PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
8/6/2018
1. Structure Name/Identifier (ID): B&P Farms, Inc 31-141 1 Bobby Sholar Farm
2. Current liquid volume in 25 yr /24 hr storm storage & structural freeboard
a current liquid level according to marker 19.0 inches
b designed 25 yr/24 hr storm & structural freeboard
c line b - line a (inches in red zone) _
d top of dike surface area according to design
(area at below structural freeboard elevation)
e line c/12 x line d x 7 48 gallons/ft3
3 Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
19 5 inches
0 5 inches
97026 ft2
30240 gallons
180 days
g. volume of waste produced according to structural design 121058.1 ft3 _
h current herd # 3672 certified herd # 3672
actual waste produced = current herd # x line g =
certified herd #
i volume of wash water according to structural design
t. excess rainfall over evaporation according to design
k (lines h + i + j) x 7.48 x 30 days/line f=
4 Total PAN to be land applied dunng draw down period
I. current waste analysis dated 4/9/2018
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 8/6/2018
121058 ft'
ft3
56598 5 ft3
221479 gallons
1 58 Ibs/1000 gal.
397.7lbs PAN
� IV
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
8/6/2018
1 Structure Name/Identifier (ID): I B&P Farms, Inc. 31-141 2 Bobby Sholar Farm
2 Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a current liquid level according to marker
b. designed 25 yr24 hr. storm & structural freeboard
c line b - line a Cinches in red zone) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e line c/12 x line d x 7.48 gallons/ft'
3 Projected volume of waste liquid produced during draw down period
16.0 inches
19.5 inches
3 5 inches
39950 ft2
87158 gallons
f. temporary storage period according to structural design 180 days
g volume of waste produced according to structural design 40352 7 ft3
h. current herd # 1224 certified herd # 1224
actual waste produced = current herd # x line g =
certified herd #
i volume of wash water according to structural design
t excess rainfall over evaporation according to design
k (lines h + i + j) x 7.48 x 30 days/hne f=
4. Total PAN to be land applied during draw down period
I.. current waste analysis dated 1 4/9/2018
m ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2121100
40353 ft'
0 ft3
37916 7 ft3
23304 gallons
1 12 Ibs/1000 gal
123.7 Ibs PAN
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1
Structure ID B&P Farms, Inc (31-141) (1)
line m =
3977 Ito PAN
2
Structure ID B&P Farms, Inc (31-141) (2)
line m =
123.7 lb PAN
3
Structure ID
line m =
lb PAN
4.
Structure ID
line m =
lb PAN
5
Structure ID
line m =
lb PAN
6
Structure ID
line m =
lb PAN
n.lines 1+2+3+4+5+6= 5214Ito PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
Bermudagrass Hay
'Slate current crop ending application date or next crop application beginning dale for available
receiving crops during 30 day draw down penod
v. Total PAN available for all fields (sum of column t) = 3951.8 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 521.4 lb. PAN
x. Crop's remaining PAN balance (line v from section III) = 3951 8 lb. PAN
y. Overall PAN balance (w - x) _ -3430 lb. PAN
PoA (30 Day) 8/62018
- -
Line y must show as a deficit If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc For pump R haul and herd reduction options, recalculate new PAN
based on new information If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
Thunderstorms in this area almost every day. As soon as weather permits I will resume pumping operation
to get lagoon level back in compliance.
PoA (30 Day) 8/6/2018