Loading...
HomeMy WebLinkAbout20190328 Ver 1_RE_ about Bridge 141 over South River_20190320Carpenter, Kristi From: Price, Gregory W Sent: Wednesday, March 20, 2019 4:54 PM To: Steenhuis, Joanne Cc: Rerko, James J Subject: RE: ?? about Bridge 141 over South River Attachments: 17BP.6.R.75_EC_Plans_20180725.pdf Joanne, Attached is the approved Erosion Control Plan. The proposed dewatering plan will involve installing a temporary pipe for flow diversion. Sheet piling will most likely be used for impervious dike installation. Let me know if you need anything else. Thanks, Joanne. Gregory W. Price, PWS Division 6 Environmental Specialist North Carolina Department of Transportation 910 364 0835 office 919 914 1200 mobile gwprice2(o)ncdot.gov 500 Transportation Drive Fayetteville, NC 28302 'Ir- - n Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Steenhuis, Joanne <joanne.steenhuis@ncdenr.gov> Sent: Wednesday, March 20, 2019 3:53 PM To: Price, Gregory W <gwprice2@ncdot.gov> Subject: ?? about Bridge 141 over South River G reg, I am looking at the permit application for replace Bridge 141 with a culvert in Cumberland County. Can you give me a description of the dewatering proposed. Will it be a pump around or a by-pass channel? I see temporary impacts for dewatering but no description or location of it on the drawing. Will they need to use sheet pile to dewater the channel prior to installing the aluminum box culvert? Curious minds want to know! Thanks! Joanne Steenhuis Environmental Senior Specialist Transportation Permitting Branch Department of Environmental Quality (910) 796-7306 (office) (910) 308-4021 (mobile) 0oanne.steenhuis a(-ncdenr.gov Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405 --:�Nothing Compares] Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 0 * V W O Lo U U LP m r, 11 U U I'M=* MU)* ow co02: oQa NUZ /[r J OW ULn N ifAL* -Oifl 7l T / �� WRENCH ROAD ALL MI=Y �� Qp 82 69 P J E C`T 0 °� ' 5 MARTIN CA O ROAD �. � 82 SNe0 1aN9 S sc OTT c 0 13 za O QO W� STEWART ROAD �O BAREFOOT ROAD OFF -SITE DETOUR VICINITY MAP GRAPHIC SCALE 20 PROFILE (HORIZONTAL) a PROFILE (VERTICAL) THESE EROSION AND SEDIMENT CONTROL PLANS COMPLY WITH THE REGULATIONS SET FORTH BY THE NCG-010000 GENERAL CONSTRUCTION PERMIT EFFECTIVE AUGUST 1, 2016 AND ISSUED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF WATER RESOURCES. PLAN FOIR PlfB�]POSIED H���[���I' IEIE�����l�T �C�I�']ClfgOIL C UMBERLA ND C 0 UNTY LOCATION.- BRIDGE NO.250141 STEWART ROAD (SR 1819) OVER SOUTH RIVER TRIBUTARY TO JRcKSoN R�0410 TYPE OF WORD: WIDENING, GRADING, PAVING, DRAINAGE, AND STRUCTURE RFC.,IN rl 11 VFRT -L- J I A I L --- 00. 