HomeMy WebLinkAboutNCC190131_ESC Approval Submitted_20190430ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. DANIEL SMITH
Interim Director
CDM Smith, Inc.
ATTN: Mr. Kevin C. Irby
5400 Glenwood Ave. - Suite 400
Raleigh, N.C. 27612
NORTH CAROLINA
Environmental Quality
April 16, 2019
LETTER OF APPROVAL
RE: Project Name: Buncombe CO LF/E Canton LF/Old Chandler LF
Acres Approved: 3.6
Project ID: BUNCO-2019-014
County: Buncombe
City: Candler
Address: Little Piney Mountain Road
River Basin: French Broad
Stream Classification: Unnamed Tributary to South Hominy Creek, C, Trout
Submitted By: Mr. Robert C. Nagel III, P.E.
Date Originally Received by LQS: 12 March 2019
Date Revision Received by LQS: 15 April 2019
Plan Type: Remedial Action
Dear Mr. Irby,
This office has reviewed the subject erosion and sedimentation control plan. We find the
plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of
Approval must be posted at the job site. This plan shall expire three (3) years following the
date of approval, if no land disturbing activity has been undertaken, as is required by Title
15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the
NCGO10000 Construction Stormwater General Permit. This form MUST be submitted prior
to the commencement of any land disturbing activity on the above named project. The NOI
form may be accessed at deq.nc.gov/NCGO1. Please direct questions about the NOI form to
Annette Lucas atAnnette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After
you submit a complete and correct NOI Form, a COC will be emailed to you within three
business days. Initially, DEMLR will not charge a fee for coverage under the NCGO1 permit.
However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent
to the DEMLR Stormwater Central Office staff in Raleigh.
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778
rvoarH cnaaurvn
o:v�nmemmeomra�m�oui a�axn 828.296.4500
Letter of Approval
Mr. Kevin C. Irby
April 16, 2019
Page 2 of 2
Title 15A NCAC 48.0118(a) and the NCG01 permit require that the following
documentation be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days. Please note that these records
shall be maintained until permanent groundcover has been established as required by the
G.S.113A-54.1}.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
commencement of this project, the erosion and sedimentation control plan is inadequate to
meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina
General Statute 113A-51 through 66), this office may require revisions to the plan and
implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal
and State water quality laws, regulations, and rules. In addition, local city or county
ordinances or rules may also apply to this land -disturbing activity. This approval does not
supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility Form, which you provided. You are requested to file an
amended form if there is any change in the information included on the form. In addition, it
would be helpful if you notify this office of the proposed starting date for this project.
Please notify us if you plan to have a preconstruction conference.
Your cooperation is appreciated.
Sincerely, /
As ' tant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
NCG01 Fact Sheet
ec: Mr. Robert G. Nagel III, P.E., nagelrg(@cdmsmith.com
Mr. Aaron Weispfenning, P.E., weispfenningam@cdmsmith.com