HomeMy WebLinkAbout310141_30 day POA_20180531A4 n^ ►� 00 4� 31- I,f f INC 4;6' (2 C'4 S'31II PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 5/31 /2018 1 Structure Name/Identifier (ID) I B&P Farms, Inc 31-141 2 Bobby Sholar Farm 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr /24 hr. storm & structural freeboard c line b - line a (inches in red zone) _ d top of dike surface area according to design (area at below structural freeboard elevation) e line c/12 x lined x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period 18.5 inches 19.5 inches 1.0 inches 39950 ftZ 24902 gallons f temporary storage period according to structural design 180 days g. volume of waste produced according to structural design F 40352.7 ft3 h. current herd # 1224 certified herd #1 1224 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design t. excess rainfall over evaporation according to design k. (lines h + i +j) x 7 48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 4/9/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 40353 ft' Oft3 37916 7 ft3 23304 gallons 1.12 Ibs/1000 gal 54.0 lbs. PAN rc, PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL.PAN TO BE LAND APPLIED PER WASTE STRUCTURE 5/31 /2018 1 Structure Name/ldenti ier (ID): I B&P Farms, Inc 31-141 1 Bobby Sholar Farm 2. Current liquid volume in 25 yrJ24 hr storm storage & structural freeboard a current liquid level according to marker 19 5 inches b designed 25 yr /24 hr storm & structural freeboard 19.5 inches c line b - line a (inches in red zone) = inches d top of dike surface area according to design (area at below structural freeboard elevation) 97026 ft2 e line c/12 x lined x 7.48 gallons/ft3 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 121058.1 ft3 h current herd # 3672 certified herd # 3672 actual waste produced = current herd # x line g = 121058 ft' certified herd # i volume of wash water according to structural design I. excess rainfall over evaporation according to design k. (lines h + i +j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I current waste analysis dated 4!9/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 5/31/2018 Offs 56598 5 ft3 221479 gallons 1.58 Ibs/1000 gal. 349.9 Ibs PAN Y� A Line y must show as a deficit If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc For pump & haul and herd reduction options, recalculate new PAN based on new information If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility A lot of rain past few weeks. As soon as weather permits I will resume pumping operation to get lagoon level back in compliance PoA (30 Day) 5/312018 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1 Structure ID B&P Farms, Inc. (31-141) (1) line m = 3499 lb PAN 2 Structure ID B&P Farms, Inc (31-141) (2) line m = 54.0 lb PAN 3 Structure ID line m = lb PAN 4 Structure ID: line m = lb PAN 5. Structure ID line m = lb PAN 6 Structure ID line m = Ib PAN n.lines 1+2+3+4+5+6= 403.9lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. Bermudagrass Hay 'Slate current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period v. Total PAN available for all fields (sum of column t) = 5175.0 lb. PAN IV. FACILITY S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line in from section II) = 403 9 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 5175 0 lb. PAN y. Overall PAN balance (w - x) _ -4771 lb. PAN PoA (30 Day) 5/31/2018