarm "Auto" and Alarm "Silence" Place the Alarm Switch in the "ON" position, you will hear a loud buzzer and see a red flashing light. Move the switch to the Alarm" Silence" position the red light and buzzer will go dormant. 6. Once the alarms have been triggered return all settings to their original position of Alarm "AUTO" (If applicable, verify the operation of the telemetry unit by checking the alarm notations on the website.) 7. Verify the floats are operational by manually raising and lowering the floats to simulate the systems normal operation. Verify proper operation of "High Level Float" by lifting the float while the system Timer Clock is in the "OFF" time mode, the re -circulation pump should turn on over riding the "OFF" timer, the Visual and Audible alarms should activate. Return the float to its normal position the re -circulation pump will turn off. Reset the alarms and manually lower the "Low Water Float" with Timer Clock in the "ON' mode, the re -circulation pump will turn off and the visual/audible alarms will activate. Return the float to the normal position and the re -circulation pump will run. Reset the Alarms. 8. Properly re -install and secure all tank accesses! E-Z Treat Sand/Media Filter The E-Z Treat Sand Filter should be inspected to ensure it is operating properly. Remove the pod cover to perform this inspection. Take a grab sample of the effluent check for: a. Odor, the effluent may have an earthy or musty smell there should be no strong or offensive odors present. b. Color, the effluent should be clear and absent of any color. c. Solids, there should be no visible suspended solids d. Solids, let sample set for 15 minutes, there should be no visible settling of solids. e. Test the pH, it should measure 6.9 to 7.5 If there is odor, color or solids clean the media. If the Ph is below 6.9 reduce the re -circulation rate by increasing to "Off' time on the Time Clock Control. Recheck the Ph in 90 days. 2. Observe the spray distribution nozzles during operation. If a nozzle appears to be clogged or if the spray pattern is not uniform, remove the nozzle and clean the nozzle using a pipe stem cleaning brush. 4 Operation and Maintenance E-Z Treat Sand/Media Filter 1-703-7534770 3. Record the pressure reading on the distribution manifold gauge. Compare that pressure to the pressure recorded at the previous inspection. The pressure should read 18 to 27 PSI. a. Verify the pressure gauge on the spray distribution manifold is performing properly. b. Verify the flow rate at the spray nozzles (it should be 1.75 to 2 GPM). c. Verify the re -circulation pump is the same make and model pump that was specified for the original installation. d. Verify the re -circulation pump is performing in accordance to the pump manufacturers' specifications including amp draw and flows at specific pressures. e. If the pressure is above the prior recording or above the start up setting, open the ends of the distribution manifold lines, manually start the re -circulation pump and allow it to run for 5 minutes. This should flush out the spray distribution lines. If the pressure remains too high, after cleaning the spray nozzles and flushing the spray distribution lines, adjust the pressure to the desired PSI using the ball valve on the main spray distribution supply line. f. If the pressure/flow is too low check for cracks, breaks or obstructions in the main distribution supply line. 4. Verify the treatment pod is properly draining by looking down the pod side wall vents, there should be no standing water, the bottom of the pod should be visible. 5. Visually inspect the surface of the treatment media for: a. Holes, tears, loose seams b. Foreign material c. Black color on media (media should have light brown tint) d. Excessive bio mat growth e. Ponding f. Clumping of the media. Note: If any of these conditions exist the media needs to be cleaned or replaced. 6. Lift the corners of the media mattress and visually inspect the sides and bottom of the treatment media for: a. Holes, tears, loose seams b. Black color on media (media should have light brown tint) c. Excessive bio mat growth d. Clumping of the media. Note: If any of these conditions exist the media needs to be cleaned or replaced. 5 Operation and Maintenance Cleaning the Filter Media E-Z Treat Sand/Media Filter 1-703-753-4770 Depending upon influent strength and influent volumes, excessive biological growth can accumulate inside and on the surface of the media filter after 3 to 5 years of use. Cleaning of the media is a very simple and easy 10 step process. Step One: Turn off power to any discharge pump. Step Two: Remove the treatment pod cover and remove the spray distribution manifold. Step Three: Connect wash down hose to the main spray distribution supply line. Step Four: Manually turn on the re -circulation pump. Step Five: Pressure wash the surface of the media mattress, the wash water will drain into the re -circulation tank and will be re -used as wash water. Step Six: Roll the media mattress and wash the sides and bottom of the media mattress. Step Seven: After the media is completely cleaned properly place the media mattress in the treatment pod. Step Eight: Re -Install the spray distribution manifold. Step Nine: Pump out and clean the Re -Circulation Tank removing all the wash down water. Pump out the Septic Tank. Step Ten: Turn on power to discharge system and return the treatment system from Manual mode to Automatic mode. 71 Operation and Maintenance Replacement of Media Mattress E-Z Treat Sand/Media Filter 1-703-7534770 If the Filter Media is exposed to excessive concentrations of petroleum products, paints, glues, waxes etc. it will become necessary to replace the media. The replacement process it is a very fast and simple. Removing the media mattress should be performed by service agents that are trained and certified by E-Z Set. Step One: Turn off power to recirculation pump, discharge pump and controls. Step Two: Pump the Septic tank and re -circulation tank to assure continued service by residence during the replacement. Step Three: Remove the spray distribution manifold. Step Four: Lift the media mattress out of the filter pod. Step Five: Place the mattress into the fiberglass Transport Container provided by E-Z Set Company. The Transport container is easily hauled in a pickup truck or on a light duty trailer. Step Six: Install new Filter Media and replace distribution manifold. Step Seven: Reset all system control settings to "AUTO" and turn the main power switch to the ON position. Once the mattress is returned to E-Z Set the material will be sent to the nearest re -cycler to be reprocessed and sold on the open styrene market, disposal of this product is easy and economical. 