Loading...
HomeMy WebLinkAbout310133_30 day POA_20180113 (5)J 1 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): I G. Kennedy 1 31-133 2. Current liquid volume In 25 yr./24 hr. stone storage & structural freeboard a. current liquid level according to marker 17.0 Inches b. designed 25 yr.124 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches In red zone) = 2.0 Inches d. top of dike surface area according to design (area at below structural freeboard elevation) 70150 fe a. line c/12 x line d x 7.48 gallonsW 87454 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 80705 ft3 h. current herd # 2448 certified herd # 2448 actual waste produced = current herd # x line g = certified herd # I. volume of wash water according to structural design I excess rainfall over evaporation according to design k. pines h + I +j) x 7.48 x 30 daysAine f= 4. Total PAN to be land applied during draw down period I current waste analysis dated 12/18/2017 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 1/15/2018 80705 fe �to 35000 ft3 144246 gallons 1.52 Ibs/1000 gal 352.2 lbs. PAN 3 i Kul 097 7 11. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: G. Kennedy 1(31-133) line m = 352.2 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n.lines 1+2+3+4+5+6= 3522lbPAN Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 424.0 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE - w. Total PAN to be land applied (line n from section II) = 352.2 lb. PAN x. CroWs remaining PAN balance (line v from section 111) = 424 0 lb. PAN y. Overall PAN balance (w - x) _ -72 lb. PAN PoA (30 Day) 1/15/2018 Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc For pump & haul and herd reduction options, recalculate new PAN based on new information If new fields are to be Included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. PoA (30 Day) 1/152018