Loading...
HomeMy WebLinkAboutNC0000272_Annual Report_20190329 ever reen .. Canton Office 175 Main Street• Canton, NC 28716 packaging March 29, 2019 CERTIFIED MAIL Return Receipt Requested 7008 3230 0002 2595 8040 } North Carolina Department of Environment and Natural Resources Division of Environmental Quality Water Quality Section ATTENTION: Central Files 1617 Mail Service Center Raleigh,NC 27699-1617 Re: NPDES NO. NC0000272 Best Management Practices 2018 Annual Report Blue Ridge Paper Products Inc. d/b/a Evergreen Packaging Canton,NC This letter report(two copies) is the 2018 summary of Best Management Practices (BMP) daily monitoring for the Canton Mill. The report is required on or before March 31'of each year by Special Condition A.(6.) Best Management Practices, Section E.4 and Section F.1, of the mill's NPDES Permit No. NC0000272. The BMP action levels established in accordance with permit requirements and in effect for 2018 are as follows: Effective Dates: 1 Jan 2018 —31 Dec 2018 Action Level Total Influent(TI) Color — Action Required daily monitoring result 1-Day Upper Action Immediate investigation and documented > 72,500 lbs/day for one day Level (UAL) corrective action 2-dayUpper Action > 59,400 lbs/dayfor two Investigation and documented corrective pp 9 Level (UAL) consecutive days action 2-day Lower Action > 55,400 lbs/day for two Level (LAL) consecutive days Investigation and documentation Blue Ridge Paper Products Inc dba Evergreen Packaging'.,,cantonyilf m 175 Main Street • PO Box 4000 —Canton,—North-Carolina-28716—•-828=646=2000-- Dang Business ui Cai orn!a as Evergreen Beverage Packaging Z:\NEW FOLDER DIRECTORY\Environmental\WATER\New folder\BMP\BMP Events\2018 Annual BMP Summary doc 29 Mar 2019,Page 2 Daily records of total influent color are maintained at the mill. These daily color data are compared to BMP action levels every morning. Total influent color exceeded BMP action levels on the dates outlined in the following table. A brief summary of information for these dates are included as required by permit Condition A.(6.), Section E.4. The permit-required BMP investigation reports are maintained at the mill. None of the BMP action level days resulted in disruption to the wastewater treatment plant. The Canton Mill met all NPDES annual average effluent limits for the period July 1, 2017 to June 30, 2018. Date(s) Total Influent Action Level and Summary (TI) Color 10 - 11 Feb 72,448 lbs/day 2-day LAL— Investigation and documented corrective 2018 58,488 lbs/day action Cause and Corrective Action(s)— BMP event. The pulp mill was pumping excess foam from their filtrate tanks to the east black liquor compound and over flowed the compound walls. Once over the walls the material made its way into the sewer. The pulp mill has been instructed to go back to pumping foam from the filtrate tanks only twice a shift to mitigate this problem. 20 —21 March 97,937 lbs/day 2-day UAL— Investigation and documented corrective 2018 74,886 lbs/day action Cause and Corrective Action(s)—Non-BMP event. Annual outage on #10 recovery furnace and hardwood pulp mill. High color material was sent over the past few days in preparation for the annual outage. Color was monitored closely and color reducing polymer was added to mitigate drop the color before entering the secondary system. Blue Ridge Paper Products Inc. dba Evergreen Packaging—Canton Mill 175 Main Street • PO Box 4000 Canton, North Carolina 28716 • 828-646-2000 Z INEW FOLDER DIRECTORYIEnvironmentallWATERINew folderIBMPIBMP Events12018 Annual BMP Summary doc 29 Mar 2019,Page 3 Date(s) Total Influent Action Level and Summary (TI) Color 24—26 Mar 94,371 lbs/day 1-day UAL/ 1-day UAL/ 2-day LAL— Investigation and 2018 57,069 lbs/day documented corrective action 76,793 lbs/day Cause and Corrective Action(s) — Non-BMP event. The annual outage continued on longer than planned due to unforeseen maintenance issues. This caused weak wash inventory to grow beyond what we could hold. The weak wash overflowed into the sewer. That high pH material mixes with the bleach plant filtrate causing higher than normal color in the secondary system. 5 - 6 Apr 2018 61,640 lbs/day 1-day UAL/2-day UAL— Immediate Corrective Action 111,343 lbs/day Cause and Corrective Action(s) — BMP event. During an outage on the Swensons evaporators, startup did not go as planned and a small amount of black liquor was sent to the sewer. A berm was constructed by Recovery personnel to help divert the flow away from the sewer and into the sump area so the material could be sent to boil out. The following day it was discovered that the berm had collapsed and more liquor was going to the sewer. Supervision will now oversee the construction of any berms used to divert high color material and frequent checks will be conducted. 