HomeMy WebLinkAbout310066_Sludge Survey (Testing Dates)_20180911ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
LINDA CULPEPPER
Interim Director
Charles W. Edwards
Cedar Lane Farms
605 Fountaintown Rd
Beulaville, NC 28518
Dear Charles W. Edwards
RECEIVED/NCDENR/MR
NORTH CAROLINA SEP 1 1 2018
Environmental Quality
Water Quality Regional
Operations Section
Wilmington Replonal Office
September 7, 2018
Subject: Sludge Survey Testing Dates
Certificate of Coverage No. AWS310066
Cedar Lane Farms
Animal Waste Management System
Duplin County
The Division of Water Resources (Division) received your sludge survey information on August
16, 2018. With the survey results, you requested an extension of the sludge survey requirement
for Lagoon #2 Small at Cedar Lane Farms facility. Due to the amounts of treatment volume
available, the Division agrees that a sludge survey is not needed until December 31, 2022 for
Lagoon #2 Small only.
The next sludge survey for Lagoon #2 Small at Cedar Lane Farms should be performed before
December 31, 2022. Please retain this letter and keep it with your farm records for reference.
Please call me at 919) 707-3665if you have any questions.
Sincerely,
.�L ckruzvl/. ��aen„es
Miressa D. Garoma
Animal Feeding Operations Program
cc: W.ilpringto�-gional Office, —Water' ualiRegional_ __perations_S`ctiolr
Permit File AWS310066
North Carolina Department of Environmental Quality I Division of Water Resources IAFOGW Section
512 North SalisburyStreet 11636 Mad Service Center I Raleigh, North Carolina 27699-1636
919.707.9129
NCDEQ - DMslon of Water Resources
Water Quality Regional Operations Section
1636 Mail Service Center
Wm R.- Raleigh, NC 27699-1636
Wilmington Regional Office
DWR-WQROS
127 Cardinal Drive Ext.
Wilmington, NC 27406
Courier#04-16-33