Loading...
HomeMy WebLinkAboutNCC190106_NOI Application_20190424 Action History (UTC-05:00) Eastern Time(US&Canada) Submit by Anonymous User 4/24/2019 3:49:44 PM(NCG01 NOI Submission) Approve by Morman,Alaina 4/25/2019 1:57:01 PM(Review-Construction NOI 10388) • The task was assigned to Morman,Alaina by round robin distribution 4/24/2019 3:49 PM • The task was assigned to DEMLR NCG01 NOI Review Team.The due date is:April 26,2019 5:00 PM 4/24/2019 3:49 PM Submit by Morman,Alaina 4/25/2019 1:57:33 PM(Payment Verification-NCG01-2019-0106) • The task was assigned to Morman,Alaina.The due date is:April 26,2019 5:00 PM 4/25/2019 1:57 PM 1 sees �' � ••. -• i •• i i• i IY sell NORTH CAROLINA Ernvlronmental QUII A. Project Information Part A. Project Location and Waterbody Information 1. Project Name* HF Lee Ash Beneficiation Facility 2. County* Wayne 3. Highway or Street 1199 Black Jack Church Road Address* Street narra only is acceptable if no address nurrber assigned yet 4. City or Township* Goldsboro 5. State* INC 6.Zip Code* 27580 7. Latitude* Enter the latitude in decirral degrees 35.3712 8. Longitude* Enter the longitude in decirral degrees(MIST be negative) -78.0972 If you do not know the latitude and longitude coordinates for this project,you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 04/15/2019 Estimated Construction Project Start Date 10. Date to End* 12/31/2019 Estimated Construction Project End Date 11. SIC(Primary)* Other(0000) Standard Industrial aassification for Developrrent 12.Acres to be 2.50 disturbed* (including off-site borrow and waste areas) 13.Total site area 44.50 (acres)* 14. Post- 5.76 construction impervious area (acres)* NCC Project NCC-WAYNE-2019-HF Lee Ash Beneficiation Facility Tracking ID Assigned autorratically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. You may enter up to 3 waterbodies. 15a. Receiving Neuse River Wate rbody* Nacre of waterbody into which stormuater runoff will discharge 15b.Waterbody 27-(50.375) Index No.* NCWaterbody Index Nunber Stormwater rJ No discharges will flow r Yes to additional wate rs* 16a.Is this project r Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. Porrrittee Information-Legally Responsible Entity and Individual ..................................................................................................................................................................... Important:The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president,secretary,treasurer, or vice president,or a manager that is authorized in accordance with Part IV, Section B, Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV,Section B, Item(6)of that permit. 1.Organization Duke Energy Progress, LLC Name* 2. First Name* John ff Corporation,enter Registered Agent First l\brre 3. Last Name* Smith ff Corporation,enter Registered Agent Last Barre 4. Permitee E-mail bobby.smith@duke-energy.com Address* 5. Permittee 704.382.4738 Telephone No.* 6. Permittee Mailing Street Address Address* 400 South Tryon Street Address Line 2 City State/Province/Region Charlotte NC Fbstal/Zip Code Country 28202 US Check box if the V Yes street address the same as mailing address 7. Permittee Street Street Address Address* 400 South Tryon Street Address Line 2 City State/Province/Region Charlotte NC Postal/Zip Code Country 28217 us C. Site Contact Information Part C. Project Site Contact Information .................................................................................................................... 1.Type of Non-Government Ownership* 2. Primary Site James Contact-First Name* 3.Primary Site Johnson Contact-Last Name* 4.Title Project Manager 5.Site Contact E- johnsonjg@zachrygroup.com mail Address* 6.Site Contact 859.388.4223 Telephone No.* 7.Organization Zachry Construction Group Name 8.Site Contact Street Address Mailing Address* 1199 Black Jack Church Road Address Line 2 City State/Province/Region Goldsboro NC Fbstal/Zip Code Country 27530 us D. E&SC Plan Part D. Erosion&Sediment Control(E&SC)Ran Approval Information ............................................................................................................................................................ 1. Date E&SC Plan 04/02/2019 Approved* 2. E&SC Plan Project Wayne-2018-035 Number/ID* Assigned by agency or local program 3. E&SC Plan F State DEQ Office Approved by r Local Program 4. State DEQ Office* Washington(WaRO) Documentation of E&SC Plan approval and the signed Notice of Intent(NOI)Certification Form is required for a complete application. 5. E&SC Plan Wayne-2018-035 HF Lee Ash Beneficiation Facility- Approval 1.11 MB Revision-04022019.pdf letter/documentation Mist be RDF format 6. NOI Certification NCG01.pdf 46.31 KB Form Mist be RJFforrrat This is an Express F No Review Project* r Yes E. Certification North Carolina General Statute 143-215.613(1)provides that: Anyperson who knowinglymakes any false statement,representation,or certification in anyapplication,record,report,plan,or other documentfiled or required to be maintained under this Article or a rule implementing this Article;or who knowinglymakes a false statement of a material fact in a rulemaking proceeding or contested case under this Article;or who falsifies,tampers with,or knowingly renders inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars($10,000). Under penalty of law, I certify that: rJ I am the person responsible for the construction activities of this project,for satisfying the requirements of this permit,and for any civil or criminal penalties incurred due to violations of this permit. * rJ The information submitted in this NOI is,to the best of my knowledge and belief, true,accurate, and complete based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information. * I7 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s)and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent r Authorized Responsible Person* Important:The person who signs this Certification above and signs the NOI Certification Form should be the same person(or authorized responsible person within the same organization)as listed in Section B(Permittee Information) of this form. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president,secretary,treasurer, or vice president,or a manager that is authorized in accordance with Part IV, Section B, Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV,Section B, Item(6)of that permit. Signature ��ir �rrr�`� Type Name* John Smith Date* 04/24/2019 F. Tracking and COC Info NOI Tracking No. 10388 NC Reference No. NCG01-2019-0106 Uses'count_nunber variable(incremented by SP) Certificate of NCC190106 Coverage (COC) Uses'count_nunber'variable(increrrented bySP) No.* Count Number 106 Sequential nunber for subrrittal that is increrrented by Stored Procedure COC Year 2019 Year of date reviewed,used to assign YY digits after"NOC'in OOC no.)