Loading...
HomeMy WebLinkAbout310165_5 day POA_201810172lc-0 PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number 31-165 County. Duplin Facility Name. S GRADY 3,4&5 Certified Operator Name. Steve Grady Operator Number. 18050 1 Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons vothout spillways, and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. , Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID 3 4 4A 5 Spillway(Y or N): N N N N Level(inches), 7 12 12 7 2. Check all applicable items Liquid level is within the designed structural freeboard elevabons of one or more structures Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures A 30 day Plan of Action is attached Agronomic balance is within acceptable range Waste is to be pumped and hauled to off site locations Volume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated 'Attach a complete schedule with corresponding animal units and dates fro depopulation .if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste 9/22/2018 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Steve Phone. 919 658-5757 Facility Owner/Manager (print) Date: 10/17/2018 Facility Owner/Manager (signature) II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1 Structure ID 3 line m = 955 0 lb PAN 2 Structure ID 4A line m = 4002 lb PAN 3 Structure ID 413 line in = 3856 lb PAN 4 Structure ID 5 line m = 8183 lb PAN 5 Structure ID line m = lb PAN 6 Structure ID line m = lb PAN n. lines I + 2 + 3 + 4 + 5 + 6 = 25590lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. O tract # p field # q Crop r acres s remaining IRR 2 PAN balance (lb/acra) t TOTAL PAN BALANCE FOR FIELD (lbs ) column rxs u application window' 8198 1 SMALL GRAIN OS 11.95 10000 1195 0 SEP-APR 8198 2 SMALL GRAIN OS 299 10000 2990 SEP-APR 8198 3 SMALL GRAIN OS 9.98 10000 9980 SEP-APR 8198 4 SMALL GRAIN OS 1 43 10000 1430 SEP-APR 8198 5 SMALL GRAIN OS 4.05 10000 4050 SEP-APR 8198 6 SMALL GRAIN OS 810 10000 8100 SEP-APR 8198 7 SMALL GRAIN OS 2.13 100.00 2130 SEP-APR 8198 8 SMALL GRAIN OS 1.79 10000 1790 SEP-APR 'State current crop ending application date -or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 4242 0 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 2559 0 lb. PAN PoA (30 Day) 2/21/00 x. Crop's remaining PAN balance (line v from section III) = 42420 lb. PAN y. Overall PAN balance (w - x) _ -1683 lb. PAN Line y must show as a deficit If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc For pump & haul and herd reduction options, recalculate new PAN based on new information If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Irrigation onto existing spray fields has begun and will continue as weather and field conditions permit PoA (30 Day) 2/21100 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1 Structure Name/ldentifier(ID). 13 2 Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr storm & structural freeboard c line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3 Projected volume of waste liquid produced during draw down period f temporary storage period according to structural design 7 0 inches 19 5 inches 12.5 inches 86775 ftz 676122 gallons 180 days g volume of waste produced according to structural design 121058 ft3 h. current herd # 3672 certified herd # 3672 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i +j) x 7 48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 9/26/2018 m ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 121058 ft' 0 ft3 52500 ft3 216369 gallons 1 07 Ibs/1000 gal. 965.0 Ibs. PAN PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Namelldentrfier (ID) 14A 2. Current liquid volume in 25 yr /24 hr storm storage & structural freeboard a current liquid level according to marker b designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ d top of dike surface area according to design (area at below structural freeboard elevation) e. line d12 x line d x 7.48 gallons/fe 3. Protected volume of waste liquid produced during draw down penod f temporary storage period according to structural design 12 0 inches 19 5 inches 7 5 inches 66736 ftZ 311991 gallons 180 days g. volume of waste produced according to structural design 121058 ft3 h. current herd # 3672 certified herd # 3672 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design t excess rainfall over evaporation according to design k (lines h+ i +j) x 7 48 x 30 days/line f= 4 Total PAN to be land applied during draw down period I current waste analysis dated 9/26/2018 m ((lines e + k)/1000) x hne I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 121058 ft' 0 ft3 35000 ft3 194552 gallons 0 79 Ibs/1000 gal. 400.2 Ibs. PAN PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1 Structure Name/Identifier (ID) I 4B 2 Current liquid volume in 25 yr 124 hr. storm storage & structural freeboard a. current liquid level according to marker 7 0 inches b designed 25 yr /24 hr storm & structural freeboard 19.5 inches c line b - line a (inches in red zone) = 12 5 inches d top of dike surface area according to design (area at below structural freeboard elevation) 57036 ftz e. line c/12 x line d x 7.48 gallons/W 444406 gallons 3 Projected volume of waste liquid produced during draw down penod f temporary storage period according to structural design 180 days g. volume of waste produced according to structural design Oft3 h current herd # certified herd #0 actual waste produced = current herd # x line g certified herd # i volume of wash water according to structural design Oft" 1 excess rainfall over evaporation according to design 35000 ft" k (lines h + i +l) x 7 48 x 30 days/line f= 43633 gallons 4 Total PAN to be land applied during draw down period I current waste analysis dated 1 9/26/2018 0.79 Ibs/1000 gal. m ((lines e + k)/1000) x line I = 385.6 Ibs PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2121/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1 Structure Name/Identifier (ID) 1 5 2 Current liquid volume in 25 yr/24 hr storm storage & structural freeboard a current liquid level according to marker b designed 25 yr./24 hr storm & structural freeboard c line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e line c/12 x line d x 7.48gallons/W 3 Projected volume of waste liquid produced during draw down penod f temporary storage penod according to structural design 7 0 inches 19 5 inches 12 5 inches 97854 ftz 762446 gallons 180 days g volume of waste produced according to structural design 121058 ft' h current herd # 3672 certified herd # 3672 actual waste produced = current herd # x line g = certified herd # i volume of wash water according to structural design j excess rainfall over evaporation according to design k (lines h + i + I) x 7 48 x 30 dayslhne f= 4 Total PAN to be land applied during draw down penod I current waste analysis dated 9/26/2018 m ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 121058 ft' 0 ft3 58188 ft3 223460 gallons 0.83 Ibs/1000 gal 818.3 Ibs. PAN PoA (30 Day) 2/21/00