Loading...
HomeMy WebLinkAbout310133_Sludge Survey (Testing Dates)_2018040331--03 April 3, 2018 Jonathan Miller Agriment Services, Inc P.O. Box 1096 Beulaville, NC 28518 RE: Sludge Survey Testing Dates Dear Mr. Miller. ROY COOPER Governor MICHAEL S. REGAN Secmtary LINDA CULPEPPER /nmrrm Director RECE[VEDA4GDEHRffjq t APR 0 5 2018 Water Quality Regional Operations Section Wilmington Regional Office The Division of Water Resources (Division) received your sludge survey information for many of the Agriment serviced farms on January 12, 2018. With the survey results, you requested an extension of the sludge survey requirement for the lagoons at those facilities. Due to the amounts of treatment volume available, the Division agrees that a sludge survey is not needed for some of the lagoons until 2019, 2020, 2021 or 2022. See the attached table to determine the allowed extension date for each lagoon. However, due to the amount of treatment volume available, and the rate of sludge accumulation, the Division feels that an extension is not appropriate for lagoon #2 at facility # 31-371, lagoon 41 at facility # 52-9, lagoon #1 at facility #31-576, lagoon #1 at facility #24-76, and lagoon #2 at facility #31-376. The next sludge survey for these lagoons should be performed before December 31, 2018. Thank you for your attention to this matter. If you have any questions, please call me at (919) 807-6340. Sincerely, Miressa D. Garoma Animal Feeding Operations Program Attachment: Extension List ce: Wilmington Regioiiel Office, Water Quality. Regional Operations Section Washin-gtou Regional -Office, Water Quality Regional Operations Section Central Files rP]othtnq Compares -� State of North Carohoe I Envtroammtal Quality I Dimon of Water Resotatts Water Q"Ilty Regional OpermtIms Seehon 1636 Miami Smue Cuter I Raleigh, North C=Itoa 27699-1636 I . T.. .,.. '.n•• ,,;i .:>��+�-..�. t. },r �.�'.SEr a�=}i4 vLh e4^:�`:til :sil i•.i. 't r�-";e .. ,.. ,,F,, .!;,.:-. �n r. £' : C-f List of Agriment Services, Inc facilities granted sludge survey extension. Date of Survey Farm Facitly # Lagoon # Extension Until 8/4/2017 James Brown 31-371 1 12/31/2020 8/4/2017 James Brown 31-371 2 No Extension-12/31/2018 8/11/2017 Glenn Haddock Front Big Primary) 74-6 3 (FBP) 12/3112022 1/1312017 Ann Herrin 31-685 1 12/31/2020 5/18/2017 JC Howard (Taylor Farm 52-41 Tayior 2 12/31/2021 5/18/2017 JC Howard No Name Farm 52-9 1 Front No Extension-12/3112018 5/18/2017 JC Howard No Name Farm 52-9 2 Back 12/31/2020 5/18/2017 JC Howard Zimmerman Farm 54-144 1 12/31/2022 7/18/2017 Graham Kennedy 31-133 2 12/31/2019 10120/2017 Gerald Knowles PLT 2319 31-285 1 12/31/2019 9/29/2017 OK Farms Inc. 31-138 2 12/31/2019 6/2/2017 The Pig Ranch Front Farm 64-4 1 Front 12/3112022 6/2/2017 The Pig Ranch Front Farm 54-4 3 Front 12/31/2022 6/2/2017 The Pig Ranch Front Farm 54-4 4 Front 12/31/2022 6/2/2017 The Piq Ranch Back Farm 54-4 2 Back 1213112022 9/22/2017 Renewable Transport (Pipeline Farm 31-576 1 No Extension- 12/31/2018 9/22/2017 Renewable Transport (Pipeline Farm 31-576 2 12/31/2022 11/17/2017 Ward Stokes State Line #1 24-76 1(West) No Extension-12/31/2018 11/17/2017 Ward Stokes State Line #2 24-76 2 East 12/31/2022 4l17/2017 Dwight Walker 31-530 1 12131/2021 12115/2017 Mike Wallace Old Farm 31-440 1 12/31/2022 3/20/2017 WBW Sow Farm, LLC Du lin 1&2 31-376 2 No Extension-12/31/ 18 Only the lagoons specifically mentioned above for these facilities have been evaluated at this time. Any other lagoons must have sludge evaluations performed by December 31, 2018 unless granted an extension under separate letter.