16 Jun 2018 112,043 lbs/day Immediate investigation and documented corrective action Cause and Corrective Action(s)— BMP Event. The lime kiln was dumping dregs because of high torque on clarifiers, during this time the sump at#11 recovery boiler was left open to aide in clean up. During this time, one of the oxidized black liquor pumps blew a seal and sent black liquor right into the sewer. WTP operators captured most of the black liquor material in #1 clarifier and treated it with our color reducing coagulant. The pump was taken out of service and the seal was repaired. Blue Ridge Paper Products Inc. dba Evergreen Packaging—Canton Mill 175 Main Street • PO Box 4000 Canton, North Carolina 28716 • 828-646-2000 Z.WEW FOLDER DIRECTORYIEnvironmentallWATERWew folderrBMPIBMP Events12018 Annual BMP Summary.doc 29 Mar 2019,Page 4 Date(s) Total Influent Action Level and Summary (TI) Color Jun 27—Jul 1 59,017 lbs/day 2-day UAL/2-day UAL/ 1-day UAL— Investigation and 2018 60,568 lbs/day documented corrective action 65,485 lbs/day 53,915 lbs/day Cause and Corrective Action(s) — BMP Event. The pulp mill 82,026 lbs/day began acid washing digesters on Jun 26th. The wash sent a steady stream of high color material to the WTP for 5 days. Color reducing polymer was added and the secondary effluent color numbers were kept under control. Acid washing digesters usually occurs more often. The washes had been put off for a while due to the run ability of the pulp mill. Pulp mill personnel will work to keep washes on schedule. 4 —5 Jul 2018 58,822 lbs/day 2-day LAL/ 1-day UAL - Investigation and documented 81,657 lbs/day corrective action Cause and Corrective Action(s)— BMP Event. During an acid wash of#10 digester in the pulp mill, the contents of the digester were dumped and the gate on the sump to the sewer was left open. WTP received very high color material which they attempted to capture in #1 clarifier. That material was then slowly fed back into the system and treated with our color reducing polymer. More frequent checks of area sewers and sump pumps to ensure gates are closed and sumps are pumping where they are supposed to be. Blue Ridge Paper Products Inc. dba Evergreen Packaging—Canton Mill 175 Main Street • PO Box 4000 Canton, North Carolina 28716 • 828-646-2000 Z WEW FOLDER DIRECTORYIEnvironmentallWATERINew folderlBMPIBMP Events12018 Annual BMP Summary doc 29 Mar 2019,Page 5 Date(s) Total Influent Action Level and Summary (TI) Color 5—8 Aug 2018 55,981 lbs/day 2-day UAL/ 2-day UAL/ 1-day UAL - Investigation and 67,269 lbs/day documented corrective action 61,609 lbs/day 80,339 lbs/day Cause and Corrective Action(s)—BMP Event. On 8/5 3 digester liquor heat exchangers in the lower end were identified as possible color contributors, all 3 had significant leaks. They were scheduled to be repaired during the pulp mill outage on 8/8. The WTP continued to see color on 8/7 and 8/8. The MRP was down from 8/3 thru 8/9. This had a negative impact on pine bleach plant closure. On Tuesday night 8/7 the recovery area overflowed weak wash to the sewer, this high pH material when mixed with bleach plant filtrate causes high color. On 8/7 a sump on#10 recovery failed to kick on due to a stuck ball float. This resulted in black liquor going over the berm and into the sewer. During this time the black liquor mix tank on the 2nd floor of#10 recovery overflowed to the sewer. During the outage the 5th and 6th effect of the Swenson's evaporators were steamed to reduce color. 23—24 Aug 62.806 lbs/day 2-day UAL - Investigation and documented corrective 2018 67.155 lbs/day action Cause and Corrective Action(s)—BMP Event. On Thursday 8/23 an unplanned outage took place on #11 recovery boiler and the pine pulp mill. A combination of black liquor cyclone instability and leaking digesters led to the outage taking place. At the same time a boil out of the West GB evaporator set took place. During the boil out color in the corresponding sewer was very high. It appears high color material made it out of the evaps and into the sewer. We continued to see high color material through the next 24 hours. Color reducing coagulant was added at the WTP. Secondary effluent color on the following days was elevated but still