Loading...
HomeMy WebLinkAbout310214_Compliance Inspection_20180619c C Division of Water Resources FacItty Number - O Division of Soil and Water Conservation O Other Agency (Type of Visit: Q Co rance Inspection O Operation Review O Structure Evaluation O Technical Assistance Reason for Visit: Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: P4( rrival Time: Departure Time: ® County: Region: Farm Name: Owner Name: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Swine Owner Email: Phone: Title: Latitude: Phone: Integrator: Certification Number: I (� ( S Certification Number: Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. La er C O9 (I INon-Layer We o17 h Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other Other Design Current Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? _ d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? Longitude: Design Current Cattle Capacity Pop. Da Cow Da Calf D Heifer D Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow ❑ Yes nNo ❑ NA [_]NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes LJ ❑ NA ❑ NE Yes ❑ 0 ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE Page I of 3 21412015 Continued Faclli Number: 2, jDate of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes 2-go- o ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes Ej No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes '[]'No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an Immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9 Does any part of the waste management system other than the waste structures require ❑ Yes EjrNo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ffNo ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes nNo ❑ NA ❑ NE ❑ Excessive Pending ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN> 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes 6 No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes ff; ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ No Yes L ❑ NA ❑ NE Required Records & Documents 19. Did the facility fall to have the Certificate of Coverage & Permit readily available? ❑ Yes NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes gNo ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑Design . Maps ❑LeaseAgreements ❑O 21. Does record keeping need improvement? If yes, chec the appropriate box below. Yes ❑ No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboar Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑'Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield 120 Minute Inspections ❑ Monthly and V Rainfall Inspections El Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? El Yes ] No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA NE Page 2 of 21412015 Continued Facili Number: Date of Inspection: 24 Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes �❑ NA ❑ NE the appropriate box(es) below ❑ Failure to complete annual sludge survey [:]Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of fast survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes do ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No ❑ NA -Cl—RE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normah 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Au Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface the drams exist at the facility? If yes, check the appropriate box below ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32 Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? Reviewer/Inspector Signature: ❑ Yes ❑'No ❑ NA ❑ NE [:]Yes [:]No ❑ NA ❑ NE [—]Yes No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA EDI_ ❑ Yes No ❑ NA ❑ NE [:]Yes LSrNc NA ❑ NE ❑ Yes o ❑ NA ❑ NE �S Date: Page 3 of 3 21412015