HomeMy WebLinkAboutNCG170392_NOV_20190424ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. DANIEL SMITH
interim Director
NORTH CAROLINA
Environmental Quality
April 24, 2019
CERTIFIED MAIL: 70171070 0000 17761760
Janesville Acoustics
Attention: Christina Waldrup
Post Office Box 1209
Old Fort, North Carolina 28762
Subject: NOTICE OF VIOLATION (NOV-2019-PC-0270)
NPDES Stormwater General Permit NCG170000
Janesville Acoustics, Certificate of Coverage NCG170392
McDowell County, North Carolina
Dear Ms. Waldrup:
On March 28, 2019, Isaiah Reed from the Asheville Regional Office of the Division of
Energy, Mineral and Land Resources (DEMLR), conducted a site inspection for the
Janesville Acoustics facility located at 157 Lackey Town Road, McDowell County, North
Carolina. A copy of the Compliance Inspection Report is enclosed for your review. The site
visit and file review revealed that the subject facility is covered by NPDES Stormwater
General Permit NCG170000 under Certificate of Coverage NCG170392. Permit coverage
authorizes the discharge of stormwater from the facility to receiving waters designated as
the Catawba River, a Class C waterbody in the Catawba River Basin.
As a result of the site inspection, the following permit conditions violations are noted:
1) Stormwater Pollution Prevention Plan (SPPP)
The Stormwater Pollution Prevention Plan (SPPP) has not been properly implemented.
2) Good Housekeeping
Waste material from the industrial process was observed around the facility in several
locations, in the stormwater system, and at the outfall.
D_E Q�� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778
w Awwaro\ �� 828.296.4500
Notice of Violations
Janesville Acoustics
Page 2 of 2
Requested Response:
You are asked to respond to this office, in writing, within 30 calendar days from receipt of
this notice. Your written response should include a reasonable explanation as to why the
aforementioned violation(s) have occurred as well as a Plan of Action to prevent these
violation(s) from recurring.
Thank you for your attention to this matter. This Office is considering sending a
recommendation for enforcement to the Director of the Division of Energy, Mineral & Land
Resources regarding these issues. Your above -mentioned response to this correspondence
will be considered in this process. This office requires that the violations, as detailed
above, be properly resolved. These violations and any future violations are subject to
a civil penalty assessment of up to $25,000 per day for each violation. Should you have
any questions regarding these matters, please contact Isaiah Reed or myself at (828) 296-
4500.
Sincerely,
Stanley E. pEcA
Regional Engineer
Land Quality Section
Enclosure: Inspection Report
cc: Alaina Morman, Environmental Specialist Alaina.morman@ncdenr.gov
Stanley E. Aiken- Regional Engineer stan.aikenknedenr.gov
Suzanne McCoy, Administrative Specialist Suzanne.mccoy a�ncdenr.gov
Compliance Inspection Report
Permit: NCG170392 Effective: 10/02/14 Expiration: 07/31/19 Owner: Janesville Acoustics
SOC: Effective: Expiration: Facility: Janesville Acoustics
county: McDowell 157 Lackey Town Rd
Region: Asheville
Old Fort NC 28762
Contact Person: Roy Heeralall Title: Phone: 828-668-9254
Directions to Facility:
North on exit 73 from 140 at 2nd loght make immediate right to to 2nd stop sign and Janesville Products is on left.
System Classifications:
Primary ORC: Certification: Phone:
li Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 0312812019 Entry Time: 09:OOAM Exit Time: 10:30AM
Primary Inspector: Isaiah L Reed Phone: 828-2964614
Secondary Inspector(s):
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Textile Mill Products Stormwater Discharge COC
Facility Status: ❑ Compliant Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page 1 of 3
Permit: NCG170392 Owner• Facility: Janesville Acoustes
Inspection Date: 03/28/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
On March 28, 2019 this facility was inspected for compliance. I met with Christina Waldroup on site. During the inspection,
the following items were noted:
1) The SWPPP has been updated and reviewed.
2) Qualitative monitoring had not yet been conducted since previous visit.
3) Waste material from the industrial process was observed around the facility, in the stormwater system, and at the outfall.
The permittee is directed to immediately develop a plan to improve the industrial process on site, and re-evaluate the
good -housekeeping measures to prevent excessive waste material from leaving the facility and impacting stormwater.
Please give the above items your immediate attention.
If you have any questions, please contact this office at (828) 296-4614
Page 2 of 3
Permit: NCG170392 Owner- Facility: Janesville Acoustics
Inspection Date: 03/28/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
❑ ❑ ❑
# Does the Plan include a General Location (USGS) map?
❑ ❑ ❑
# Does the Plan include a "Narrative Description of Practices"?
❑ ❑ ❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
0 ❑ ❑ ❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
❑ ❑ ❑
# Has the facility evaluated feasible alternatives to current practices?
❑ ❑ ❑
# Does the facility provide all necessary secondary containment?
0 ❑ ❑ ❑
# Does the Plan include a BMP summary?
0 ❑ ❑ ❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
0 ❑ ❑ ❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
0 ❑ ❑ ❑
# Does the facility provide and document Employee Training?
0 ❑ ❑ ❑
# Does the Plan include a list of Responsible Party(s)?
❑ ❑ ❑
# Is the Plan reviewed and updated annually?
❑ ❑ ❑
# Does the Plan include a Stormwater Facility Inspection Program?
❑ ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented?
❑ 0 ❑ ❑
Comment: Waste material from the industrial process was observed around this facility
in various locations.
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? ❑0 ❑ ❑
Comment: Scheduled to be done in May.
Permit and Outfalls
Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site?
0 ❑ ❑ ❑
# Were all outfalls observed during the inspection?
0 ❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division?
❑ ❑ ❑
# Has the facility evaluated all illicit (non stormwater) discharges?
❑ ❑ ❑
Comment
Page 3 of 3