Loading...
HomeMy WebLinkAbout660014_Compliance Evaluation Inspection_20190411Facility Number ® - C� Sd'Division of Water Resources 0 Division of Sail and Water Conservation 0 Other Agency -L'I - Type of Visit:Com nce Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: rl % Arrival Time: D t Departure Time: County: Farm Name: 1ki z Ro 5 e .3 Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Onsite Representative: 14 /I--) h') &r. Certified Operator: Back-up Operator: Title: Location of Farm: Latitude: Phone: Phone: Integrator: Certification Number: Certification Number: Longitude: Design Current Design Current Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Wean to Finish Wean to Feeder Feeder to Finish r '"r) Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other Other Layer Non -La er Pullets Poults Design Current Dairy Cow Dairy Calf Dairy Heifer Dry Cow ,Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow Region: Design Current Capacity Pop. Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes F �NoE3 NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ YesN ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ YesgNo ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ro L]NA F]NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes ❑ No ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 2/4/2015 Continued Facility Number: 1(4 Date of inspection: t / / Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ NA r ❑ NA Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes eNo NA (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA waste management or closure plan? ❑ NE ❑ NE ❑ NE ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environments hreat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑Yes n NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes KNO ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes UNo ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes ONo ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 10 t /3 dr+n s 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? — / ❑ Yes I ANO . TKNo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes �No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ❑ NA ❑ NE Re uired Records & Documents N 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ❑ ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ❑ NA ❑ NE the appropriate box. ❑WUP []Checklists []Design E] Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? 1 f yes, check the appropriate box below. ❑ Yes EfNo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis [] Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑Yes No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes [] No ❑ NA ❑ NE Page 2 of 3 2/4/2015 Continued Facili Number: .n - Date of Inspection: /r / and report mortality rates that were higher than normal? 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes N ❑ NA ❑ NE 25. is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ❑ NA ❑ NE the ap opriate box(es) below. ❑ Yes ❑ No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: ailure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Yes ❑ No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Non-compliant sludge levels in any lagoon 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No [] NA ❑ NE List structure(s) and date of First survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ❑ No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 3I. Do subsurface the drains exist at the facility? Ifyes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes ❑ No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No [] NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional panes as necessarv). K1�e ( #/ G. 7-0- II S IrtieJye Sc(rvo7 -7— Zy_/7 Reviewer/ I nspvctor Reviewer/Inspector Name: Reviewer/Inspector Signature: 'fit S Zj Page 3 of 3 Phone: 7`J - Y Zy o Date: Y /I I 2/4/2015