Loading...
HomeMy WebLinkAboutNC0024325_Annual Report_201904014/1/2018 Deborah Gore Department of Environmental Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Mrs. Gore, REC'E'VC` WDENR/DWR APR 23 2019 Water Rego urcea P"nit;"g Sec ►on Attached is the annual update for North Buffalo and T.Z. Osborne WWT facilieties for 2018. The City of Greensboro is also in the process of upgrading our T.Z. Osborne WWTP capacity to 56 MGD with construction associated with WWTP permit number NC0024325. The North Buffalo fality was decommissioned October 2017 and is only a transfer pump station. I have forwarded the necessary information to Deborah Gore in Raleigh. If you require any additional information or have any questions please do not hesitate to contact me at (336) 373-2055. Sincerely, Shane Messer Engineering Specialist City of Greensboro Water Resources Department al-11 Attachment cc: Jana Stewart, PE Jason Geary, PE # City of Greensboro Water Resources Department Engineering Division Flow Tracking/Acceptance for Sewer Extension Permit Applications (COG-FTSE-10/07) Permit Number: N/A Project Applicant Name: City of Greensboro Project Name for which flow is being requested: Annual Flow Allocation & SILT Update More than one COG FTSE-10107 maybe required for a single project rf the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewaterflow. Flow acceptance is contingent upon City Council approval. The Flow Tracking /Acceptance Permit is valid for a period of one year from the date of issuance. Failure to renew the pennit pnor to the expiration date, by submission ofa revised application, will result in relinquishment of any waste water flow allocated for the project in question. A revised application must be submitted to Water Resources Department rfflow conditions or development plans change other than what was stated in the original application. I. Complete this section only if you are the owner of the wastewater treatment plant. a. W WTP Facility Name: T.Z. Osborne Water Reclamation Facility b. WWTP Facility Permit Number: NC0047384 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility All flows are in MGD 56.0000 CS - 0.0552 SIJ - 2.6099 29.87 32.5351 h. Percent of permitted flow used 81.34 H. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. Are there any pump stations affected? 0.00 List pump stations located between the project connection point and the WWTP Pump Station Name Approx. Capacity, MGD Approx. Current Avg. (Firm/Desiga) Daily Flow, MGD Not Applicable n/a n/a Not Applicable n/a n/a Not Applicable n/a n/a Not Applicable n/a n/a III. Certification Statement: I, Shane Messer certify that, to the best of my Imowledge, the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump stations enroute to the receiving treatment plant. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II for which I am the responsible party. Signature of this form indicates acceptance of this wastewater flow. 54-�& 212812018 Signing Official Signature Date