Loading...
HomeMy WebLinkAboutNCG020933_Mining Permit Application Review Form DWR_20190425Print this form to PDF Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. MINING PERMIT APPLICATION REVIEW FORM for the DIVISION OF WATER RESOURCES Project Name Sandhorn Mine DEMLR Permit pnorrisPntengineers. com PERMIT ACTION TYPE: New YES Have land disturbing activities started? Date? Latitud 34.0090 Longitude:-78.6620 County Brunswick Applicant's Email: Phil Norris NO J Please return comments to (at DEMLR CO): Judy Wehner Comments due by: May 11,2018 SECTION BELOW TO BE FILLED OUT BY DWR: Date Commencing Is the RO concerned that the operation, as proposed, would violate standards of water quality? Yes Comments: The area to be mined appears to be completely surrounded by wetlands. Please use BMP's to maintain water quality Watershed/Stream Name & Classification: Lumber Basin/Waccamaw River- Class C:Sw DWR Compliance Status of Mine: Compliant Does this mine (or previous owner) have DWR back fees to pay? If yes, amount: Is this mine an active permit in BIMS? NO YES NO 401 Wetland Cent. required? rV 401 Wetland Cert. existing? Permit# r Does DWR RO have enough information to determine if a 401 certification is required? R Is an O & M Plan needed? YES NO Are wetlands disturbed at this site? r._ I' Not according to app Does DWR RO suspect or know of nearby Fv- F wetlands to the site? Rev Sanfemhgr 9nin Print this form to PDF Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU- Send a copy to the permiltee. JD Is a wetland delineation required prior to Consultant DWR issuing the permit? Onsite? Offsite? Stream Determination Needed? Stream Determination Completed) Does DWR RO need a statement that no wetlands/streams are disturbed for this project from applicant? Buffer Determination Needed? Buffer Determination Completed? ?� Recycle system permit existing? Permit # 3 New Recycle System permit required?* F_ r Enough information to determine? Non -discharge permit existing? f Permit # t unknown. Will wastewaters discharge to HQW waters /- r 7010 Permittee with a 7Q10=0? Flow: must determine. ( Has Violation F_ O&M Requirements t_ HQW/7Q10 Concerns Does DWR require DEMLR to hold the ; f- Pay back fees or renew permit (e.g. so DWR can review it further or DWR permit because DWR requires more information)? i Other. Please describe the reason to hold the permit: RO contact: Hold Until Mine must wait to dewater until an O&M plan is F (- approved? Reviewed by: DWR RO Surface Water. CCC Regional Office WiRO Date: 05/08/18 RO Aquifer Protection Section: Regional Office Date RP„ Sann.mhw omn