HomeMy WebLinkAbout20181368 Ver 2_USACE Notice of Incomplete PCN_20190424Strickland, Bev
From: Roden Reynolds, Bryan K CIV (US) < Bryan.K.RodenReynolds@usace.army.mil >
Sent: Wednesday, April 24, 2019 1:03 PM
To: nbass@pike.com
Cc: Homewood, Sue
Subject: [External] SAW-2018-01935_Surry-Yadkin Electric Membership Corporation (Notice of
Incomplete Pre -Construction Notification)
Attachments: WestDblCrk_agent_auth_EROC.pdf, WestDblCrk_agent_auth_Pike.pdf
Importance: High
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an
attachment to report.spam@nc.gov<maiIto: report.spam@nc.gov>
Mr. Bass,
On April 1, 2019, we received the Pre -Construction Notification you submitted on behalf of Surry-Yadkin Electric
Membership Corporation on a property located in Stokes County, North Carolina. I have completed my initial review of
the report and I have determined that it is incomplete. The following information is necessary before I will issue a
determination:
a. The Agent Authorization forms for EROC and Pike (see attached) were not signed and dated. Therefore, please
provide signed and dated Agent Authorization forms.
b. Avoidance and minimization has not be clearly demonstrated. A Nationwide Permit 14 was originally issued on
October 19, 2018, for 120 linear feet of permanent stream impacts from multiple culvert crossings to facilitate the
development of an electric transmission line. The revised PCN submitted on April 1st is now requesting 252 linear feet of
permanent stream impacts for the same amount of stream crossings. Provide justification and reasoning why these
additional impacts are needed and why the impacts have increased from previously permitted.
c. While each stream crossing can be considered a single and complete project under Nationwide Permit 14, those
impacts are considered cumulative for the entire project. As stated in Regional General Condition 3.2 "For any NWP that
results in a loss of more than 150 linear feet of stream, the permittee shall provide a mitigation proposal to compensate
for more than minimal individual and cumulative adverse impacts to the aquatic environmental." Therefore, please
provide a Compensatory Mitigation Plan for the 252 linear feet of permanent stream impacts associated with this
proposed project. In addition, please provide a copy of the Mitigation Acceptance Letter from the Division of Mitigation
Services.
Please provide the information requested above in ONE consolidated response within 30 -days of the date of this
correspondence. If you do not respond within 30 -days, the request will be administratively canceled. Please contact me
via telephone or e-mail if you have any questions.
Thanks,
Bryan Roden -Reynolds, WPIT
Regulatory Project Manager
U.S. Army Corps of Engineers
Charlotte Regulatory Office
8430 University Executive Park Drive
Charlotte, NC 28262
Office: (704)510-1440
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete the Customer Satisfaction Survey located at
http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0
IaTe1�►11>�Ij��[�1;;i�►.�=y>![i�►17���'rl
PROPERTY LEGAL DESCRIPTION:
Surry Yadkin Electric Membership Corporation's Westfield Double Creek 100kV Transmission Line ROW
Please print:
Contractor: Pike Engineering, LLC
The undersigned, registered property owners of the above noted property, do hereby authorize
Carson Dellinger/ Jared Woolsey , of_ Environmental Resources of the Carolinas, Inc
(Contractor / Agent) (Name of consulting firm)
to act on my behalf and take all actions necessary for the processing, issuance and acceptance of
this permit or certification and any and all standard and special conditions attached.
Contractor's Address :
123 N. White Street, Fort Mill, SC 29715
Telephone: (803)835-7929
We hereby certify the above information submitted in this application is true and accurate to the
best of our knowledge.
Authorized Signature Authorized Signature
Date: Date:
INW11111U1111:14 ;;i�►.Cy>!010919 rl
PROPERTY LEGAL DESCRIPTION:
Westfield—Double Creek 100kV Transmission Line ROW
Please print:
Property Owner: Surry-Yadkin Electric Membership Corporation
Property Owner:
The undersigned, registered property owners of the above noted property, do hereby authorize
of Pike Engineering, LLC
(Contractor / Agent) (Name of consulting firm)
to act on my behalf and take all actions necessary for the processing, issuance and acceptance of
this permit or certification and any and all standard and special conditions attached.
Property Owner's Address (if different than property above):
510 S. Main Street.. Dobson. NC 27017
Telephone: (336356-5249
We hereby certify the above information submitted in this application is true and accurate to the
best of our knowledge.
Authorized Signature
Authorized Signature
Date: Date: