Loading...
HomeMy WebLinkAbout310178_Structure Evaluation_20181001II i U Division of Water Resources 4cility Number EZ= - 57-571 O Division of Soil and Water Conservation O Other Agency Visit: O Compliance Ins for Visit O Routine O Structure Evaluation O Technical Assistance Referral O Emergency O Other O Denied Access Date of Visit: =VWArrival Time: Departure Time: County: Farm Name. Owner Name: Mailing Address: Physical Address: Owner Email: Phone: Facility Contact: Title: Onsite Representative: (—%ey—.5 1 19 / � / /l/P_� Certified Operator: Back-up Operator: Location of Farm: Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Other Other Latitude: Phone: Integrator: Certification Number: Certification Number: Longitude: Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. IN Non-- La er Other Design Current Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? _ d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? Region: Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow ❑ Yes Z No ❑ NA ❑ NE ❑ Yes ❑ No ❑ Yes ❑ No ❑NA ❑NE ❑ NA ❑ NE ❑ Yes FNo ❑ NA ❑ NE ❑Yes ❑ NA ❑ NE ❑ Yes❑ NA ❑ NE Page I of 21412015 Continued Facili Number: Date of Inspection: 2 D k- Wnste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Identifier - Structure 5 Structure 6 Spillway?: Designed Freeboard (in): Observed Freeboard (in): �1) �� 5 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an Immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? [:]Yes ❑ No ❑ NA E] wE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes ❑ No ❑ NA NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ❑ No ❑ NA IE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes [—]No ❑ NA maintenance or improvement? 77 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ❑ No ❑ NA ❑ NEE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes [—]No ❑ NA LJ;E 16. Did the facility fad to secure and/or operate per the irrigation design or wettable ❑ Yes ❑ No ❑ NA LJ N� acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes ❑ No ❑ NA NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ❑ No ❑ NA Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ❑ No ❑ NA E Nc 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ❑ No ❑ NA C3 NEE the appropriate box. ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑'NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ❑ No ❑ NA ❑N79' 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA IE Page 2 of 3 21412015 Continued Facili Plumber: jDate of Inspection: 24 Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ❑ No ❑ NA [�IE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes [-]No ❑ NA DINE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fad to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? Ifyes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: ❑ Yes ❑ No ❑ NA [g NNE ❑ Yes ❑ No ❑ NA IE ❑ Yes ❑ No ❑ NA [ NE ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA LCJ r ❑ Yes ❑ No ❑ NA E PdE 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA D'NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑� 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA EINE Reviewer/Inspector Signature: Page 3 of 3 P, Date: 19 S 11K 214,12015