7 Attention System Owner and Users Caution: Do Not Open or Enter Any System Components for Any Reason. If a Problem Exists or You have Questions about Your System, Call Your Certified Services Provider. Once the E-Z Treat System is installed, a post -construction conference is recommended. This is an opportunity to familiarize the owner with the system. No attempt should be made to adjust any component of this system except by a Certified Operator. The E-Z Treat Sand/Media Filter System allows the homeowner to receive a high quality, reliable and economical wastewater system that protects the environment. As with any onsite wastewater treatment system, the homeowner should be familiar with basic guidelines which help the system achieve repetitive, reliable performance. Please do not hesitate to contact your certified operator or E-Z Set Company with any questions, concerns or comments about your E-Z Treat Sand/Media Filter. Users of the System..... Remember! To assure proper performance of your E-Z Treat Re -Circulating Sand/Media Filter, you should avoid disposing of the following products into your septic tank: • Oil & Grease (kitchen waste) • Water Softener backwash • Wax & resins • Petroleum Products • Paint & Paint Solvents • Pesticides • Condoms & sanitary napkins • Toxic substances (Liquid Plumber, Drano, etc.) • Non -Biodegradable products (cigarette butts, antibacterial wipes, etc.) • Any kind of septic tank additive (Rid-X, etc.) E-Z TREAT Sand/Media Filter 703-753-4770 Owner's Guidelines Attention System Owners and Users Remember, As The Owner..... • Keep heavy loads and traffic off of your onsite system components and drainfield • Never drive cars or trucks within 10 feet of any system access lids • Landscaping or future building projects should be planned with the drainfield and drainfield repair area in mind. • Do not shovel or blow snow on top of your onsite wastewater system. This will temporarily limit access to your system and could overload and damage the system. • Makes sure drainage from the house or around the property is carried away from your onsite system. • DO NOT OPEN OR ENTER ANY OF THE TREATMENT SYSTEM TANKS, SEPTIC GASSES CAN BE TOXIC, CAUSING SERIOUS INJURY OR DEATH! 6 E-Z Treat UV 703-753-4770 Cleaning Your UV Light System Caution: Do Not Run UV Lamps Dry, Fill UV Housing With Water/Effluent Before Turning On Power. It is recommended the quartz tubes, housing the UV Lamps, be cleaned at least every 12 months. Caution: Always turn off the power to the UV system before any maintenance is performed. Use extreme care when handling the fragile UV lamp assembly. Step One: Turn Off power to the UV System! Step Two: Disconnect the yellow, screw on, power cord going to the UV Lamp assembly. Step Three: Disconnect the UV Lamp assembly by lifting upward on the two metal locking levers located just below the UV Lamp power cord connection. Step Four: Lift the UV Lamp assembly upward until it is clear of the UV System housing. Step Five: Using a clean, damp sponge or clean soft cloth, wipe all residue from the quartz tube. Clean stubborn dirty areas with a liquid glass cleaning product. Caution: Do Not Scrape or Use Scouring Pads, this may scratch the quartz tube and alter the performance of the UV system. Step Six: Visually inspect each quartz tube for cracks or breaks; replace the UV Lamp assemblies if they are cracked, scratched or broken. Step Seven: Insert the UV Lamp assembly into the UV housing and lock in place by pushing down on the metal locking levers. Use Caution to apply even pressure on both locking levers at the same time. Step Eight: Push the yellow power cords onto the UV Lamp assembly, take care to align the two pins on the bulb with the two pin holes on the power cord, secure the power cords by tightening the threaded ring on the power cords to the threads on the UV Lamp assembly. Caution: (Finger Tight Only) Do Not use pliers, wrenches, etc. to perform this maintenance. Step Nine: Turn On Power to the UV System. 39 UV Intensity Calculations Lamp Model: GPH793T5L Length of Lamp = 31 7/32 inches Diameter of Lamp tube = 13/15 inches Lamp 254 nm UV Output, Po 12.8 W Power Reduction Factor = 75% Nom. Lamp Output, P = 9,600,000 uW Chamber Diameter = 6 inches Nominal Intensity = Absorption Coeff., Kab = Min. Effective Intensity = Design Dosage = Exposure Length = Chamber Volume = Lamp Volume = Net Fluid Volume = Req'd Retention Time = Max Flow Rate = 631,358 uW/cmz 0.75 cm-' 4,749 uW/cmz 50,000 uW-s/cmz 29 3/32 inches Ster-L-RayTM Ultraviolet Germicidal Lamp 22 mm sleeve outer diameter (after 100 hours of operation) (after 20,000 hours of operation) (after 20,000 hours of operation) (at lamp side of waste stream) (Fluid required to be < 0.40/cm per VDH SCAT regulations for wastewater which is exceeded for conservative design) (at outer wall of chamber using Beer -Lambert Law) (per VDH SCAT regulations) (length of lamp less 2 1/8") 3.561 gallons 0.074 gallons 3.487 gallons 10.5 seconds 19.9 gpm / chamber