10 .0005 STEWART ROAD (SR 1819) Rr-r-IKI PPn lr-r'T 17RP / D 79 -1-- 51A I I +SU.UU Prepored in the Office of: 1616 E. MILLBROOK ROAD, SUITE #160 RALEIGH, NORTH CAROLINA 27609 ATKINS(9.9) 876-6888 NCBEES #F-0326 Designed by: NADIA MA TA, PE, CPES C 3863 NAME LEVEL III CERTIFICATION NO. It j FNI7) PROIFC'T 17RP A R 71S rl 11 VFRT -L- J IA IL + i5/.00 Reviewed in the Office of: ROADSIDE ENVIRONMENTAL UNIT 1 South Wilmington St. Raleigh, NC 27611 2018 STANDARD SPECIFICATIONS Reviewed by: MARK STALEY, CPESC, CPS WQ 416 TO BL UMAN ROAD STATE STATE PROJECT REFERENCE NO. SHEET NO. TOTAL SHEETS N.C. 17BP.6.R.75 EC-1 STATE PROD. NO. F. A. PROJ. NO. DESCRIPTION EROSION AND SEDIMENT CONTROL MEASURES SEd• Description Symbol 1630.03 Temporary Silt Ditch TO 1630.05 Temporary Diversion � TD 1605.01 Temporary Silt Fence ______________________ 1606.01 Special Sediment Control Fence 1622.01 Temporary Berms and Slope Drains ___________________'- 1630.02 Silt basin Type B __________________________________ 1633.01 Temporary Rock Silt Check Type -A Temporary Rock Silt Check Type -A with Matting and Fo➢yacry➢amide (PAM)_ 1633.02 Temporary Rock Silt Check Type-B---------- ' Watt➢e % Coir Fiber Wattle EW CFW Watt➢e % Cmir Fiber Wattle with Po➢yacry➢amide (LOAM)_______________________________________ 1634.01 Temporary Rock Sediment Dam Type -A 1634.02 Temporary Rock Sediment Dam Type-B ---- 1635.01 Rock Pipe Inlet Sediment Trap Type -A -7 1635.02 Rock Pipe Inlet Sediment Trap Type-B_----_ 1630.04 Stilling Basin-----------------------------------------------------� 1630.06 Special Stilling Basin__________________________________ Rock Inlet Sediment Trap: 1632.01 Type A A Lj 1632.02 Type B LLjj 1632.03 Type C C LJ Skimmer Basin Tiered Skimmer Basin _____________________________. Infiltration Basin---------------------------------------------- Roadway Standard Drawings THIS PROJECT CONTAINS EROSION CONTROL PLANS FOR CLEARING AND GRU��ING PHASE OF CONSTRUCTION. The following roadway english standards as appear in "Roadway Standard Drawings"- Roadway Design Unit - N. C. Department of Transportation - Raleigh, N. C., dated January 2018 and the latest revison thereto are applicable to this project and by reference hereby are considered a part of these plans. 1604.01 Railroad Erosion Control Detail 1632.01 Rock Inlet Sediment Trap Type A 1605.01 Temporary Silt Fence 1632.02 Rock Inlet Sediment Trap Type 1606.01 Special Sediment Control Fence 1632.03 Rock Inlet Sediment Trap Type C 1607.01 Gravel Construction Entrance 1633.01 Temporary Rock Silt Check Type A 1622.01 Temporary "erms and Slope Drains 1633.02 Temporary Rock Silt Check Type -3 1630.01 Riser -3asin 1634.01 Temporary Rock Sediment Darn Type A 1630.02 Silt "asin Type 1634.02 Temporary Rock Sediment Dam Type 1630.03 Temporary Silt Ditch 1635.01 Rock Pipe Inlet Sediment Trap Type A 1630.04 Stilling -3asin 1635.02 Rock Pipe Inlet Sediment Trap Type 1630.05 Temporary Diversion 1640.01 Coir Fiber -3affle 1630.06 Special Stilling -3asin 1645.01 Temporary Stream Crossing 1631.01 Matting Installation SILT C%T I T rr nlnr FENCE ISOMETRIC VIEW I G vvr% I I L L VIEW FROM SLOPE FIBER WATTLE BREAK DETAIL NOTFS: USE MINIMUM 12 IN. DIAMETER COIR FIBER (COCONUT FIBER) WATTLE AND LENGTH OF 10 FT. EXCAVATE A 1 TO 2 INCH TRENCH FOR WATTLE TO BE PLACED. DO NOT PLACE WATTLE ON TOE OF SLOPE. USE 2 FT. WOODEN STAKES WITH A 2 IN. BY 2 IN. NOMINAL CROSS SECTION. INSTALL A MINIMUM OF 2 UPSLOPE STAKES AND 4 DOWNSLOPE STAKES AT AN ANGLE TO WEDGE WATTLE TO GROUND. PROVIDE STAPLES