HomeMy WebLinkAbout20150280 Ver 2_CAMA Application_20190425Coastal Management
ENVIRONMENTAL QUALITY
MEMORANDUM
DATE: April 9, 2019
TO: Gregg Bodnar Q
THRU: Roy Brownlow /
FROM: Brad Connell 9c
SUBJECT: Camp Don Lee and State Permit # 56-15
ROY COOPER
Gove,mor
MICHAEL S. REGAN
Secretary
BRAXTON C. DAVIS
Director
Please find correspondence enclosed dated April 6, 2019 from Bobby Prescott Marine Construction, LLC
requesting a permit modification. State Permit #56-15 was issued for the construction of shoreline stabilization
adjacent to the Neuse River, Pamlico County. The permit expires on December 31, 2021.
The request by the permittee is to modify the existing permit to include 360 more feet of vinyl bulkhead. Camp
Don Lee sustained a significant increase in shoreline erosion in the wake of Hurricane Florence and wishes to
reinforce the shoreline with bulkhead on the landward side of the existing rip rap revetment located in front of
the existing Nature Center at the camp.
By copy of this memo, the DCM is requesting that the DEMLR and DWR provide any comment that your
agency may have on the proposed project to Gregg Bodnar, of DCM's Morehead City office, within 14 days of
the receipt of this memo. A check in the amount of $100 (#7350) has been received in order to process the
request.
Enclosure
Cc: Chris Pullinger, DWR
Carl Dunn, DEMLR
Skip Lee, Pamlico County LPO
Nothing Compares�.�
State of North Carolina I Environmental Quality I Coastal Management
400 Commerce Ave I Morehead City, NC 28557
252 808 2808 T
B. PRESCOTT MARINE CONSTRUCT[Omq LLC
NC MARINE CONTRACTOR #67655
T�
April 6, 2019
Mr. Brad Connell
Division of Environmental Quality
400 Commerce Dr.
Morehead City, NC 28557
Dear Mr. Connell,
I would like to request a modification for Major CAMA Permit # 56-15 on behalf of
Camp Don Lee.
The original permit included two Phases. We are proposing an additional 360' of Vinyl
Bulkhead to stabilize the shoreline that had previously not been included.
The vinyl bulkhead will be constructed of Vinyl Sheets 12' in length. The wall will be a
Navy System including a double water system with a piling driven on the water ward side
of the wall. The Bulkhead will also include a Deadman Anchor System.
Please feel free to contact me if any additional information is required.
Enclosed is a $100 Processing Fee.
Sincerely, /
Brandi Prescott Robertson
Project Coordinator
B. Prescott Marine Construction, LLC
APR 0 0 2019
PO BOX 874 • ORIENTAL, NC 28571 • PHONE: 282-249-0149 -FAX: 252-249-088[)CM-M H D CITE"
Allo QHW-#VOQ
6101 go add
a3AITy
14,400' Neuse. River Width
Y
U
O
/ 0ICD
Z
cc
w
m
z
c
0
cr
m
Y
a
1 �
a
C
~
Nit
Cf
z!
1 q fJ
CL 0)
d� Tei
'
e
m
£On
ULA
Z
cc
w
m
z
c
0
cr
m
Y
a
m
a
v
C N
Nit
Cf
m ID' -
0a2aai
0 a. 2
CL 0)
Z
cc
w
m
z
d
D
AIIO C➢WYI-MNOa .
610Z go Uv
i
i.1
c
E
N +•
C .�
ro U
fA _U
O
00
O i
0
y (d
�> U
0
LN7
E
O
LL
d
U
v
N
d
CL
o`
c
m
m
CL
`o
45
0
Q
CL
m
v
o
U
d
T
o
a
c
M
d
N
d
IL
J]
E'INI'D