Loading...
HomeMy WebLinkAbout20180514 Ver 1_NWP 3 verification_20180604Carpenter, Kristi From: Hair, Sarah E CIV CESAW CESAD (US) <Sarah.E.Hair@usace.army.mil> Sent: Monday, June 04, 2018 5:33 PM To: Rerko, James J Cc: Steenhuis, Joanne Subject: [External] NWP 3 verification/ NC 83/1-eith Creek Attachments: NWP 3 verification -bridge 28-signed.pdf, bridge 28_ MRTFORM-signed.pdf, 17BP.R.6.106_770028_Permit Drawings_022718.pdf, 2017NWP03.pdf CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to Report Spa m.<mai Ito: report. spa m@nc.gov> Jim, Attached please find signed copies of the NWP 3 verification letter, MRT FORM, plans and the NWP 3 for the following project: Corps Action ID: SAW-2018-00756 Project Name: bridge 28/NC 83 County: Robeson This email serves as official notice. A paper copy will not be mailed. Please let me know if you have any questions. Thanks! Liz Hair Regulatory Project Manager Wilmington District US Army Corps of Engineers 69 Darlington Avenue Wilmington, NC 28403 Sarah.e.hair@usace.army.mil 910-251-4049 1