MADE OF 0.125 IN. DIAMETER STEEL WIRE FORMED INTO A U SHAPE NOT LESS THAN 12" IN LENGTH. INSTALL STAPLES APPROXIMATELY EVERY 1 LINEAR FOOT ON BOTH SIDES OF WATTLE AND AT EACH END TO SECURE IT TO THE SOIL. WATTLE INSTALLATION CAN BE ON OUTSIDE OF THE SILT FENCE AS DIRECTED. INSTALL TEMPORARY SILT FENCE IN ACCORDANCE WITH SECTION 1605 OF THE STANDARD SPECIFICATIONS. . INSET A FILL c' now 1 ►► - _ 2 ►► TRENCH J A it ■ A A T T ■ J LT FENCE POST INSET A DOWNSLOPE STAKE SIDE VIEW 15"-16" COIR FIBER WATTLE BARRIER DETAIL ISOMETRIC VIEW 2' WOODEN FRONT VIEW AL SEE INSET A I\IOTFC - USE MINIMUM 18 IN. NOMINAL DIAMETER COIR FIBER (COCONUT) WATTLE AND LENGTH OF 10 FT. EXCAVATE A 2 TO 3 INCH TRENCH FOR WATTLE TO BE PLACED. DO NOT PLACE WATTLES ON TOE OF SLOPE. USE 2 FT. WOODEN STAKES WITH A 2 IN. BY 2 IN. NOMINAL CROSS SECTION. INSTALL A MINIMUM OF 2 UPSLOPE STAKES AND 4 DOWNSLOPE STAKES AT AN ANGLE TO WEDGE WATTLE TO GROUND. PROVIDE STAPLES MADE OF 0.125 IN. DIAMETER STEEL WIRE FORMED INTO A U SHAPE NOT LESS THAN 12" IN LENGTH. INSTALL STAPLES APPROXIMATELY EVERY 1 LINEAR FOOT ON BOTH SIDES OF WATTLE AND AT EACH END TO SECURE IT TO THE SOIL. FOR BREAKS ALONG LARGE SLOPES, USE MAXIMUM SPACING OF 25 FT. FILL IS - INSET A 2"-3" TRENCH TOP VIEW V<JYYIVVL<JI L V I r%[\L COIR FIBER COIR FIBER WATTLE POLYACRYLAMIDE (PAM) SLOPE ISOMETRIC VIEW ?'(MAY _ ) 2' UPSLOPE 2 IN. MATTING CROSS SECTION VEE DITCH See Inset C EDGE OF PAVEMENT J 1 mr\C 2' UPSLOPE CT A VC CROSS SECTION TRAPEZOIDAL DITCH GROUND NATURAL GROUND 2' DOWNSLOPE STAKE FLOW WITH DETAIL NOTES: USE MINIMUM 12 IN. DIAMETER COIR FIBER (COCONUT FIBER) WATTLE. USE 2 FT. WOODEN STAKES WITH A 2 IN. BY 2 IN. NOMINAL CROSS SECTION. ONLY INSTALL WATTLE(S) TO A HEIGHT IN DITCH SO FLOW WILL NOT WASH AROUND WATTLE AND SCOUR DITCH SLOPES AND AS DIRECTED. INSTALL A MINIMUM OF 2 UPSLOPE STAKES AND 4 DOWNSLOPE STAKES AT AN ANGLE TO WEDGE WATTLE TO BOTTOM OF DITCH. PROVIDE STAPLES MADE OF 0.125 IN. DIAMETER STEEL WIRE FORMED INTO A U SHAPE NOT LESS THAN 12" IN LENGTH. INSTALL STAPLES APPROXIMATELY EVERY 1 LINEAR FOOT ON BOTH SIDES OF WATTLE AND AT EACH END TO SECURE IT TO THE SOIL. INSTALL MATTING IN ACCORDANCE WITH SECTION 1631 OF THE STANDARD SPECIFICATIONS. PRIOR TO POLYACRYLAMIDE (PAM) APPLICATION, OBTAIN A SOIL SAMPLE FROM PROJECT LOCATION, AND FROM OFFSITE MATERIAL, AND ANALYZE FOR APPROPRIATE PAM FLOCCULANT TO BE APPLIED TO EACH WATTLE. INITIALLY APPLY 2 OUNCES OF ANIONIC OR NEUTRALLY CHARGED PAM OVER WATTLE WHERE WATER WILL FLOW AND 1 OUNCE OF PAM ON MATTING ON EACH SIDE OF WATTLE. REAPPLY PAM AFTER EVERY RAINFALL EVENT THAT IS EQUAL TO OR EXCEEDS 0.50 IN. INSET A AM (1 oz.) INSET B oz. CAI (1 oz.) TOP VIEW INSET C PROJECT REFERENCE NO. SHEET NO. 17BP.6.R.75 EC -2C RiW SHEET NO. II ROADWAY DESIGN HYDRAULICS T Mpo A Y ROCK Sl LT CHECK TYP A WITH ENGINEER ENGINEER EXCELSIOR MATTING AND POLYACRYLAMIDE (PAM) EXCELSIOR NOTES: MATTING FLOW B INSTALL TEMPORARY ROCK SILT CHECK TYPE A IN ll ACCORDANCE WITH ROADWAY STANDARD DRAWING N0, 1633,01, SEDIMENT CONTROL STONE°D ° D a O p O DUSE EXCELSIOR FOR MATTING MATERIAL