Loading...
HomeMy WebLinkAbout20061592 Ver 2_Telephone Log_200611141~I~)~,1-14-2006 TUE 09 ~ 07 AM DENR RRO FAX P10, 19195714718 P, 01 State of North Carolina Department of Environment ~ and Natural Resources Raleigh Regional Office ~~ ~^^^~~ Di~visian ofLand Resources ~~~~~~ Land (duality Section NORTH VYROL.MA ~]~'AKYYM~ntT OP' ~PlVIRONM6NT AND NATURAL Rk*SCU{=C~w~ TELEPHONE LOG Date: 1/1 / 'T'ime. '/:30i Call was Placed /Received /Returned Project: Cameron Associates 2 Project I.D.: VANCE-20{?7~0~13. z5 z- ~ 3 2.~ 9 Conversation with: Charlie Keeter Telephone No.: ~. Affiliation: Power E ui ment Plus - Content of conversation: ~ Ag~*_~;ng Permit approval issued on 11/11/06 Closer evaluation of soil survey shawg feature crossing northeast of what aynears to be the powerline easement an the prjn~~r y A stream determinatian will need to be made thrauvh NC Division of Water Quality. This should be made prior to anX disturbance in that area of the project inc di g ale_arin~The erosion and sediment contml Alan is still found to be adequate but prior determination/apnrovai from DWO should be completed to avoid imuaet tQ stream. The determination may call for a rcyised plan to be submitted if a stream is determined to be there Please understand that the ,previQUS p,~oiec_~ C~tp_eron Associates (first submiiisll is still an Iti~arian Hold until information from DWQ i,~received and has no influence an Garoeron A~aM;Ates 2 Flease call if there are fu_*t1+er auegtians Thanks Cc: Michael Horan„ Gabi Jones, Completed by: Karvra Pagoau Page 1 of 1