HomeMy WebLinkAbout310352_30 day POA Incident # 201900836_20190423PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 31-352 County: Duplin
Facility Name: Twin Oaks Farm
Certified Operator Name: Tony James
Operator Number: 1002221
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
Lagoon Name/ID: TO-B(S)
Spillway(Y or N): N
Level(inches): 40
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
*Attach a complete schedule with corresponding animal units and dates fro depopulation
*if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: As weather and field conditions allow
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
Greer Moore for:
Tony James Phone: 910-271-0067
Facility Owner/Manager (print)
Tony James
Facility Owner/Manager (signature)
Date: 4/21/2019
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID:
2. Structure ID:
3. Structure ID:
4. Structure ID:
5. Structure ID:
6. Structure ID:
TO- Back (S)
n. lines 1 +2+3+4+5+6=
line m = Ib PAN
line m = Ib PAN
line m = 253.0 Ib PAN
line m = Ib PAN
line m = Ib PAN
line m = Ib PAN
253.0 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
O. tract #
p. field #
q. crop
r. acres
s. remaining IRR-
2 PAN balance
(Ib/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (Ibs.)
column r x s
u. application window
TO
F 1
BP
14.81
244.00
3613.6
3/01-9/30
TO
F2
BP
10.16
244.00
2479.0
3/01-9/30
TO
F3
BP
9.06
244.00
2210.6
3/01-9/30
TO
F4
FP
7.82
130.00
1016.6
8/01-7/31
TO
F5
BP
5.12
244.00
1249.3
3/01-9/30
State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) =
IV. FACILITY'S PoA OVERALL PAN BALANCE
10569.2 lb. PAN
w. Total PAN to be land applied (line n from section II) = 253.0 Ib. PAN
PoA (30 Day) 2/21/00
x. Crop's remaining PAN balance (line v from section III) = 10569.2 Ib. PAN
y. Overall PAN balance (w - x) =
-10316 lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
NARRATIVE:
TO ( Front Lagoon) was 36" prior Hurricane Florence, then 7" after storm. TO (Back -Primary) lagoon was 37"
prior to Hurricane Florence, then 6" after strom. TO (Back -Secondary) lagoon was 65" prior to Hurricane
Florence, then 37" after the storm, this lagoon (TO -Back (Secondary) requires a 42" start pump. TO (Back -
Inactive lagoon) was 35" prior to Hurricane Florence, then after storm was 8". The inactive lagoon has not been
closed out to NRCS Standard, and has been kept open and maintained for emergency purposes only. The front
lagoon and the back (secondary lagoon) are the only 2 lagoons irrigated from. Water from the TO (back -
primary lagoon), and the TO- Back (Inactive lagoon); is transfered to the TO (Back -secondary) lagoon
for irrigating, and transfer of waste is recorded and kept in farm records. All animal waste transfer records are
kept with farm records.
DWR-WiRO was notified of high lagoon levels after Hurricane Florence.
PoA (30 Day) 2/21/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID):
TO- Back (S)
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) =
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
g. volume of waste produced according to structural design
h. current herd #
1200
certified herd #
40.0
42.0
inches
inches
2.0 inches
67500
ft2
84150 gallons
180
19780
1200
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated
m. ((lines e + k)/1000) x line I =
3/14/2019
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
days
ft3
19780 fti
0
83265
ft3
ft3
128463 gallons
1.19
Ibs/1000 gal.
253.0 Ibs. PAN
PoA (30 Day) 2/21/00