Loading...
HomeMy WebLinkAboutNCC190106_ESC Approval Submitted_20190424 STATE� Off'COOPER, L O M"f'YYr t y Sru;r ct<+e y �aw%ira S. DANIEL_SMITH NORM CdAROLINA InIol'im M(Cr.IeW I.,Aviranrn�entrat Quality April 2, 2019 LETTER OF APPROVAL WITH MODIFICA'FIONS Duke Energy Progress, LLC Attn: Mr. John R. Smith,Jr., Project Director 410 S. Wilmington Street Raleigh, NC 27601 RE: Project lame: HI1 Lee Ash Beneficiation Facility Acres Approved: 44.4 Project ID: Wayne-2018-03S County: Wayne City: Goldsboro Address: 1199 Black Jack Church Road River Basin: [reuse Date Received by LQS: March 1.9, 2019 Submitted By: Duke Energy Plan Type: Revised Tear Sir, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 413 .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO 1.0000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at dir�c_.goy/NCGOI. Please direct questions about the NOI form to Annette Lucas at. Annette.he� s iijicdenngov or Paul Clark at Paul,clai�lC ncdenr gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DIMLR will not charge a fee for coverage under the NCGOI permit. However, on or after May 1, 2019,. a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Norkh Car rafinaDeparlmentor"EriviTOTIIzn4'r1WIQLIa,lily _E lwrn'� �r«fC,rb�ryy VBirie•��! araa,M_da�dPYr,{auAe, s Wasl2kgCori RegionaI C)Hice . 9dJ tNa�Nbii�d��trr�5�r,N<ari. a9Gs1R 1 uJ,a Pss"r7rytrrrr +,rt�a C r rr6iatar�If 3a� 252 9 4h.6481, Title 15A NCAC 4B .01 18(a) and the NCGO1 permit require that the following documentation be kept on file at the,job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO I permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.I(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties, If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other pen-nit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended fion-n if there is any change in the infion-nation included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project, Please notify us if you plan to have a preconstruction conference, Sincerely, "T Samir Dumpor Regional Engineer cc w/o enc: John Smith, Duke Energy Progress, LLC(email) Steve Cahoon, Duke Energy Progress(email) Craig Daigle, PE, Zachry (email) WaRO Division of Water Resources The developer is responsible for the control of sediment on-site. If the approved erosion and sedimentation control measures prove insufficient, the developer must take those additional steps necessary to stop sediment from leaving this site (NCGS 113A-57(3)). Each sediment storage device must be inspected after each storm event (NCGS 113A- 54.1(e)). Maintenance and/or clean out is necessary anytime the device is at 50% capacity. All sediment storage measures will remain on site and functional until all grading and final landscaping of the project is complete (I 5A NCAC 04B 0 113). 2, The developer is responsible for obtaining all permits and approvals necessary for the development of this project prior to the commencement of this land disturbing activity. This could include our agency's Stormwater regulations and the Division of Water Resources' enforcement requirements within Section 401 of the Clean Water Act, the U.S. Army Corps of Engincers'jurisdiction of Section 404 of the Clean Water Act, the Division of Coastal Management's CAMA requirements, the Division of Solid Waste Management's landfill regulations, the Environmental Protection Agency and/or The U.S. Army Corps of Engineers jurisdiction of the Clean Water Act, local County or Municipalities' ordinances, or others that may be required. This approval cannot supersede any other permit or approval. 3. Adequate and appropriate measures must be properly installed downstream, within the limits of disturbance, of any land disturbing activity to prevent sediment from leaving the limits of disturbance,entering existing drainage systems, impacting an on- site natural watercourse or adjoining property, (NCGS 113A-57) PROJECT INFORMATION SHEET APPROVAL DATE: Aril 2, 2019 RESPONSIBLE PARTY: Duke Energy Progress, LLC PROJECT NAME: H.F. Lee Ash Beneficiation Facility COUNTY: Wayne NO.: Wa ne-2018-035 OFF-SITE BORROW AND/OR DISPOSAL SITE: NO.: START-UP DATE: CONTRACTOR: ON-SITE CONTACT: ON-SITE PHONE NO.: OFFICE PHONE NO.: COMPLETE & RETURN THIS FORM PRIOR TO THE START OF CONSTRUCTION TO: N.C.D.E.N.R. LAND QUALITY SECTION ATTN:James Edwards 943 WASHINGTON SQUARE MALL WASHINGTON, NORTH CAROLINA 27889 james.edwards@ncdenr.gav