well below our limit. Blue Ridge Paper Products Inc. dba Evergreen Packaging—Canton Mill 175 Main Street • PO Box 4000 Canton, North Carolina 28716 • 828-646-2000 Z:INEW FOLDER DIRECTORYIEnvironmentallWATERINew folderlBMPIBMP Events12018 Annual BMP Summary doc 29 Mar 2019,Page 6 Date(s) Total Influent Action Level and Summary (TI) Color 14— 16 Sept 67,269 lbs/day 2-day UAL/ 1-day UAL - Investigation and documented 2018 61,609 lbs/day corrective action 80,339 lbs/day Cause and Corrective Action(s)—Non-BMP Event. During a scheduled cyclone wash on number 11 recovery boiler, the Swenson's black liquor evaporators were taken down for a boil out of the system. During the boil out it was discovered that the system was very dirty and required more cleaning and dumping than usual. The WTP was notified of the high color material coming our way. The WTP operators opened the gate to #1 clarifier to catch the high color material. #1 clarifier was filled to about 75% capacity. Further cleaning of the Swenson's revealed fiber in the system this instigated another boil out and thus more black liquor color to the WTP. #1 clarifier was then filled to nearly 100% of its capacity. Over the next two days problems with the Swenson's continued. And a similar process was carried out. The evaporators were restored to full working order on 9-17. 12 — 16 Oct 70,611 lbs/day 2-day UAL/ 2-day UAL / 1-day UAL - Investigation and 2018 86,356 lbs/day documented corrective action 58,060 lbs/day 105,203 lbs/day Cause and Corrective Action(s) — Non-BMP Event. Both 73,947 lbs/day evaporator were taken down for a planned boil out. While offline, maintenance personnel identified several issues which prevented startup. Several attempts were made to start up throughout the week with no success. Each time the evaporators were started up, they had to go down and flush the system, Communication was excellent during this time and the high color material was all dealt with at the WTP. Blue Ridge Paper Products Inc dba Evergreen Packaging—Canton Mill 175 Main Street • PO Box 4000 Canton, North Carolina 28716 • 828-646-2000 Z.WEW FOLDER DIRECTORY1EnvironmentallWATER1New folderlBMP1BMP Events12018 Annual BMP Summary doc 29 Mar 2019,Page 7 r Date(s) Total Influent Action Level and Summary (TI) Color 9 — 10 Nov 79,096 lbs/day 1-day UAL/ 2-day UAL - Investigation and documented 2019 70,362 lbs/day corrective action Cause and Corrective Action(s)— BMP Event. The mud filter filtrate sump in the causticizing area overflowed to the sewer causing high color material to come to the WTP. Additionally on both the 9th and 10th weak wash overflowed to the sewer and mixed with the bleach plant material which produced higher color material once in the sewer. The filtrate sump was cleaned out to support higher flow and prevent that area from flooding. 20 —21 Dec 57,754 lbs/day 2-day LAL - Investigation and documented corrective 2019 56,724 lbs/day action Cause and Corrective Action(s)— BMP Event. On 12/20 a leak developed in the east un oxidized black liquor storage tank. It was discovered during the daily BMP inspection of the area. While most of the leak was being picked up by the area sump, some of the material made its way into the sewer and into the WTP. A barrier was constructed to divert the leak entirely into the sump area. The tank was taken out of service and repaired on the next outage. On 12/21 #10 recovery furnace tripped off and the black liquor cyclones over ran into the sewer. The recovery area crew notified the WTP in a timely manner and that high color material was captured and treated. Maintenance worked on cyclone level indicators to prevent another trip from occurring. Please contact us if you have questions regarding this information. Sincerely, Jacob Trantham WWTP Lab Supervisor Evergreen Packaging—Canton Mill Jacob.trantham@everpack.com Blue Ridge Paper Products Inc. dba Evergreen Packaging—Canton Mill 175 Main Street • PO Box 4000 Canton, North Carolina 28716 • 828-646-2000 Z•WEW FOLDER DIRECTORYIEnv ronmentallWATERWew folderlBMP1BMP Events12018 Annual BMP Summary.doc . , Y 29 Mar 2019, Page 8 cc: Mr. Landon Davidson DWQ Regional Supervisor, Asheville Regional Office North Carolina Department of Environmental Quality 2090 U.S. Highway 70 Swannanoa, NC 28778 Blue Ridge Paper Products Inc. dba Evergreen Packaging—Canton Mill 175 Main Street • PO Box 4000 Canton, North Carolina 28716 • 828-646-2000 Z.WEW FOLDER DIRECTORYIEnv ronmental1WATERINew folderIBMP1BMP Events12018 Annual BMP Summary.doc