Loading...
HomeMy WebLinkAbout20140762 Ver 4_April 17 Sediment inspection_20190422Wetland Inspection Report Project Num: 20140762 Project Name: NCDOT- US 221 (R-2915B) County: Watauga Location: NCDOT- US 221 (R-2915B) Latitude: +35' 16' 05" SW Plan Location Site Owner Name NC DOT PDEA Inspection Date: 4/17/2019 Reason for Inspection Routine Inspection Type: Site Inspection (DOT) Inspection Contact Person: On -Site Representative(s): Version: 4 Status: Issued Project Type: Road/Highway Widening Region: Central Title: Primary Inspector: Dave Wanucha Secondary Inspector(s): Facility Compliance Status: ❑ Compliant 0 Not Compliant Program Areas: Standards/Sediment Question Areas: Unpermittable Activities Inspection Summary: A follow up inspection will occur in May. Longitude: -81 ° 30' 10" Phone: Phone: 336-776-9703 page: 1 Site Number: 20140762 Owner: Thorpe, Gregory Inspection Date: 4/17/2019 Inspection Type: Site Inspection (DOT) Reason for Visit: Routine Unpermittable Activities Yes No NA NE # Note: This section should be completed only if the impact is unpermittable (eg. Sediment, draining wetlands, etc.). Is stream(s) free of unpermittable impacts? ❑ 0 ❑ ❑ Is wetland(s) free of unpermittable impacts? ❑ 0 ❑ ❑ Is open water(s) free of unpermittable impacts? ❑ ❑ 0 ❑ Are other standards being met (turbidity, pH, etc.) in all surface waters onsite? ❑ ❑ 0 ❑ Are surface waters on the site free of illegal discharges? ❑ ❑ 0 ❑ Comment: Site 6 was ok but removed sediment needed to be taken to upland site. Site 13A needed additional sediment and 57 stone removed. SDO near Site 8 needed sediment removed and fencing repaired. Sites 2A and B needed a boulder removed and sediment removed from SDOs. Site 13A needs to be checked for sediment around inlet of temporary culvert. Bridge drains discharge directly to wetlands on B-Section. page: 2