Loading...
HomeMy WebLinkAbout20150280 Ver 2_CAMA Application_20190425Coastal Management ENVIRONMENTAL QUALITY MEMORANDUM DATE: April 9, 2019 TO: Gregg Bodnar Q THRU: Roy Brownlow / FROM: Brad Connell 9c SUBJECT: Camp Don Lee and State Permit # 56-15 ROY COOPER Gove,mor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director Please find correspondence enclosed dated April 6, 2019 from Bobby Prescott Marine Construction, LLC requesting a permit modification. State Permit #56-15 was issued for the construction of shoreline stabilization adjacent to the Neuse River, Pamlico County. The permit expires on December 31, 2021. The request by the permittee is to modify the existing permit to include 360 more feet of vinyl bulkhead. Camp Don Lee sustained a significant increase in shoreline erosion in the wake of Hurricane Florence and wishes to reinforce the shoreline with bulkhead on the landward side of the existing rip rap revetment located in front of the existing Nature Center at the camp. By copy of this memo, the DCM is requesting that the DEMLR and DWR provide any comment that your agency may have on the proposed project to Gregg Bodnar, of DCM's Morehead City office, within 14 days of the receipt of this memo. A check in the amount of $100 (#7350) has been received in order to process the request. Enclosure Cc: Chris Pullinger, DWR Carl Dunn, DEMLR Skip Lee, Pamlico County LPO Nothing Compares�.� State of North Carolina I Environmental Quality I Coastal Management 400 Commerce Ave I Morehead City, NC 28557 252 808 2808 T B. PRESCOTT MARINE CONSTRUCT[Omq LLC NC MARINE CONTRACTOR #67655 T� April 6, 2019 Mr. Brad Connell Division of Environmental Quality 400 Commerce Dr. Morehead City, NC 28557 Dear Mr. Connell, I would like to request a modification for Major CAMA Permit # 56-15 on behalf of Camp Don Lee. The original permit included two Phases. We are proposing an additional 360' of Vinyl Bulkhead to stabilize the shoreline that had previously not been included. The vinyl bulkhead will be constructed of Vinyl Sheets 12' in length. The wall will be a Navy System including a double water system with a piling driven on the water ward side of the wall. The Bulkhead will also include a Deadman Anchor System. Please feel free to contact me if any additional information is required. Enclosed is a $100 Processing Fee. Sincerely, / Brandi Prescott Robertson Project Coordinator B. Prescott Marine Construction, LLC APR 0 0 2019 PO BOX 874 • ORIENTAL, NC 28571 • PHONE: 282-249-0149 -FAX: 252-249-088[)CM-M H D CITE" Allo QHW-#VOQ 6101 go add a3AITy 14,400' Neuse. River Width Y U O / 0ICD Z cc w m z c 0 cr m Y a 1 � a C ~ Nit Cf z! 1 q fJ CL 0) d� Tei ' e m £On ULA Z cc w m z c 0 cr m Y a m a v C N Nit Cf m ID' - 0a2aai 0 a. 2 CL 0) Z cc w m z d D AIIO C➢WYI-MNOa . 610Z go Uv i i.1 c E N +• C .� ro U fA _U O 00 O i 0 y (d �> U 0 LN7 E O LL d U v N d CL o` c m m CL `o 45 0 Q CL m v o U d T o a c M d N d IL J] E'INI'D