Loading...
HomeMy WebLinkAbout20190378 Ver 1_Approval Letter_20190425DocuSign Envelope ID: 4B5DCA7B-OB07-406C-B3D6-21 FA299573A0 ROY COOPER Covernar MICHAEL S. REGAN Secretary LINDA CULPEPPER director 044�_: vxo,[ r . �f�� ? �-. ��.,_r ���` ,�« : n�_.. �$� �„u,�E�.� PJORTH CAROLINA Environmentaf Qualrty April 25, 2019 Rowan County NCDWR Project No. 20190378 Bridge 170 on SR 2300 Project 17BP.9.R.81 APPROVAL of 401 WATER QUALITY CERTIFICATION with ADDITIONAL CONDITIONS Ms. Amy Euliss, Division Environmental Officer NCDOT, Division 9 375 Silas CreEk Parkway Winston Salein, NC 27127 Dear Ms. Euliss: You have our approval, in accordance with the conditions listed below, for the following impacts for replacing Bridge 170 with a new bridge over Crane Creek in Rowan County. Site Totals Stream Impacts in the Yadkin Pee Dee River Basin. Permanent Fill in Perennial Stream (linear ft) Stream Relocation Bank Stabilization 127 127 79 Total Stream Impact for Project: 206 linear feet. Stream lmpacts Requiring Mitigation (linear ft) Tl�e project shall be constructed in accordance with your application dated Marct� 27, 2019. After reviewing your application, we have decided that the proposed impacts are covered by Ceneral Water Quality Gertification (GC) Number 4135. This GC corresponds to US Army Corps of Engineers Nationwide Pernut 14. ln addition, you should acquire any other federal, state or local permits before you proceed with your project including (but not linvted to) Sediment and Erosion Control, Non-Discharge and Water Supply Watershed regulations. This approval will expire with the corresponding 404 permit. This approval is valid solely for the piupose and design described u1 your application (unless inodified below). Should your project change, you must notify the NCDWR and submit a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for coinplying with all the conditions. If total wetland fills for this project (now or in the fiihu-e) exceed one acre, or of total impacts to streams (now or in the fiiture) exceed 300 linear feet, compensatory mitigation may be required as ����� North Caroliroa Department of Environmental Quality I biv4sion of Water Resources 512 North Salisbury Street I]6l7 Mail Seruice Center I Raleigh, North Carolina 27699-1617 NpqTH [:hF�`}LINA ^ o.a.m,remm�w�o���md�.e� /"� 914.707.9000 �../ DocuSign Envelope ID: 4B5DCA7B-0607-406C-B3D6-21FA299573A0 described in 15A NCAC 2H .0506 (h) (6) and (7). For this approval to remain valid, you must adhere to the conditions listed in the attached certification(s) and any additional conditions listed below. Condition(s) of Certification: Project Specific Conditions 1. The post-construction removal of any temporary bridge structures must return the project site to its preconstruction contours and elevations. The impacted areas shall be revegetated with appropriate native species. [15A NCAC 02H .0506(b)(2) 2. All work in or adjacent to stream waters shall be conducted per approved BMP measures from the most current version of NCDOT Construction and Maintenance Activities manual. [15A NCAC 02H.0506(b)(3) and (c)(3)] 3. Bridge demolition and construction must be accomplished in strict compliance with the most recent version of NCDOT's Best Management Practices for Construction and Maintenance Activities. [15A NCAC 02H .0507(d)(2) and 15A NCAC 02H .0506(b)(5)] 4. If concrete is used during construction, a dry work area shall be maintained to prevent direct contact between curing concrete and stream water. Water that inadvertently contacts uncured concrete shall not be discharged to surface waters due to the potential for elevated pH and possible aquatic life and fish kills. [ 15A NCAC 02B.0200] 5. Bridge deck drains shall not discharge directly into the stream. Stormwater shall be directed across the bridge and pre-treated through site-appropriate means (grassed swales, pre-formed scour holes, vegetated buffers, etc.) before entering the stream. To meet the requirements of NCDOT's NPDES permit NCS000250, please refer to the most recent version of the North Carolina Department of Transportation Stormwater Best Management Practices Toolbox manual for approved measures. [ 15A NCAC 02H .0507(d)(2) and 15A NCAC 02H .0506(b)(5)] General Conditions 1. The dimension, pattern and profile of the stream above and below the crossing