Loading...
HomeMy WebLinkAbout310271_30 day POA_20180408PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number. 31-271 County: Duplin Facility Name: CJK Farms Certified Operator Name: Don LaCoe Operator Number. 16377 1. Current liquid level(s) in Inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: 1 2 Spillway(Y or N): N N Level(Inches): 18 33 2. Check all applicable items Liquid level is within the designed structural freeboard elevations cif one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled Is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop Information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered In the facility's CAWMP. Operation will be partially or fully depopulated. 'Attach a complete schedule with corresponding animal units and dates fro depopulation 'If animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earnest possible date to begin land application of waste: as conditions permit I hereby certify that 1 have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the Information Is accurate and correct. Don LaCoe Phone: 910-293-5572 Owner n�r (print) Q Date: 4/8=18 Faclllty Owner/Manager (signature) a It. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID, Lagoon'! line m = 530.8 lb PAN 2. Structure ID: Lagoon 2 line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: 6. Structure ID line m = lb PAN line m = lb PAN n.lines 1+2+3+4+6+6= 630.8lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNnT RF Aaal iFn n11RINr_ TUIS an nev aFvrnn o. tract # p field # q. crop r. acres s. rememing IRR 2 PAN balance (lblacm) L TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. appimilon vnndow' 2238 1 Bermuda 3.20 225.00 720.0 March - October 2238 2 Bermuda 3.90 225.00 877.5 March -October 2238 3 Bermuda 320 225.00 720.0 March - October 2238 4 Bermuda 2.10 225.00 472.5 March -October State current crop enoing application date or next crop application beginning dale for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 2790.0 Ib. PAN IV. FACILITY'S PDA OVERALL PAN BALANCE w. Total PAN to be land applied (Ilne n from section 11) = 630.8 Ib. PAN PoA (30 Day) 2/21100 J x. Crop's remaining PAN balance (line v from section III) = 2790.0 Ib. PAN y. Overall PAN balance (w -x) _ -2259 lb. PAN Line y must show as a deficit If line y does not show as a deficit, list course of action here Including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the Waste transfer forms on this farm show water was being transferred to the biggest lagoon however it kept raining. PoA (30 Day) 2121/00 V PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD 1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID). 1 Lagoon 1 2. Current liquid volume in 25 yrJ24 hr. storm storage & structural freeboard a. current liquid level according to marker b designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (Inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 18.0 inches 19.5 Inches 1.5 Inches 32015 fe 29934 gallons 90 days g. volume of waste produced according to structural design 32309 ft3 h. current herd # 1960 certified herd # 1960 actual waste produced = current herd # x line g = certified herd # I. volume of wash water according to structural design J. excess rainfall over evaporation according to design k. (lines h + I + j) x 7.48 x 30 daysiline f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 4/11/2018 m. ((fines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 32309 W ft3 ft3 18875 ft3 127120 gallons 3.38 Ibs/1000 gal. 530.8 Ibs. PAN