Loading...
HomeMy WebLinkAbout20190524 Ver 1_Parkstone Place PCN 4-21-19-FINAL_20190422W A u, v Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Page 1 of 10 PCN Form — Version 1.4 January 2009 Pre -Construction Notification (PCN) Form A. Applicant Information 1. Processing 1a. Type(s) of approval sought from the Corps: ❑X Section 404 Permit ❑ Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: #12 &#29 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ❑ Yes ❑X No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ❑X 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ YesX❑ No For the record only for Corps Permit: ❑ Yes ❑X No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ❑X No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ❑X No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ❑X No 2. Project Information 2a. Name of project: Parkstone Place Subdivision 2b. County: Mecklenburg 2c. Nearest municipality / town: Charlotte 2d. Subdivision name: Parkstone Place 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: Parkstone South, LLC 3b. Deed Book and Page No. DB: 33190 Pg: 610, L11, M64-166 3c. Responsible Party (for LLC if applicable): Jeff Watson 3d. Street address: 568 Jetton Road, Suite 200 3e. City, state, zip: Davidson, NC 28036 3f. Telephone no.: (704) 895-2084 3g. Fax no.: 3h. Email address: watson@piedmontlanddevelopment.com Page 1 of 10 PCN Form — Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: Richard K. Mogensen 5b. Business name (if applicable): Mogensen Mitigation, Inc. 5c. Street address: 12051 Mourning Dove Lane or PO Box 690429 5d. City, state, zip: Charlotte, NC 28269 or Charlotte, NC 28227 5e. Telephone no.: (704) 576-1111 5f. Fax no.: 5g. Email address: rich@mogmit.com Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 17125220 1 b. Site coordinates (in decimal degrees): Latitude: 35.1498 Longitude: 80.8454 1 c. Property size: 2.74 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Little Sugar Creek 2b. Water Quality Classification of nearest receiving water: Class C 2c. River basin: Catawba 03 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: 30% Maintained lawn and 70% immature floodplain forest with two unnamed tributaries to Little Sugar Creek. Site surrounded by single family residences and a greenway. 3b. List the total estimated acreage of all existing wetlands on the property: 0 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 648 3d. Explain the purpose of the proposed project: Eight home single-family Subdivision 3e. Describe the overall project in detail, including the type of equipment to be used: The areas outside the floodplain and buffers will be graded with typical earthmoving equipment such as excavators, bulldozers, compacters etc. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (includingall prior phases)in the past? ❑ Yes ❑X No ❑ Unknown Comments: 4b. If the Corps made the jurisdictional determination, what type of determination was made? ❑ Preliminary ❑ Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? El Yes ❑X No ❑ Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ❑X No 6b. If yes, explain. Page 3 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Wetlands ❑X Streams — tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary T 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 - Choose one Choose one Yes/No - W2 - Choose one Choose one Yes/No W3 - Choose one Choose one Yes/No W4 - Choose one Choose one Yes/No W5 - Choose one Choose one Yes/No W6 - Choose one Choose one Yes/No 2g. Total Wetland Impacts: 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 P Culvert UT1 to Little Sugar Cr INT Corps 3 20 S2 T Excavation UT1 to Little Sugar Cr INT Corps 3 20 S3 - Choose one - S4 - Choose one - S5 - Choose one - S6 - Choose one - 3h. Total stream and tributary impacts 40 3i. Comments: Two impacts: one permanent associated with a culvert extension required by the City of Charlotte and one temporary for sewerline crossing. Page 4 of 10 PCN Form — Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then indivi ually list all open water impacts below. 4a. Open water impact number Permanent (P) or Temporary T 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 - Choose one Choose O2 - Choose one Choose 03 - Choose one Choose 04 - Choose one Choose 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? ❑ Neuse ❑ Tar -Pamlico ❑ Catawba ❑ Randleman ❑ Other: 6b. Buffer Impact number — Permanent (P) or Temporary T 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet) 6g. Zone 2 impact (square feet B1 - Yes/No B2 - Yes/No B3 - Yes/No B4 - Yes/No B5 - Yes/No B6 - Yes/No 6h. Total Buffer Impacts: 6i. Comments: Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Every effort was made to minimize permanent stream impacts. Due to the small DA a riprap dissapator will not be used. The sewerline crossing ROW and workspace has been minimized to the greatest extent practicable. Permanent impacts have been limited to 20 linear feet and temporary impacts will be only 20 linear feet. LIT2 to Little Sugar Creek will not be impacted. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. The sewer line must be installed using open cut due to bedrock. All temporarily disturbed areas outside the permanent sewer ROW will be restored using native seed mix and native hardwood trees planted at a density of 260 per ac. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes ❑X No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank El Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type: Choose one Type: Choose one Type: Choose one Quantity: Quantity: Quantity: 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non -riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. The impacts have been minimized to the greatest extent practicable and all temporary impacts will be restore using a native seed mix. The stream is intermittent and scores low on the NCSAM forms. See attached SAM and SWTIC Forms. Page 6 of 10 PCN Form — Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires ❑ Yes ❑ No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ❑X No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ❑ No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 29.45% 2b. Does this project require a Stormwater Management Plan? ❑X Yes ❑ No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: Stormwater Management Plan will be approved by the City of Charlotte. Sand filters will be installed and existing forest will be retained to manage stormwater runoff. 2e. Who will be responsible for the review of the Stormwater Management Plan? City of Charlotte 3. Certified Local Government Stormwater Review 3a. In which localgovernment's jurisdiction is thisproject? ❑X Phase II ❑ NSW 3b. Which of the following locally -implemented stormwater management programs ❑ USMP apply (check all that apply): ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been El Yes ❑X No attached? 4. DWQ Stormwater Program Review El Coastal counties ❑ HQW 4a. Which of the following state -implemented stormwater management programs apply ❑ORW (check all that apply): F-1 Session Law 2006-246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑X No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑X Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑X Yes ❑ No Page 8 of 10 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ❑ Yes ❑X No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, El Yes ❑X No or Riparian Buffer Rules (15A NCAC 2B.0200)? 2b. Is this an after -the -fact permit application? ❑Yes ❑X No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in F1 Yes ❑X No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. This project will hookup to existing City Sanitary sewer. Page 9 of 10 PCN Form — Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes ❑X No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ❑X No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. - 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS ESA List for Mecklenburg County includes Bald Eagle, Norther long-eared bat, Carolina heelsplitter, Rusty -patch bumble bee, Michaux's sumac, Schweinitz's sunflower and smooth coneflower. It is our professional opinion that there is no potential habitat for any of these species. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ❑X No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? Website Listing: NOAA Essential Fish Habitat Mapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ❑X No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? State Historic Preservation Office: http://gis.ncdcr.gov/hpoweb/ 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA -designated 100 -year floodplain? ❑ Yes ❑X No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? FEMA Flood Plain Maps for Mecklenburg County Applicant/Agent's Printed Name Date Applicant/Agent's Signature (Agent's signature is valid only if an authorization letter from the applicant isprovided.) Page 10 of 10