Loading...
HomeMy WebLinkAbout310161_30 day POA_20181017;41 K dl 1 Zs' PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number 31-161 County Duplin Facility Name JE GRADY & SONS 14 Certified Operator Name Steve Grady Operator Number 18050 1 Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways, and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID 1 1,0A2 q�Z013 LU,04 Spillway(Y or N) N N N N Level(inches) 18 6 11 20 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures Five and 30 day Plans of Action are attached Hydraulic and agronomic balances are within acceptable ranges X Liquid level is within the 25 year 24 hour storm elevations for one or more structures A 30 day Plan of Action is attached Agronomic balance is within acceptable range Waste is to be pumped and hauled to off site locations Volume and PAN content of waste to be pumped and hauled is reflected in section III tables Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information Contact and secure approval from the DWQ pnor to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3 Earliest possible date to begin land application of waste 912212018 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Steve Grady Phone Facility Owner/Manager (print) Date Facility Owner/Manager (signature) 919 658-5757 10/17/2018 0 t II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1 Structure ID 1 line m = 338 4 lb PAN 2 Structure ID 2 line m = 10998 lb PAN 3 Structure ID 3 line m = 5938 lb PAN 4 Structure ID 4 line m = 3108 lb PAN 5 Structure ID line m = lb PAN 6 Structure ID. line m = lb PAN In. lines1+2+3+4+5+6= 23429lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o tract # p field # q crop r acres s remaining IRR 2 PAN balance (lb/acre) L TOTAL PAN BALANCE FOR FIELD (lbs ) column r x s u application window' 2316 1 SMALL GRAIN OS 496 50.00 248.0 SEP-APR 2316 2 SMALL GRAIN OS 488 5000 2440 SEP-APR 2316 3A SMALL GRAIN OS 511 5000 255 5 SEP-APR 2316 3B SMALL GRAIN OS 7.21 5000, 360.5 SEP-APR 2316 4A SMALL GRAIN OS 560 5000 280.0 SEP-APR 2316 4B SMALL GRAIN OS 507 50.00 253 5 SEP-APR 2316 5A SMALL GRAIN OS 581 5000 290 5 SEP-APR 2316 5B SMALL GRAIN OS 4.67 5000 2335 SEP-APR 2316 6 SMALL GRAIN OS 465 50.00 232 5 SEP-APR 2316 7 SMALL GRAIN OS 622 5000 311 0 SEP-APR 2316 8 SMALL GRAIN OS 5911 5000 295 5 SEP-APR 2316 9 SMALL GRAIN OS 5.691 5000 284 5 SEP-APR 2316 10 SMALL GRAIN OS 4.99 5000 249.5 SEP-APR 2316 19 SMALL GRAIN OS 3.49 50.00 1745 SEP-APR 2316 20 SMALL GRAIN OS 333 5000 166.5 SEP-APR 2316 21 SMALL GRAIN OS 359 5000 1795 SEP-APR 'State current crop ending application date or next crop application beginning date for available receiving crops dunng 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 4059 0 lb. PAN N. FACILITY S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 2342 9 lb. PAN PoA (30 Day) 2/21/00 x. Crop's remaining PAN balance (line v from section III) = 4059 0 lb. PAN y. Overall PAN balance (w - x) _ -1716 lb. PAN Line y must show as a deficit If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the Imgation onto existing spray fields has begun and will continue as weather and field conditions permit Add land is available PoA (30 Day) 2/21100 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID) 11 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr/24 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7 48 gallons/ft3 3 Protected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 18 0 inches 21 5 inches 3.5 inches 94962 ftZ 207175 gallons 180 days g volume of waste produced according to structural design 111375 ft3 h current herd # 3375 certified herd # 3375 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j excess rainfall over evaporation according to design k (lines h + i +j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I current waste analysis dated 9/26/2018 m ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 111375 ft' Oft3 57575 ft3 210624 gallons 0.81 Ibs/1000 gal 338.4 Ibs. PAN PoA (30 Day) 2/21/00 r PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1 Structure Name/ldentifier(ID) 12 2 Current liquid volume in 25 yr /24 hr storm storage & structural freeboard a. current liquid level according to marker b designed 25 yr./24 hr. storm & structural freeboard c line b - line a (inches in red zone) _ d top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7 48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 6.0 inches 21 5 inches 15.5 inches 1015361 ft3 981007 gallons 180 days g volume of waste produced according to structural design 121058 ft3 h. current herd # 3672 certified herd # 3672 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design I excess rainfall over evaporation according to design k (lines h+ i +j) x 7 48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 9/26/201 B m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 121058 ft3 Oft3 61483 ft3 227568 gallons 0.91 Ibs/1000 gal 1099.8 Ibs PAN PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1 Structure Name/Identifier (ID) 1 3 2 Current liquid volume in 25 yr /24 hr storm storage & structural freeboard a current liquid level according to marker b designed 25 yr /24 hr storm & structural freeboard c line b - line a (inches in red zone) _ d top of dike surface area according to design (area at below structural freeboard elevation) e line c/12 x line d x 7.48 gallons/W 3 Protected volume of waste liquid produced during draw down period f temporary storage period according to structural design 11 0 inches 21 5 inches 10 5 inches 86436 ftz 565724 gallons 180 days g volume of waste produced according to structural design 121058 ft3 h current herd # 3672 certified herd # 3672 actual waste produced = current herd # x line g = 121058 ft3 certified herd # i. volume of wash water according to structural design j excess rainfall over evaporation according to design k (lines h+ i +j) x 7 48 x 30 days/line f= 4 Total PAN to be land applied during draw down period I current waste analysis dated 9/26/2018 m ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 0 ft3 51917 ft3 215642 gallons 0 76 Ibs/1000 gal 593.8 Ibs. PAN PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1 Structure Name/Identifier(ID): 1 4 2 Current liquid volume in 25 yr /24 hr storm storage & structural freeboard a current liquid level according to marker b. designed 25 yr /24 hr storm & structural freeboard c line b - line a (inches in red zone) _ d top of dike surface area according to design (area at below structural freeboard elevation) e line c/12 x line d x 7 48 gallons/W 3 Projected volume of waste liquid produced during draw down period f temporary storage period according to structural design 20 0 inches 22 8 inches 28 inches 91186 ftZ 159150 gallons 180 days g volume of waste produced according to structural design 121058 ft3 h current herd # 3672 certified herd # 3672 actual waste produced = current herd # x line g = certified herd # i volume of wash water according to structural design I excess rainfall over evaporation according to design k. (lines h + i +j) x 7.48 x 30 days/line f= 4 Total PAN to be land applied during draw down period I. current waste analysis dated 9/26/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE., (Click on the next Structure tab shown below) 121058 ft' 0 ft3 55358 ft3 219932 gallons 0 82 Ibs/1000 gal 310.8 Ibs PAN PoA (30 Day) 2/21/00