Loading...
HomeMy WebLinkAbout20190328 Ver 1_RE_about Bridge 141 over South River_20190321Carpenter, Kristi From: Price, Gregory W Sent: Thursday, March 21, 2019 8:19 AM To: Steenhuis, Joanne Cc: Rerko, James J Subject: RE: ?? about Bridge 141 over South River No problem, Joanne. We were fortunate enough to come across the EC plans, and even then the dewatering sequence is not always shown in EC plans. Often we don't have the EC plans at this stage. Anyway, let me know if you need anything else. Thanks, Joanne. Gregory W. Price, PWS Division 6 Environmental Specialist North Carolina Department of Transportation 910 364 0835 office 919 914 1200 mobile gwprice2(o)ncdot.gov 500 Transportation Drive Fayetteville, NC 28302 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Steenhuis, Joanne <joanne.steenhuis@ncdenr.gov> Sent: Thursday, March 21, 2019 7:35 AM To: Price, Gregory W <gwprice2@ncdot.gov> Subject: RE: ?? about Bridge 141 over South River Thanks Greg that help a lot From: Price, Gregory W Sent: Wednesday, March 20, 2019 4:54 PM To: Steenhuis, Joanne <joanne.steenhuis@ncdenr.gov> Cc: Rerko, James J <jjrerko@ncdot.gov> Subject: RE: ?? about Bridge 141 over South River Joanne, Attached is the approved Erosion Control Plan. The proposed dewatering plan will involve installing a temporary pipe for flow diversion. Sheet piling will most likely be used for impervious dike installation. Let me know if you need anything else. Thanks, Joanne. Gregory W. Price, PWS Division 6 Environmental Specialist North Carolina Department of Transportation 910 364 0835 office 919 914 1200 mobile gwprice2(a)ncdot.gov 500 Transportation Drive Fayetteville, NC 28302 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Steenhuis, Joanne <]oanne.steenhuis@ncdenr.gov> Sent: Wednesday, March 20, 2019 3:53 PM To: Price, Gregory W <gwprice2@ncdot.gov> Subject: ?? about Bridge 141 over South River G reg, I am looking at the permit application for replace Bridge 141 with a culvert in Cumberland County. Can you give me a description of the dewatering proposed. Will it be a pump around or a by-pass channel? I see temporary impacts for dewatering but no description or location of it on the drawing. Will they need to use sheet pile to dewater the channel prior to installing the aluminum box culvert? Curious minds want to know! Thanks! Joanne Steenhuis Environmental Senior Specialist Transportation Permitting Branch Department of Environmental Quality (910) 796-7306 (office) (910) 308-4021 (mobile) 0oanne.steenhuis(a ncdenr.gov Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405 Nothing Compares.,.,. Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.