HomeMy WebLinkAbout310271_30 day POA_20180408PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number. 31-271 County: Duplin
Facility Name: CJK Farms
Certified Operator Name: Don LaCoe Operator Number. 16377
1. Current liquid level(s) in Inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
Lagoon Name/ID: 1 2
Spillway(Y or N): N N
Level(Inches): 18 33
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations cif one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste
to be pumped and hauled Is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
Information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered In the facility's CAWMP.
Operation will be partially or fully depopulated.
'Attach a complete schedule with corresponding animal units and dates fro depopulation
'If animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earnest possible date to begin land application of waste: as conditions permit
I hereby certify that 1 have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the Information Is
accurate and correct.
Don LaCoe Phone: 910-293-5572
Owner n�r (print)
Q Date: 4/8=18
Faclllty Owner/Manager (signature)
a
It. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID, Lagoon'! line m = 530.8 lb PAN
2. Structure ID: Lagoon 2 line m = lb PAN
3. Structure ID: line m = lb PAN
4. Structure ID: line m = lb PAN
5. Structure ID:
6. Structure ID
line m = lb PAN
line m = lb PAN
n.lines 1+2+3+4+6+6= 630.8lbPAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNnT RF Aaal iFn n11RINr_ TUIS an nev aFvrnn
o. tract #
p field #
q. crop
r. acres
s. rememing IRR
2 PAN balance
(lblacm)
L TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x s
u. appimilon vnndow'
2238
1
Bermuda
3.20
225.00
720.0
March - October
2238
2
Bermuda
3.90
225.00
877.5
March -October
2238
3
Bermuda
320
225.00
720.0
March - October
2238
4
Bermuda
2.10
225.00
472.5
March -October
State current crop enoing application date or next crop application beginning dale for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 2790.0 Ib. PAN
IV. FACILITY'S PDA OVERALL PAN BALANCE
w. Total PAN to be land applied (Ilne n from section 11) = 630.8 Ib. PAN
PoA (30 Day) 2/21100
J
x. Crop's remaining PAN balance (line v from section III) = 2790.0 Ib. PAN
y. Overall PAN balance (w -x) _ -2259 lb. PAN
Line y must show as a deficit If line y does not show as a deficit, list course of action here Including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
Waste transfer forms on this farm show water was being transferred to the biggest lagoon however it kept
raining.
PoA (30 Day) 2121/00
V
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID). 1 Lagoon 1
2. Current liquid volume in 25 yrJ24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (Inches in red zone) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
18.0 inches
19.5 Inches
1.5 Inches
32015 fe
29934 gallons
90 days
g. volume of waste produced according to structural design 32309 ft3
h. current herd # 1960 certified herd # 1960
actual waste produced = current herd # x line g =
certified herd #
I. volume of wash water according to structural design
J. excess rainfall over evaporation according to design
k. (lines h + I + j) x 7.48 x 30 daysiline f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 4/11/2018
m. ((fines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21/00
32309 W
ft3
ft3
18875 ft3
127120 gallons
3.38 Ibs/1000 gal.
530.8 Ibs. PAN