HomeMy WebLinkAbout310131_30 day POA_20181015BARWICK AG SERVICES, LLC 103 COUNTRY CLUB CIRCLE CLINTON, NC 28328 October 15, 2018 North Carolina Division of Aquifer Protection Attn: Mrs. Kristin Miguez 127 Cardinal Drive Extension Wilmington, NC 28405-2845 Dear Kristin, Please find enclosed Plans of Action for the Hunter farms All were pumped down prior to Hurricane Florence but due to 25-30" of rain, all lagoons got in the red. Pre -and post -storm levels were as follow: 31-131 Michael Hunter#1 (Hazel Farm): 44" pre; 17" post 31-792 Michael Hunter #2 (Hallsville Farm)- 46" pre; inundated post Both lagoons are now in compliance. We have had an extremely wet 2018 and lagoons have been more difficult to manage than usual. Thank you for your attention to this matter. Sincerely, Curtis Barwick Ugb [96 PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number 31-131 Facility Name Michael Hunter #1 (Hazel) Certified Operator Name Scott Hunter County Duplin Operator Number 18075 1 Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways Lagoon Name/ID Spillway(Y or N): Level(inches): Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 17 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures A 30 day Plan of Action is attached Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations Volume and PAN content of waste to be pumped and hauled is reflected in section III tables Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP Operation will be partially or fully depopulated. 'Attach a complete schedule with corresponding animal units and dates fro depopulation cif animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3 Earliest possible date to begin land application of waste 9/21/2018 1 hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Michael Hunter Facility Owner/Manager (print) Phone 910 298-8364 Date, 10/9/2018 Facility Owner/Manager (signature) II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1 Structure ID. 1 line m = 161 2 lb PAN 2 Structure ID: line m = lb PAN 3 Structure ID line m = lb PAN 4. Structure ID line m = lb PAN 5. Structure ID line m = lb PAN 6. Structure ID line m = lb PAN n. lines 1 + 2 + 3 + 4 + 5 + 6 = 1612lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD_ a tract # p. field # q. crop r acres s remaining IRR 2 PAN balance (lb/acre) L TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u application window' 1671 10 small grain 5.05 5000 2525 Oct -Mar 1671 11 small grain 5.05 50.00 2525 Oct -Mar 1671 12 small grain 541 5000 2705 Oct -Mar 1671 9 small grain 531 5000, 265.5 Oct -Mar 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 1041 0 lb. PAN IV. FACILITY'S PDA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 161 2 lb. PAN PDA (30 Day) 2/21/00 x. Crop's remaining PAN balance (line v from section III) = 1041 0 lb. PAN y. Overall PAN balance (w - x) _ -880 lb. PAN Line y must show as a deficit If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc For pump & haul and herd reduction options, recalculate new PAN based on new information If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility Irrigation onto existing spray fields will continue as weather and field conditions permit Other land is available application. PoA (30 Day) 2121100 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/ldentifier (ID). 1 2 Current liquid volume in 25 yr /24 hr storm storage & structural freeboard a current liquid level according to marker b designed 25 yr./24 hr storm & structural freeboard c line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c112 x line d x 7.48 gallonslft' 3. Projected volume of waste liquid produced during draw down period f temporary storage period according to structural design 17.0 inches 19.5 inches 25 inches 60475 ftz 94240 gallons 180 days g volume of waste produced according to structural design 80706 ft3 h current herd # 2448 certified herd # 2448 actual waste produced = current herd # x line g = certified herd # i volume of wash water according to structural design j excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4 Total PAN to be land applied during draw down period I current waste analysis dated 9/26/2018 m ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 80706 ft' 0 ft3 36750 ft3 146428 gallons 0.67 Ibs/1000 gal. 161.2 Ibs. PAN PoA (30 Day) 2/21/00