PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number 31-161 County Duplin
Facility Name JE GRADY & SONS 14
Certified Operator Name Steve Grady Operator Number
18050
1 Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways, and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
Lagoon Name/ID 1 1,0A2 q�Z013 LU,04
Spillway(Y or N) N N N N
Level(inches) 18 6 11 20
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures
Five and 30 day Plans of Action are attached Hydraulic and agronomic balances are
within acceptable ranges
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures A
30 day Plan of Action is attached Agronomic balance is within acceptable range
Waste is to be pumped and hauled to off site locations Volume and PAN content of waste
to be pumped and hauled is reflected in section III tables Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information Contact and secure approval from the DWQ pnor to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated
*Attach a complete schedule with corresponding animal units and dates fro depopulation
*if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3 Earliest possible date to begin land application of waste 912212018
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
Steve Grady Phone
Facility Owner/Manager (print)
Date
Facility Owner/Manager (signature)
919 658-5757
10/17/2018
0
t
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24
HR. STORM
STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1
Structure ID 1
line m =
338 4 lb PAN
2
Structure ID 2
line m =
10998 lb PAN
3
Structure ID 3
line m =
5938 lb PAN
4
Structure ID 4
line m =
3108 lb PAN
5
Structure ID
line m =
lb PAN
6
Structure ID.
line m =
lb PAN
In. lines1+2+3+4+5+6= 23429lbPAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o tract #
p field #
q crop
r acres
s remaining IRR
2 PAN balance
(lb/acre)
L TOTAL PAN
BALANCE FOR
FIELD (lbs )
column r x s
u application window'
2316
1
SMALL GRAIN OS
496
50.00
248.0
SEP-APR
2316
2
SMALL GRAIN OS
488
5000
2440
SEP-APR
2316
3A
SMALL GRAIN OS
511
5000
255 5
SEP-APR
2316
3B
SMALL GRAIN OS
7.21
5000,
360.5
SEP-APR
2316
4A
SMALL GRAIN OS
560
5000
280.0
SEP-APR
2316
4B
SMALL GRAIN OS
507
50.00
253 5
SEP-APR
2316
5A
SMALL GRAIN OS
581
5000
290 5
SEP-APR
2316
5B
SMALL GRAIN OS
4.67
5000
2335
SEP-APR
2316
6
SMALL GRAIN OS
465
50.00
232 5
SEP-APR
2316
7
SMALL GRAIN OS
622
5000
311 0
SEP-APR
2316
8
SMALL GRAIN OS
5911
5000
295 5
SEP-APR
2316
9
SMALL GRAIN OS
5.691
5000
284 5
SEP-APR
2316
10
SMALL GRAIN OS
4.99
5000
249.5
SEP-APR
2316
19
SMALL GRAIN OS
3.49
50.00
1745
SEP-APR
2316
20
SMALL GRAIN OS
333
5000
166.5
SEP-APR
2316
21
SMALL GRAIN OS
359
5000
1795
SEP-APR
'State current crop ending application date or next crop application beginning date for available
receiving crops dunng 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 4059 0 lb. PAN
N. FACILITY S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 2342 9 lb. PAN
PoA (30 Day) 2/21/00
x. Crop's remaining PAN balance (line v from section III) = 4059 0 lb. PAN
y. Overall PAN balance (w - x) _ -1716 lb. PAN
Line y must show as a deficit If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
Imgation onto existing spray fields has begun and will continue as weather and field conditions permit Add
land is available
PoA (30 Day) 2/21100
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID) 11
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr/24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7 48 gallons/ft3
3 Protected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
18 0 inches
21 5 inches
3.5 inches
94962 ftZ
207175 gallons
180 days
g volume of waste produced according to structural design 111375 ft3
h current herd # 3375 certified herd # 3375
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j excess rainfall over evaporation according to design
k (lines h + i +j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I current waste analysis dated 9/26/2018
m ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
111375 ft'
Oft3
57575 ft3
210624 gallons
0.81 Ibs/1000 gal
338.4 Ibs. PAN
PoA (30 Day) 2/21/00
r
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1 Structure Name/ldentifier(ID) 12
2 Current liquid volume in 25 yr /24 hr storm storage & structural freeboard
a. current liquid level according to marker
b designed 25 yr./24 hr. storm & structural freeboard
c line b - line a (inches in red zone) _
d top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7 48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
6.0 inches
21 5 inches
15.5 inches
1015361 ft3
981007 gallons
180 days
g volume of waste produced according to structural design 121058 ft3
h. current herd # 3672 certified herd # 3672
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
I excess rainfall over evaporation according to design
k (lines h+ i +j) x 7 48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 9/26/201 B
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
121058 ft3
Oft3
61483 ft3
227568 gallons
0.91 Ibs/1000 gal
1099.8 Ibs PAN
PoA (30 Day) 2/21/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1 Structure Name/Identifier (ID) 1 3
2 Current liquid volume in 25 yr /24 hr storm storage & structural freeboard
a current liquid level according to marker
b designed 25 yr /24 hr storm & structural freeboard
c line b - line a (inches in red zone) _
d top of dike surface area according to design
(area at below structural freeboard elevation)
e line c/12 x line d x 7.48 gallons/W
3 Protected volume of waste liquid produced during draw down period
f temporary storage period according to structural design
11 0 inches
21 5 inches
10 5 inches
86436 ftz
565724 gallons
180 days
g volume of waste produced according to structural design 121058 ft3
h current herd # 3672 certified herd # 3672
actual waste produced = current herd # x line g = 121058 ft3
certified herd #
i. volume of wash water according to structural design
j excess rainfall over evaporation according to design
k (lines h+ i +j) x 7 48 x 30 days/line f=
4 Total PAN to be land applied during draw down period
I current waste analysis dated 9/26/2018
m ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
0 ft3
51917 ft3
215642 gallons
0 76 Ibs/1000 gal
593.8 Ibs. PAN
PoA (30 Day) 2/21/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1 Structure Name/Identifier(ID): 1 4
2 Current liquid volume in 25 yr /24 hr storm storage & structural freeboard
a current liquid level according to marker
b. designed 25 yr /24 hr storm & structural freeboard
c line b - line a (inches in red zone) _
d top of dike surface area according to design
(area at below structural freeboard elevation)
e line c/12 x line d x 7 48 gallons/W
3 Projected volume of waste liquid produced during draw down period
f temporary storage period according to structural design
20 0 inches
22 8 inches
28 inches
91186 ftZ
159150 gallons
180 days
g volume of waste produced according to structural design 121058 ft3
h current herd # 3672 certified herd # 3672
actual waste produced = current herd # x line g =
certified herd #
i volume of wash water according to structural design
I excess rainfall over evaporation according to design
k. (lines h + i +j) x 7.48 x 30 days/line f=
4 Total PAN to be land applied during draw down period
I. current waste analysis dated 9/26/2018
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.,
(Click on the next Structure tab shown below)
121058 ft'
0 ft3
55358 ft3
219932 gallons
0 82 Ibs/1000 gal
310.8 Ibs PAN
PoA (30 Day) 2/21/00