Loading...
HomeMy WebLinkAboutNCG170392_NOV_20190424ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH interim Director NORTH CAROLINA Environmental Quality April 24, 2019 CERTIFIED MAIL: 70171070 0000 17761760 Janesville Acoustics Attention: Christina Waldrup Post Office Box 1209 Old Fort, North Carolina 28762 Subject: NOTICE OF VIOLATION (NOV-2019-PC-0270) NPDES Stormwater General Permit NCG170000 Janesville Acoustics, Certificate of Coverage NCG170392 McDowell County, North Carolina Dear Ms. Waldrup: On March 28, 2019, Isaiah Reed from the Asheville Regional Office of the Division of Energy, Mineral and Land Resources (DEMLR), conducted a site inspection for the Janesville Acoustics facility located at 157 Lackey Town Road, McDowell County, North Carolina. A copy of the Compliance Inspection Report is enclosed for your review. The site visit and file review revealed that the subject facility is covered by NPDES Stormwater General Permit NCG170000 under Certificate of Coverage NCG170392. Permit coverage authorizes the discharge of stormwater from the facility to receiving waters designated as the Catawba River, a Class C waterbody in the Catawba River Basin. As a result of the site inspection, the following permit conditions violations are noted: 1) Stormwater Pollution Prevention Plan (SPPP) The Stormwater Pollution Prevention Plan (SPPP) has not been properly implemented. 2) Good Housekeeping Waste material from the industrial process was observed around the facility in several locations, in the stormwater system, and at the outfall. D_E Q�� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 w Awwaro\ �� 828.296.4500 Notice of Violations Janesville Acoustics Page 2 of 2 Requested Response: You are asked to respond to this office, in writing, within 30 calendar days from receipt of this notice. Your written response should include a reasonable explanation as to why the aforementioned violation(s) have occurred as well as a Plan of Action to prevent these violation(s) from recurring. Thank you for your attention to this matter. This Office is considering sending a recommendation for enforcement to the Director of the Division of Energy, Mineral & Land Resources regarding these issues. Your above -mentioned response to this correspondence will be considered in this process. This office requires that the violations, as detailed above, be properly resolved. These violations and any future violations are subject to a civil penalty assessment of up to $25,000 per day for each violation. Should you have any questions regarding these matters, please contact Isaiah Reed or myself at (828) 296- 4500. Sincerely, Stanley E. pEcA Regional Engineer Land Quality Section Enclosure: Inspection Report cc: Alaina Morman, Environmental Specialist Alaina.morman@ncdenr.gov Stanley E. Aiken- Regional Engineer stan.aikenknedenr.gov Suzanne McCoy, Administrative Specialist Suzanne.mccoy a�ncdenr.gov Compliance Inspection Report Permit: NCG170392 Effective: 10/02/14 Expiration: 07/31/19 Owner: Janesville Acoustics SOC: Effective: Expiration: Facility: Janesville Acoustics county: McDowell 157 Lackey Town Rd Region: Asheville Old Fort NC 28762 Contact Person: Roy Heeralall Title: Phone: 828-668-9254 Directions to Facility: North on exit 73 from 140 at 2nd loght make immediate right to to 2nd stop sign and Janesville Products is on left. System Classifications: Primary ORC: Certification: Phone: li Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 0312812019 Entry Time: 09:OOAM Exit Time: 10:30AM Primary Inspector: Isaiah L Reed Phone: 828-2964614 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Textile Mill Products Stormwater Discharge COC Facility Status: ❑ Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG170392 Owner• Facility: Janesville Acoustes Inspection Date: 03/28/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: On March 28, 2019 this facility was inspected for compliance. I met with Christina Waldroup on site. During the inspection, the following items were noted: 1) The SWPPP has been updated and reviewed. 2) Qualitative monitoring had not yet been conducted since previous visit. 3) Waste material from the industrial process was observed around the facility, in the stormwater system, and at the outfall. The permittee is directed to immediately develop a plan to improve the industrial process on site, and re-evaluate the good -housekeeping measures to prevent excessive waste material from leaving the facility and impacting stormwater. Please give the above items your immediate attention. If you have any questions, please contact this office at (828) 296-4614 Page 2 of 3 Permit: NCG170392 Owner- Facility: Janesville Acoustics Inspection Date: 03/28/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? 0 ❑ ❑ ❑ # Does the Plan include a BMP summary? 0 ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? 0 ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ ❑ ❑ # Does the facility provide and document Employee Training? 0 ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ 0 ❑ ❑ Comment: Waste material from the industrial process was observed around this facility in various locations. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑0 ❑ ❑ Comment: Scheduled to be done in May. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ ❑ Comment Page 3 of 3