shall not be modified. Disturbed floodplains and streams shall be restored to natural geomorphic conditions. [15A NCAC 02H.0506(b)(2)] 2. Placement of culverts and other structures in open waters and streams, shall be placed below the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches, and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches, to allow low flow passage of water and aquatic life. Design and placement of culverts and other structures including temparary erosion control measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands or streambeds or banks, adjacent to or upstream and downstream of the above structures. The applicant is required to provide evidence that the equilibrium is being maintained if requested in writing by the NCDWR. If this condition is unable to be met due to bedrock or other limiting features encountered during construction, please contact the NCDWR for guidance on how to proceed and to determine whether a permit modification will be required. [15A NCAC 02H.0506(b)(2)] 3. The use of rip-rap above the Normal High Water Mark shall be minimized. Any rip-rap placed for stream stabilization shall be placed in stream channels in such a manner that it does not impede aquatic life passage. [15ANCAC 02H.0506(b)(2)] 4. The Permittee shall ensure that the final design drawings adhere to the permit and to the permit drawings submitted for approval. [15A NCAC 02H .0507(c) and 15A NCAC 02H .0506 (b)(2) and (c)(2)] 5. No rock, sand or other materials shall be dredged from the stream channel except where authorized by this certification. [15ANCAC 02H.0506(b)(3)] DocuSign Envelope ID: 4B5DCA7B-0607-406C-B3D6-21FA299573A0 6. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is prohibited. [15A NCAC 02H.0506(b)(3)] 7. The permittee and its authorized agents sha11 conduct its activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with §303(d) of the C1ean Water Act) and any other appropriate requirements of State and Federal law. If the NCDWR determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that further conditions are necessary to assure compliance, the NCDWR may reevaluate and modify this certification. [ 15A NCAC 02B.0200] 8. All fill slopes located in jurisdictional wetlands shall be placed at slopes no flatter than 3:1, unless otherwise authorized by this certification. [15A NCAC 02H.0506(b)(2)] 9. A copy of this Water Quality Certification shall be maintained on the construction site at all times. In addition, the Water Quality Certification and all subsequent modifications, if any, shall be maintained with the Division Engineer and the on-site proj ect manager. [ 15A NCAC 02H .4507(c) and 15A NCAC 02H .0506 (b)(2) and (c)(2)] 10. The outside buffer, wetland or water boundary located within the construction corridor approved by this authorization shall be clearly marked by highly visible fencing or flagging prior to any land disturbing activities. Impacts to areas within the fencing are prohibited unless otherwise authorized by this certification. [15A NCAC 02H.0501 and .0502] 11. The issuance of this certification does not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by other government agencies (i.e. local, state, and federal) having jurisdiction, including but not limited to applicable buffer rules, stormwater management rules, soil erosion and sedimentation control requirements, etc. 12. The Permittee shall report any violations of this certification to the Division of Water Resources within 24 hours of discovery. [15A NCAC 02B.0506(b)(2)] 13. Upon completion of the project (including any impacts at associated borrow or waste sites), the NCDOT Division Engineer (or appointee) shall complete and return the enclosed "Certification of Completion Form" to notify the NCDWR when all work included in the 401 Certification has been completed. [15A NCAC 02H.0502(�] 14. Native riparian vegetation must be reestablished in the riparian areas within the construction limits of the project by the end of the growing season following completion of construction. [15A NCAC 02H.0506(b)(3) and (c)(3)] 15. There shall be no excavation from, or waste disposal into, jurisdictional wetlands or waters associated with this permit without appropriate modification. Should waste or borrow sites, or access roads to waste ar borrow sites, be located in wetlands ar streams, compensatory mitigation will be required since that is a direct impact from road construction activities. [15A NCAC 02H.0506(b)(3) and (c)(3)] 16. