Loading...
HomeMy WebLinkAbout20181368 Ver 2_USACE Notice of Incomplete PCN_20190424Strickland, Bev From: Roden Reynolds, Bryan K CIV (US) < Bryan.K.RodenReynolds@usace.army.mil > Sent: Wednesday, April 24, 2019 1:03 PM To: nbass@pike.com Cc: Homewood, Sue Subject: [External] SAW-2018-01935_Surry-Yadkin Electric Membership Corporation (Notice of Incomplete Pre -Construction Notification) Attachments: WestDblCrk_agent_auth_EROC.pdf, WestDblCrk_agent_auth_Pike.pdf Importance: High CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov<maiIto: report.spam@nc.gov> Mr. Bass, On April 1, 2019, we received the Pre -Construction Notification you submitted on behalf of Surry-Yadkin Electric Membership Corporation on a property located in Stokes County, North Carolina. I have completed my initial review of the report and I have determined that it is incomplete. The following information is necessary before I will issue a determination: a. The Agent Authorization forms for EROC and Pike (see attached) were not signed and dated. Therefore, please provide signed and dated Agent Authorization forms. b. Avoidance and minimization has not be clearly demonstrated. A Nationwide Permit 14 was originally issued on October 19, 2018, for 120 linear feet of permanent stream impacts from multiple culvert crossings to facilitate the development of an electric transmission line. The revised PCN submitted on April 1st is now requesting 252 linear feet of permanent stream impacts for the same amount of stream crossings. Provide justification and reasoning why these additional impacts are needed and why the impacts have increased from previously permitted. c. While each stream crossing can be considered a single and complete project under Nationwide Permit 14, those impacts are considered cumulative for the entire project. As stated in Regional General Condition 3.2 "For any NWP that results in a loss of more than 150 linear feet of stream, the permittee shall provide a mitigation proposal to compensate for more than minimal individual and cumulative adverse impacts to the aquatic environmental." Therefore, please provide a Compensatory Mitigation Plan for the 252 linear feet of permanent stream impacts associated with this proposed project. In addition, please provide a copy of the Mitigation Acceptance Letter from the Division of Mitigation Services. Please provide the information requested above in ONE consolidated response within 30 -days of the date of this correspondence. If you do not respond within 30 -days, the request will be administratively canceled. Please contact me via telephone or e-mail if you have any questions. Thanks, Bryan Roden -Reynolds, WPIT Regulatory Project Manager U.S. Army Corps of Engineers Charlotte Regulatory Office 8430 University Executive Park Drive Charlotte, NC 28262 Office: (704)510-1440 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 IaTe1�►11>�Ij��[�1;;i�►.�=y>![i�►17���'rl PROPERTY LEGAL DESCRIPTION: Surry Yadkin Electric Membership Corporation's Westfield Double Creek 100kV Transmission Line ROW Please print: Contractor: Pike Engineering, LLC The undersigned, registered property owners of the above noted property, do hereby authorize Carson Dellinger/ Jared Woolsey , of_ Environmental Resources of the Carolinas, Inc (Contractor / Agent) (Name of consulting firm) to act on my behalf and take all actions necessary for the processing, issuance and acceptance of this permit or certification and any and all standard and special conditions attached. Contractor's Address : 123 N. White Street, Fort Mill, SC 29715 Telephone: (803)835-7929 We hereby certify the above information submitted in this application is true and accurate to the best of our knowledge. Authorized Signature Authorized Signature Date: Date: INW11111U1111:14 ;;i�►.Cy>!010919 rl PROPERTY LEGAL DESCRIPTION: Westfield—Double Creek 100kV Transmission Line ROW Please print: Property Owner: Surry-Yadkin Electric Membership Corporation Property Owner: The undersigned, registered property owners of the above noted property, do hereby authorize of Pike Engineering, LLC (Contractor / Agent) (Name of consulting firm) to act on my behalf and take all actions necessary for the processing, issuance and acceptance of this permit or certification and any and all standard and special conditions attached. Property Owner's Address (if different than property above): 510 S. Main Street.. Dobson. NC 27017 Telephone: (336356-5249 We hereby certify the above information submitted in this application is true and accurate to the best of our knowledge. Authorized Signature Authorized Signature Date: Date: