HomeMy WebLinkAbout310122_Compliance Inspection_20181031U Division of Water Resources
11 Facility Number - ) z L O Division of Soil and Water Conservation
' O Other Agency
Type of Visit: OkwiffinpliAnee Inspection 0 Operation Review 0 Structure Evaluation O Technical Assistance
Reason for Visit: URoutine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access
Date of Visit: o J / / Arrival Time: Departure Time: / o County:
Farm Name:
Owner Name:
Mailing Address:
Physical Address:
Facility Contact:
Title:
Owner Email:
Phone:
OnsiteRepresentative: --r, Integrator:
Certified Operator:
Back-up Operator:
Location of Farm:
Swine
Latitude:
Phone:
Region:
Certification Number: ) 7 (O q Z
Certification Number:
Design Current Design Current
Capacity Pop. Wet Poultry Capacity Pop.
La er
Non -La er
Wean to Finish
Wean to Feeder
Feeder to Finish
Farrow to Wean
Farrow to Feeder
Farrow to Finish
Gilts
Boars
Other
Other
Discharges and Stream Impacts
I. Is any discharge observed from any part of the operation
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
b. Did the discharge reach waters of the State? (If yes, notify DWR)
c. What is the estimated volume that reached waters of the State (gallons)? _
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
2. Is there evidence of a past discharge from any part of the operation?
3. Were there any observable adverse impacts or potential adverse impacts to the waters
of the State other than from a discharge?
Longitude:
Design Current
Cattle Capacity Pop.
Dairy Cow
Dairy Calf
Dairy Heifer
Dry Cow
Non -Dairy
Beef Stocker
Beef Feeder
Beef Brood Cow
❑ Yes No ❑ NA ❑ NE
❑ Yes ❑ No
❑ Yes [:]No
❑ Yes ❑ N
❑ Yes No
❑Yes El No
❑ NA ❑ NE
❑ NA ❑ NE
❑ NA ❑ NE
❑ NA ❑ NE
❑ NA ❑ NE
Page I of 3 21412015 Continued
Facility N • ber: jDate of Inspection:
Waste Collection &Treatment
/ /
4 Is storage capacity (structural plus storm storage plus heavy rainfall) Tess than adequate?
,L/�Jf Yes
,L"f `/`io NA
❑
❑ NE
a. If yes, is waste level into the structural freeboard?
❑ Yes
❑ No ❑ NA
❑ NE
Structure 1 Structure 2 Structure 3 Structure 4
Structure 5
Structure 6
Identifies `Z .3
Spillway?:
Designed Freeboard (in):
Observed Freeboard (in): 2 7 r
5. Are there any immediate threats to the integrity of any of the structures observed?
❑ Yes
No ❑ NA
❑ NE
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
❑ Yes
No ❑ NA
❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental
hreat, notify DWR
7. Do any of the structures need maintenance or improvement?
❑Yes
I I N ❑ NA
❑ NE
8. Do any of the structures lack adequate markers as required by the permit?
❑ Yes
No ❑ NA
❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require
❑ Yes
V No ❑ NA
❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need
❑ Yes
dNo ❑ NA
❑ NE
maintenance or improvement?
11 Is there evidence of incorrect land application? If yes, check the appropriate box below.
❑ Yes
No ❑ NA
❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals
(Cu, Zn, etc.)
❑ PAN ❑ PAN> 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge
into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s):
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP?
❑ Yes
V1 No ❑ NA
❑ NE
15. Does the receiving crop and/or land application site need improvement?
❑Yes
Na—❑ NA
❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable
❑ Yes
No ❑ NA
❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application?
El yes Yes
❑ NA
❑ NE
18. Is there a lack of properly operating waste application equipment?
❑ Yes
No ❑ NA
❑ NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
❑ Yes
❑ NA
❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
❑ Yesg:No
No ❑ NA
❑ NE
the appropriate box.
❑WUP ❑Checklists ❑Design ❑Maps ❑Lease Agreements ❑Other.
21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and l" Rainfall Inspections Sludge Survey
22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No ❑ NA ❑ NEB
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA 0 NE
Page 2 of 3 21412015 Continued
Facill Nu ber:C5 ( -fzzaJ-
jDate of Inspection: Q 3) /
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check es ❑ No ❑ NA ❑ NE
the appropriate box(es) below.
❑ Faa to complete annual sludge survey [:]Failure to develop a POA for sludge levels
Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes No ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No NA ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fad to notify the Regional Office of emergency situations as required by the
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP?
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative?
34. Does the facility require a follow-up visit by the same agency?
❑ Yes El No ❑ NA ❑ NE
❑ Yes ❑ o ❑ NA ❑ NE
❑ Yes �❑ NA ❑ NE
❑ Yes ❑ No ❑ NA B
❑ Yes
❑ Yes
❑ Yes
�❑ NA ❑ NE
❑ NA ❑ NE
❑ No ❑ NA ❑ NE
omments (refeglto question #): Explain any YES answers and/or any additional,recommendations or any other comments.
Use drawings of facility to better explain situations (use; additional pages as necessary).
e-\ r�fC a�0(S
Reviewerfinspector Name:
Reviewer/Inspector Signature:
r t(2,_�It
Phone: C7 �o 7Y6 7344
Date: \n -3 ( ,
Page 3 of 3
2J412015