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards [15A NCAC 02H.0506(b)(3) and (c)(3]): a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the proj ect. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. DocuSign Envelope ID: 4B5DCA7B-0607-406C-B3D6-21FA299573A0 d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 17. Where placement of sediment and erosion control devices in wetlands and/or waters is unavoidable, they shall be removed, and the natural grade restored upon completion of the project. [15A NCAC 02H.0506(b)(3) and (c)(3)] If you wish to contest any statement in the attached Certification you must file a petition for an administrative hearing. You may obtain the petition form from the office of Administrative hearings. You must file the petition with the office of Administrative Hearings within sixty (60) days of receipt of this notice. A petition is considered filed when it is received in the office of Administrative Hearings during normal office hours. The Office of Administrative Hearings accepts filings Monday through Friday between the hours of 8:OOam and S:OOpm, except for official state holidays. The original and one (1) copy of the petition must be filed with the Office of Administrative Hearings. The petition may be faxed-providing the original and one copy of the document is received by the Office of Administrative Hearings within five (5) business days following the faxed transmission. The mailing address for the Office of Administrative Hearings is: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 Telephone: (919) 431-3000, Facsimile: (919) 431-3100 A copy of the petition must also be served on DEQ as follows: Mr. Bill F. Lane, General Counsel Department of Environmental Quality 1601 Mail Service Center This letter completes the review of the Division of Water Resources under Section 401 of the Clean Water Act. If you have any questions, please contact Dave Wanucha at (336) 776-9703 or dave.wanucha@ncdenr.gov. Sincerely, DocuSigned by: � C�lA.�W1.l.UA. Lm a �u�'e ° e'r4 Director P PP , Division of Water Resources Electronic copy only distribution: Bryan Roden-Reynolds, US Army Corps of Engineers, Charlotte Field Office Claire Ellwanger, US Fish and Wildlife Service Marla Chambers, NC Wildlife Resources Commission File Copy DocuSign Envelope ID: 4B5DCA7B-OB07-406C-B3D6-21 FA299573A0 ROY CQOPER Governar MICHAEL S. REGArG $ECYPfQ!"}� LINDA CULPEPPER director 44�� ���v�[ r r♦�'., p..�. H . aa. i.+; �F'�� V'� q � .! J r� fY. � � . a `i' ��—r� '� - ��� `,.,. ;�« �: n�_- \'Bi QllqY,Ylul'�� PJORTH CARC7LINA Environmentaf Qualrty NCDWR Project No.: County: Applicant: Project Name: Date of Issuance of 401 Water Quality Certification: Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent mociificatio�7s, the applicant is required to return this certificate to the 401 Transportation Perinitting Unit, North Carolina Divisioi� of Water Resow-ces, 1617 Mail Service Center, Raleigh, NC, 27699-1617. This form may be returned to NCDWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, , hereby state that, to the best of rny abiliries, due care and diligence was used in the observation of the construction such that the construction was obseived to be bLiilt within substantial coinpliance and intent of the 40l Water Quality Certification and Buffer Rul�s, the approved plans and specifications, and other sLipporting materials. Signature: Date: Agent's Certificc�tion I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction sucl� that the construction was observed to be built within substantial co�npliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other sLipporting materials. Signature: Date: Engineer's Certification Partial Final I, , as a d«ly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that flie consnucYion was observed to be b�ult within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Registration No. Date ����� North Garoliroa Department of Environmental Quality I bivision of Water Resources 512 North 5alisbury Street I]6l7 Mail Seruice Center I Ra[eigh, North Carolina 27699-1617 NpqTH [:hF�`}LINA ^ o.n.�m,emm�W����md�.e� /"� 914.7�7.9000 `/