HomeMy WebLinkAboutNCG020933_Mining Permit Application Review Form DWR_20190425Print this form to PDF Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee.
MINING PERMIT APPLICATION REVIEW FORM
for the
DIVISION OF WATER RESOURCES
Project Name Sandhorn Mine DEMLR Permit
pnorrisPntengineers. com
PERMIT ACTION TYPE: New
YES
Have land disturbing activities
started? Date?
Latitud 34.0090 Longitude:-78.6620
County Brunswick Applicant's Email: Phil Norris
NO
J
Please return comments to (at DEMLR CO): Judy Wehner
Comments due by: May 11,2018
SECTION BELOW TO BE FILLED OUT BY DWR:
Date Commencing
Is the RO concerned that the operation, as proposed, would violate standards of water quality? Yes
Comments: The area to be mined appears to be completely surrounded by wetlands. Please use BMP's to
maintain water quality
Watershed/Stream Name & Classification: Lumber Basin/Waccamaw River- Class C:Sw
DWR Compliance Status of Mine: Compliant
Does this mine (or previous owner) have DWR back fees to pay? If yes, amount:
Is this mine an active permit in BIMS? NO
YES NO
401 Wetland Cent. required?
rV
401 Wetland Cert. existing?
Permit#
r
Does DWR RO have enough information to
determine if a 401 certification is required?
R
Is an O & M Plan needed? YES NO
Are wetlands disturbed at this site? r._ I' Not according to app
Does DWR RO suspect or know of nearby Fv- F
wetlands to the site?
Rev Sanfemhgr 9nin
Print this form to PDF Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU- Send a copy to the permiltee.
JD
Is a wetland delineation required prior to
Consultant
DWR issuing the permit?
Onsite?
Offsite?
Stream Determination Needed?
Stream Determination Completed)
Does DWR RO need a statement that no
wetlands/streams are disturbed
for this project from applicant?
Buffer Determination Needed?
Buffer Determination Completed?
?�
Recycle system permit existing?
Permit #
3
New Recycle System permit required?*
F_
r
Enough information to determine?
Non -discharge permit existing?
f Permit #
t
unknown.
Will wastewaters discharge to HQW waters
/-
r 7010
Permittee
with a 7Q10=0?
Flow:
must
determine.
( Has Violation
F_ O&M Requirements
t_ HQW/7Q10 Concerns
Does DWR require DEMLR to hold the ;
f- Pay back fees or renew
permit (e.g. so DWR can review it further or
DWR permit
because DWR requires more information)?
i Other.
Please describe the reason to
hold the permit:
RO contact:
Hold Until
Mine must wait to dewater until an O&M plan is
F
(-
approved?
Reviewed by:
DWR RO Surface Water. CCC Regional Office WiRO Date: 05/08/18
RO Aquifer Protection Section: Regional Office Date
RP„ Sann.mhw omn