HomeMy WebLinkAbout20190328 Ver 1_RE_about Bridge 141 over South River_20190321Carpenter, Kristi
From:
Price, Gregory W
Sent:
Thursday, March 21, 2019 8:19 AM
To:
Steenhuis, Joanne
Cc:
Rerko, James J
Subject:
RE: ?? about Bridge 141 over South River
No problem, Joanne. We were fortunate enough to come across the EC plans, and even
then the dewatering sequence is not always shown in EC plans. Often we don't have the
EC plans at this stage. Anyway, let me know if you need anything else. Thanks, Joanne.
Gregory W. Price, PWS
Division 6 Environmental Specialist
North Carolina Department of Transportation
910 364 0835 office
919 914 1200 mobile
gwprice2(o)ncdot.gov
500 Transportation Drive
Fayetteville, NC 28302
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Steenhuis, Joanne <joanne.steenhuis@ncdenr.gov>
Sent: Thursday, March 21, 2019 7:35 AM
To: Price, Gregory W <gwprice2@ncdot.gov>
Subject: RE: ?? about Bridge 141 over South River
Thanks Greg that help a lot
From: Price, Gregory W
Sent: Wednesday, March 20, 2019 4:54 PM
To: Steenhuis, Joanne <joanne.steenhuis@ncdenr.gov>
Cc: Rerko, James J <jjrerko@ncdot.gov>
Subject: RE: ?? about Bridge 141 over South River
Joanne,
Attached is the approved Erosion Control Plan. The proposed dewatering plan will
involve installing a temporary pipe for flow diversion. Sheet piling will most likely be
used for impervious dike installation. Let me know if you need anything else. Thanks,
Joanne.
Gregory W. Price, PWS
Division 6 Environmental Specialist
North Carolina Department of Transportation
910 364 0835 office
919 914 1200 mobile
gwprice2(a)ncdot.gov
500 Transportation Drive
Fayetteville, NC 28302
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Steenhuis, Joanne <]oanne.steenhuis@ncdenr.gov>
Sent: Wednesday, March 20, 2019 3:53 PM
To: Price, Gregory W <gwprice2@ncdot.gov>
Subject: ?? about Bridge 141 over South River
G reg,
I am looking at the permit application for replace Bridge 141 with a culvert in
Cumberland County. Can you give me a description of the dewatering proposed. Will it
be a pump around or a by-pass channel? I see temporary impacts for dewatering but no
description or location of it on the drawing. Will they need to use sheet pile to dewater
the channel prior to installing the aluminum box culvert? Curious minds want to
know! Thanks!
Joanne Steenhuis
Environmental Senior Specialist
Transportation Permitting Branch
Department of Environmental Quality
(910) 796-7306 (office)
(910) 308-4021 (mobile)
0oanne.steenhuis(a ncdenr.gov
Wilmington Regional Office
127 Cardinal Drive Extension
Wilmington, NC 28405
Nothing Compares.,.,.
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third
parties.