Loading...
HomeMy WebLinkAboutWM0301003_Final Permit_20190402ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Director Mr. Morris Kaplan (via email) Kaplan Residential, LLC 1111 Kane Concourse, Suite 302 Bay Harbor Islands, FL 33154 Dear Mr. Kaplan, NORTH CAROLINA Environmental Quality April 2, 2019 RE: Monitoring Well Construction Permit Permit #WM0301003 504 McLean Street, Belmont Gaston County In accordance with your completed application received on April 1, 2019, we are forwarding herewith Monitoring Well Construction Permit Numbered WM0301003 and issued for the construction of four monitoring wells located near the subject site in Belmont, Gaston County. This Permit will be effective for one year from the date of issuance and shall be subject to the conditions and limitations as specified therein. Should you have any questions, please contact Edward Watson at (704) 663-1699 ext. 2198, or by email at edward.watson@ncdenr.gov. Sincerely, DocuSigned by: A*w1v H P44, 4 F161 FB69A2D84A3... Andrew H. Pitner, P.G., Assistant Regional Supervisor Mooresville Regional Office Water Quality Regional Operations Section Division of Water Resources CC: WQROS, Central Office (via Laserfiche) Chris Ward, ESP Associates, Inc. (via email) Environmental Drilling and Probing Services, LLC (via email) D Q �� North Carolina Department of Environmental Quality I Division of Water Resources Mooresville Regional Office 1 610 East Center Avenue, Suite 301 1 Mooresville, North Carolina 28115 NOAn-icJwauNn i nwm,em of eem—woviRv 704,663.1699 NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF WATER RESOURCES PERMIT FOR THE CONSTRUCTION OF A MONITORING WELL In accordance with the provisions of Article 7, Chapter 87, North Carolina General Statutes, and other applicable Laws, Rules and Regulations. PERMISSION IS HEREBY GRANTED TO Kaplan Residential, LLC (ESP Associates, Inc. as Agent) FOR THE CONSTRUCTION OF A MONITOR WELL SYSTEM consisting of four monitoring wells owned by Kaplan Residential, LLC near the subject site, Belmont, Gaston County. This Permit is issued in accordance with the applications received on April 1, 2019, in conformity with specifications and supporting data, all of which are filed with the Department of Environmental Quality and are considered integral parts of this Permit. This Permit is for well construction only, and does not waive any provision or requirement of any other applicable law or regulation. Construction of any well under this Permit shall be in strict compliance with the North Carolina Well Construction Regulations and Standards (15A NCAC 02C .0100), and other State and Local Laws and regulations pertaining to well construction. If any requirements or limitations specified in this Permit are unacceptable, you have a right to an adjudicatory hearing upon written request within 30 days of receipt of this Permit. The request must be in the form of a written petition conforming to Chapter 150B of the North Carolina General Statutes and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, North Carolina 27699-6714. Unless such a demand is made, this Permit is final and binding. This Permit will be effective for one year from the date of its issuance and shall be subject to other specified conditions, limitations, or exceptions as follows: 1. Issuance of this Permit does not obligate reimbursement from State trust funds, if these wells are being installed as part of an investigation for contamination from an underground storage tank or dry cleaner incident. 2. Issuance of this Permit does not supersede any other agreement, permit, or requirement issued by another agency. 3. The well(s) shall be located and constructed as shown on the attachments submitted as part of the Permit application. 4. Each well shall have a Well Contractor Identification Plate in accordance with 15A NCAC 02C .0108(o). 5. Well construction records (GW-1) for each well shall be submitted to the Division of Water Resources' Information Processing Unit within 30 days of the well completion. 6. When the well is discontinued or abandoned, it shall be abandoned in accordance with 15A NCAC 02C .0113 and a well abandonment record (GW-30) shall be submitted to the Division of Water Resources' Information Processing Unit within 30 days of the well abandonment. 7. Adequate permits shall be obtained from Gaston County Environmental Health. Permit issued the 2nd day of April, 2019 FOR THE NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DocuSigned by: F161 FB69A2D84A3... Andrew H. Pitner, P.G., Assistant Regional Supervisor Division of Water Resources By Authority of the Environmental Management Commission Permit No. # WM0301003