Loading...
HomeMy WebLinkAbout310138_Sludge Survey (Testing Dates)_201804053 1 --13V April 3, 2018 Jonathan Miller Agriment Services, Inc P.O. Box 1096 . Beulaville, NC 28518 RE: Sludge Survey Testing Dates Dear Mr. Miller. ROY COOPER aov or MICHAEL S. REGAN Secretory LINDA CULPEPPER Interim Director PiECEIVED/NMENR/M APR 0 5 2018 Water Quality Regional Operations Section Wilmington Regional Office The Division of Water Resources (Division) received your sludge survey information for many of the Agriment serviced fauns on January 12, 2018. With the survey results, you requested an extension of the sludge survey requirement for the lagoons at those facilities. Due to the amounts of treatment volume available, the Division agrees that a sludge survey is not needed for some of the lagoons until 2019, 2020, 2021 or 2022. See the attached table to determine the allowed extension date for each lagoon. However, due to the amount of treatment volume available, and the rate of sludge accumulation, the Division feels that an extension is not appropriate for lagoon #2 at facility # 31-371, lagoon #1 at facility # 52-9, lagoon #1 at facility #31-576, lagoon #1 at facility #24-76, and lagoon #2 at facility #31-376. The next sludge survey for these lagoons should be performed before December 31, 2018. Thank you for your attention to this matter. If you have any questions, please call me at (919) 807-6340. Sincerely, Miressa D. Garoma Animal Feeding Operations Program Attachment: Extension List cc: Wilmington Regional Office; Water l2irality Regional Operations Section Washington Regional Office, Water Quality Regional Operations Section Central Files ^� IVothtrag Compares'.,. State of North Carolina I Enry ronmmtal Quality I Dmzon of Water Reaoarcea Water Quality Regional Operatlooa Sxtlon 1636 Mail Sernce Center I Ralcieh, North Carolina 27699-1636 i gmdmamh `ri,ftS�`4 i Z3'k a49 't;;kr4 l - . 41 Ci List of Agriment Services, Inc facilities granted sludge survey extension. Date of Survey Farm Facitly # Lagoon # Extension Until 8/4/2017 James Brown 31-371 1 12/31/2020 8/4/2017 James Brown 31-371 2 No Extension- 12/31/2018 8/11/2017 Glenn Haddock Front Big Prima 74-6 3 (FBP) 12/31/2022 1/13/2017 Ann Herrin 31-685 1 12/31/2020 5/18/2017 JC Howard (Taylor Farm 5241 Taylor 2 12/31/2021 5/18/2017 JC Howard No Name Farm 52-9 1 Front No Extension-12/31/2018 5/18/2017 JC Howard No Name Farts 52-9 2 Back 12/3112020 5/18/2017 JC Howard Zimmerman Farm 54-144 1 12/31/2022 7/18/2017 Graham Kennedy 31-133 2 12/31/2019 1012012017 Gerald Knowles PLT 2319 31-285 1 12/31/2019 9/29/2017 OK Farms Inc 31-138 2 12/31/2019 6/2/2017 The Pig Ranch Front Farts 54-4 1 1 Front 12/31/2022 6/212017 The Pig Ranch Front Farm 544 3 Front 12/31/2022 6/2/2017 The Pig Ranch Front Farm 54 4 4 Front 12/31/2022 6/2/2017 The Pig Ranch Back Farm 544 2 Back 12/31/2022 9/22/2017 Renewable Transport (Pipeline Farm 31-576 1 No Extension-12/31/2018 9/22/2017 Renewable Transport (Pipeline Farm 31-576 2 12/31/2022 11117/2017 Ward Stokes State Line #1 2476 1(West) No Extension-12/31/2018 11/17/2017 Ward Stokes State Line #2 2476 2 East 12/31/2022 4/17/2017 Dwi ht Walker 31-530 1 1 12/31/2021 12115/2017 Mike Wallace Old Farm 31-440 1 1 12/31/2022 3/20I2017I WBW Sow Farts, LLC Du lin 331-376 2 1 No Extension-12/3112018 Only the lagoons specifically mentioned above for these facilities have been evaluated at this time. Any other lagoons must have sludge evaluations performed by December 31, 2018 unless granted an extension under separate letter.