HomeMy WebLinkAbout310113_Compliance Inspection_20180328W Division of Water Resources
Facility Number 5J - M31 O Division of Soil and Water Conservation
O Other Agency
Reason for Visit: ;St Routine O Complaint O Follow-up O Referral O Emergency O Oth`eer O Denied Access (�
Date of Visit: II,,11 Arrival Time: rL L1 J �J DII.I11leeparture Time: County: {/� 1/ i Region: W l 1, D
Farm Name: W S /� ` Zcrrr 'L Owner Email:
Owner Name:
Mailing Address:
Physical Address:
Facility Contact:
Onsite Representative: _ Gi Y-e" tfV m w-,Q
Certified Operator: I(,,1I,e CN+Ny-
Back-up Operator:
Location of Farm:
Swine
Wean to Finish
Wean to Feeder
Feeder to Finish
Farrow to Wean
Farrow to Feeder
Farrow to Finish
Other
Other
Phone:
Title:
Latitude:
Phone:
Integrator:
Certification Number: T1 L45 47
Certification Number:
Design Current Design Current
Capacity Pop. Wet Poultry Capacity Pop.
NNon--
La er
Design Current
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation?
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
b Did the discharge reach waters of the State? (If yes, notify DWR)
c. What is the estimated volume that reached waters of the State (gallons)?
d Does the discharge bypass the waste management system? (If yes, notify DWR)
2. Is there evidence of a past discharge from any part of the operation?
3. Were there any observable adverse impacts or potential adverse impacts to the waters
of the State other than from a discharge?
Longitude:
Design Current
Cattle Capacity Pop.
Dairy Cow
Dairy Calf
Dairy Heifer
Dry Cow
Non -Dairy
Beef Stocker
Beef Feeder
Beef Brood Cow
❑ Yes 0 ' 0 ❑ NA ❑ NE
❑ Yes ❑ No ❑ NA ❑ NE
❑ Yes ❑ No ❑ NA ❑ NE
❑ Yes
❑ No
❑ NA
❑ NE
❑ Yes
W1,o
❑ NA
❑ NE
❑ Yeso
❑ NA
❑ NE
Page I of 21412015 Continued
Facie 1Number: Date of inspection:
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate?
❑ Yes
19 No
❑ NA
❑ NE
a. If yes, is waste level into the structural freeboard?
❑ Yes
❑ No
❑ NA
❑ NE
Structure 1 Structure 2 Structure 3 Structure 4
Identifier:
Structure 5
Structure 6
Spillway?:
Designed Freeboard (in):
Observed Freeboard (in):
5. Are there any immediate threats to the integrity of any of the structures observed?
❑ Yes
4 No
❑ NA
❑ NE
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
❑ Yes
E,'JNo
❑ NA
❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR
7. Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes allo ❑ NA ❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require ❑ Yes �No ❑ NA ❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need
❑ Yes
No
❑ NA
❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below.
❑ Yes
No
❑ NA
❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate
Manure/Sludge
into
Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
A PO
W I 12. Crop Type(s): h 1141 -atl 0 17
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP?
❑ Yes
[M No
❑ NA
❑ NE
15. Does the receiving crop and/or land application site need improvement?
❑ Yes
No
❑ NA
❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable
❑ Yes
No
❑ NA
❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application?
❑ Yes
[�No
❑ NA
❑ NE
18. Is there a lack of properly operating waste application equipment?
❑ Yes
[VNo
❑ NA
❑ NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
❑ Yes
W No
❑ NA
❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
❑ Yes
U No
❑ NA
❑ NE
the appropriate box.
❑ WET ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other:
21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes M7No ❑ NA ❑ NE
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey
22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No ❑ NA ❑ NE
23. If selected, did the facility fail to install and maintain minbreakers on irrigation equipment? ❑ Yes gNo ❑ NA ❑ NE
Page 2 of 21412015 Continued
Facili 1Number: Date of Inspection:
A. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes o ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes No ❑ NA ❑ NE
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes 0I0 ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No 1`170NA ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes No ❑ NA ❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes No ❑ NA ❑ NE
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
❑ Yes
OdNo
❑ NA
❑ NE
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface file drains exist at the facility? If yes, check the appropriate box below.
❑ Yes
�M No
❑ NA
❑ NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CA\VW?
❑ Yes
1� No
❑ NA
❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative?
❑ Yes
[ ] No
❑ NA
❑ NE
34. Does the facility require a follow-up visit by the same agency?
❑ Yes
No
❑ NA
❑ NE
Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations (us/e� additional pages as necessary).
['Dw l✓1 "Ctu�S Q�' ?le�� — �(s Gt P �WYt�hlcv
0"9� C fs sA heceY�' S.
Reviewer/Inspector Name:
Reviewer/Inspector Signature:
Page 3 of 3
, U,,
Phone:
Date: L
21412015