HomeMy WebLinkAbout310141_30 day POA_20180629PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
6/29/2018
1 Structure Name/Identifier (ID). I B&P Farms, Inc 31-141 1 Bobby Sholar Farm
2 Current liquid volume in 25 yr /24 hr storm storage & structural freeboard
a current liquid level according to marker 21.5 inches
b designed 25 yr /24 hr. storm & structural freeboard
c line b - line a (inches in red zone) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e line c/12 x lined x 7 48 gallons/ft3
3 Projected volume of waste liquid produced during draw down period
f temporary storage period according to structural design
19 5 inches
-2 inches
97026 ft'
-120959 gallons
180 days
g. volume of waste produced according to structural design 121058.1 ft3
h. current herd # 3672 certified herd # 3672
actual waste produced = current herd # x line g =
certified herd #
i volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k (lines h +i+j)x748x 30 days/line f=
4 Total PAN to be land applied during draw down period
I. current waste analysis dated 4/9I2018
m ((lines e + k)/1000) x line I =
REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 6/29/2018
121058 ft'
0 ft3
56598 5 113
221479 gallons
1.58 Ibs/1000 gal.
158.8 Ibs. PAN
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 6/29/2018
1 Structure Name/Identfer (ID) B&P Farms, Inc, 31-141 2 Bobby Sholar Farm
2- Current liquid volume in 25 yrJ24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr/24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e line c/12 x line d x 7.48 gallons/ft'
3. Projected volume of waste liquid produced during draw down period
17 0 inches
19 5 inches
2.5 inches
39950 ft2
62255 gallons
f temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 40352.7 ft3
h current herd # 1224 certified herd # 1224
actual waste produced- = current herd # x line g =
certified herd #
i volume of wash water according to structural design
I excess rainfall over evaporation according to design
k (lines h + i + j) x 7 48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 1 4/9/2018
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2121/00
40353 ft'
Oft'
37916 7 W
23304 gallons
1 12 Ibs/1000 gal
95.8 Ibs. PAN
Il. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1.
Structure ID B&P Farms, Inc (31-141) (1)
line m =
1588 lb PAN
2
Structure ID B&P Farms, Inc (31-141) (2)
line m =
958 lb PAN
3.
Structure ID:
line m =
lb PAN
4.
Structure ID,
line m =
lb PAN
5.
Structure ID:
line m =
lb PAN
6
Structure ID:
line m =
lb PAN
n lines 1+2+3+4+5+6= - 254.6lbPAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PFRIOD_ DO NOT LIST FIELDS TO WHICH PAN CANNOT REAPPLIED DURING THIS 30 DAY PERIOD.
:: •a
1111
• 11
•�
'State current crop ending application dale or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 2300.0 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 254.6 lb. PAN
x. Crop's remaining PAN balance (line v from section III) = 2300.0 lb. PAN
y. Overall PAN balance (w - x) _ -2045 lb. PAN
PoA (30 Day) 6/29/2018
o
Line y must show as a deficit If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility
Sill haven't got lagoon 1 back in compliance but hopfuly by the end of the weekend it will be back above
19"A lot of rain past few weeks As soon as weather permits I will resume pumping operation to get lagoon
level back in compliance.
PoA (30 Day) 6/2912018