HomeMy WebLinkAbout310214_30 day POA_20180813a��g �13 l8
PbkV OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: _31-214
Facility Name:
Sharons Nursery
County:Duplin
Certified Operator Name: _Randy Patterson Operator
# 17698
Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Lagoon NameAdentifier (ID): _1 2_
Spillway (Yes or No): _N _N
Level (Inches): _18 _23
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures. Five
and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within
acceptable ranges.
_X_Liquid level'is within the 25 year 24 hour storm elevations for one or more structures. A 30 day
Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to
pumped and hauled Is reflected in section III tables. Included within this plan is a list of the,
proposed sites with related facility number(s), number acres and receiving crop information.
Contact and secure approval from the Division of Water Resources prior to transfer of
waste to a site not covered In the facility's certified animal waste management plan.
Operation will be partially or fully depopulated.
- attach a complete schedule with corresponding animal units and dates for depopulation
- if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: _8-13-2018
I hereby certify that I have reviewed the information listed above and included within the attached Plan
of Action, and to the best of my knowledge and ability, the information is accurate and correct
_Randy Patterson 262-229-1407 Phone:
Facility OwneriManager (print)
PoA Cover Page 2121100
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
. _ THIRTY (30) DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/identifier (ID): 31-214
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker _18_ inches
b. designed 25 yr./24 hr. storm & structural freeboard 19_ inches
c. line b - line a (inches in red zone) _ _ 1.0 _ inches
d. top of dike surface area according to design 22200_ ff
(area at below structural freeboard elevation)
e. line c x line d x 7.48 ala l03 s = gallons
12 ft
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design _180 _ days
g. volume of waste produced according to structural design _23501 ft3
h. actual waste produced = current herd # 3200 x line g=17626_ ft3
certified herd # 24061
i. volume of wash water according to structural design
J. excess rainfall over evaporation according to design
k. (lines h + 1 +1) x 7.48 x 30 days =
line f
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 5-24-18
m. (lines e + k) x line I =
1000
ft3
1295 ft3
_38118_ gallons
_ 2.135 Ib/1000 gal.
_ 81.38_ lb PAN
REPEAT SECTION / FOR EACH WASTE STRUCTURE ON SITE
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
PoA (30 Day) 2/21/00 1
z
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
_-THIRTY (30) DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): _31-214 lagoon #2
2..Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard
a.
current liquid level according to marker
_23_
inches
b.
designed 25 yr.124 hr. storm & structural freeboard
inches
_19
c.
line b - line a (inches in red zone) _
_ 4.0 _
inches
d.
top of dike surface area according to design
23100_ft2
(area at below structural freeboard elevation)
e.
line c x line d x 7.48 alo lo3 s =
gallons
12 ft
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design _180 _ days
g. volume of waste produced according to structural design _23444 ft3
h. actual waste produced = current herd # 3200 x line g=17326_ ft3
certified herd # 24001
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h +'1 +i) x 7.48 x 30 days =
line f
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 5-24-18
m. (lines e + k) x line I =
1000
ft3
1510 ft3
_27968_ gallons
_ 1.92 Ib/1000 gal.
_ 53.62_ lb PAN
REPEAT SECTION / FOR EACH WASTE STRUCTURE ON SITE
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
PoA (30 Day) 2121/00 1
1.
structure ID:u1
line m = _81.38
lb PAN
2.
structure ID: 2
line m = 53.62
lb PAN
3.
structure ID:
line m =
lb PAN
4.
structure ID:
line m =
lb PAN
5.
structure ID:
line m =
lb PAN
6.
structure ID:
line m =
lb PAN
n.
lines 1+2+3+4+5+6 =
135.00
lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAYDRAW DOWN
PERIOD.
DO NOT LIST FIELDS TO WHICH PAN CAN
NOT BE APPLIES DURING THIS 30 DAY PERIOD.
o. tract #
p. field #
q. crop
r. acres
s. remaining
IRR=2 PAN
balance
(lb/acre)
t. TOTAL PAN
BALANCE
FOR FIELD
(Ibs.)
column r x s
u.
application
window'
5612
1
soybeans
5.85
137
801.45
3/1-10/31
2
bermuda
5.09
300
1527.00
3/1-10/31
'State current crop ending application date or next crop application beginning date for available receiving
crops during 30 day drawn down period
v. Total PAN available for all fields (sum of column t) = _2328.45 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
PoA (30 Day) V21/00 2
w. Total PAN to be land applied (line n from section II) = lb. PAN
x. Crop's remaining PAN balance (line v from section III) _ _2328.45 lb. PAN
y. Overall PAN balance (w - x) _ _ 135.00 lb. PAN
Line y must show as a deficit If line y does not show as'a deficit, list course of action here
including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd
reduction options, recalculate new PAN based on new information. If new fields -are to be
included as an option for lowering lagoon level, add these fields to the PAN balance•table and
recalculate the overall PAN balance. If animal waste is to be hauled to another permitted
facility provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
NARRATIVE:
Pump as field and weather conditions permit Additional acres available if needed.
PoA (30 Day) 2121100
Date: 8-8-18
Facility OVvneilManager (signature)
PoA Cover Page 2121/00