AND ANCHOR O O p O p p D O p MATTING SECTION AT TOP AND BOTTOM WITH CLASS B STONE. O D O p O O p A p"" 0 o� OoQ �o� C6o A PRIOR TO POLYACRYLAM I DE (PAM) APPLICATION, OBTAIN og 00 O � o0 0 00 O O�Q �O A SOIL SAMPLE FROM PROJECT LOCATION AND FROM OFFSITE D O Q O° °°D � DOD ° �O� O� O°OMATERIAL, AND ANALYZE FOR APPROPRIATE PAM FLOCCULANT 0, o 0 �OD ° ° 0 00 0 o �`������� TO BE APPLIED TO EACH ROCK SILT CHECK. �O o �O d O o O FO �O o �O CFO ° POD o O ° od ° O D �O ° ° D D Q ° ° O O O O O �Oa 0� o moo �� INITIALLY APPLY 4 OUNCES OF POLYACRYLAMI DE (PAM) pow ° �O 4� ° O ° ° O d �O D TO TOP OF MATTING SECTION AND AFTER EVERY RAINFALL Q D � ° D � i D �� �EVENT THAT EQUALS OR EXCEEDS 0.50 INCHES. �� STRUCTURAL STONE � B PAM (4 OZ.) PLAN *so" INSET A See Inset A CLASS B STONE 2/3 CHANNEL 1' MIN EXCELSIOR WIDTH MATTING 0 0 0 ° 12" 1' MIN O000000 0000 _ ► oD�Co�o° H — 2 MIN ° ° D O ��O OHO OHO OHO OHO ° op�Dp Ell (- EXCELSIOR MATTING SECTION B - B CLASS B STONE SECTION A -A NOT TO SCALE i i s OF HIGHWAYS NORTH CAROLINA SOIL STABILIZATION TIM.EFRAMES SITE DESCRIFTION STABILIZATION TIME TIMEFRAME EXCEFTIONS PERIMETER DIKES9 SWALES9 DITCHES AND SLOPES 7 DAYS NONE HIGH DUALITY WATER (HQW) ZONES 7 DAYS NONE SLOPES STEEPER THAN 3e1 7 DAYS IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2e1914 DAYS ARE ALLOWED. SLOPES 3o1OR FLATTER 14 DAYS 7 DAYS FOR SLOPES GREATER THAN 50'IN LENGTH. ALL OTHER AREAS WITH SLOPES FLATTER THAN 401 14 DAYS NONE9 EXCEPT FOR PERIMETERS AND HOW ZONES. i i s OF HIGHWAYS NORTH CAROLINA SOIL STABILIZATION MATTING FOR EROSION CONTROL CONST SHEET NO. LINE FROM STATION TO STATION SIDE ESTIMATE T Y ES MA E (S ) -I,- 13+0b 13+82 KT 70 -I�- 11+02 11+75 KT 70 1 -I,- 13+00 13+25 ITT 25 5U b T0TAL, I65 MI66��,ANE U5 MATTINb TO U INSTA I, O A5 OIW TEO V THE NbINEEK 8 3 5 T0TA1� 1000 5AY 1000 SUMMARY SHEET PERMANENT SOIL REINFORCEMENT MAT CONST SHEET NO. LINE FROM STATION TO STATION SIDE T I MAT (Y) ESTIMATE S - I - 1 3 + 25 I l-+ 75 ITT 11-0 5U T0TA1, I1-0 AOO I T I ON4 CSKM T O U T NSf GI, O 50 T0TAL, 190 5AY 200 PROJECT REFERENCE NO. 17BPe6.Re75 R,W SHEET NO. ROADWAY DESIGN ENGINEER SHEET NO. EC-05/CONST.04 HYDRAULICS ENGINEER CULVERT CONSTRUCTION SEQUENCE STA. 12 + 70*5 -L- � N O O O 00 Proposed Channel Transition Excavation GREU TL-3 SR 18/9 STEW ART RD /8' BST N O 0 GREU TL-3 T Ln C\j IMPERVIOUS DIKE -E 24 INCH TEMPORARY PIPE rff"� I �90 40 00000 i0 i O t i i °0000o I E CONSTRUCTION SEQUENCE FOR ALUMINUM BOX CULVERT 1. UTILIZE SPECIAL STILLING BASIN(S) DURING CONSTRUCTION AS NEEDED. 2. CONSTRUCT IMPERVIOUS DIKES AND INSTALL 24-INCH TEMPORARY PIPE FOR DIVERTING STREAM FLOW. 3. DEWATER CONSTRUCTION AREA UTILIZING SPECIAL STILLING BASIN(S). 4. REMOVE EXISTING BRIDGE SUPERSTRUCTURE AND SUBSTRUCTURE. 5. CONSTRUCT NEW ALUMINIUM BOX CULVERT. b. REMOVE IMPERVIOUS DIKES, TEMPORARY PIPE, AND SPECIAL STILLING BASIN(S). 7. COMPLETE ROADWAY. F E 224 - - �- ---- ----- - - -�- - - - LnN-) A '�q- C\1 O O SR 18/9 STEW ART RD /8' BST 0 Ln � � ClC) O 0 O 0 O IT 00- �1 n �00C god -0 GREU TL73.------ 15- / — T 'w - i OrRw , 1 IMPERVIOUS DIKE 1 - I -i