Loading...
HomeMy WebLinkAboutNCS000578_Emails RE Outfalls_20160126Bennett, Bradley From: Hartfield, Ross Evan <Ross.Hartfield@duke-energy.com> Sent: Tuesday, January 26, 2016 10:18 AM To: Riddle, Rick L Cc: Georgoulias, Bethany; Pickle, Ken; Bennett, Bradley; Pruett, Jeremy J.; Woodward, Tina R Subject: RE: Buck follow-up information and coordination from 11/4/2015 site visit Attachments: Buck Stormwater Inquiry w_comments and Duke responses.xlsx Rick, attached is an Excel file containing our responses to your comments regarding Buck Steam Station's stormwater permit application. An updated stormwater map will follow when it becomes available. Bethany, I hope to contact you later today about one remaining issue with the Buck combined cycle plant. • %, DOKE ' E NE RGY- Ross E. Hartfield Environmental Specialist 2 1 EHS CCP Compliance and Permitting 526 South Church Street I EC13K I Charlotte, NC 28202 Office: 980 373 6583 Cell: 225 2813971 Fax: 704 382 0249 Ross.Hartfield@duke-enerey.com From: Pickle, Ken [mailto:ken. pickle@ncdenr.gov] Sent: Monday, January 25, 2016 8:31 AM To: Hartfield, Ross Evan; Bennett, Bradley Cc: Georgoulias, Bethany; Riddle, Rick L Subject: RE: Buck follow-up information and coordination from 11/4/2015 site visit Hi Ross, Please contact Bethany for comments related to the Buck CTCC facility, and Rick Riddle for comments on the Buck Steam Station. These two have the assignment to draft the respective permits. I'm happy to continue to contribute based on the fact that I compiled the questions, and on my visit to the site, but the work of drafting the permits is now on their desks. Thanks, Ken Ken Pickle Stormwater Program Specialist DEMLR Stormwater Permitting Program Department of Environmental Quality 919 807 6376 office ken. pickle@ncdenr.gov 1612 Mail Service Center, Raleigh, NC 27699-1612 512 N. Salisbury St, Raleigh, NC 27604 r Nothing Compares Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Hartfield, Ross Evan [mailto: Ross. Hartfield@duke-energy.com] Sent: Saturday, January 23, 2016 6:47 PM To: Bennett, Bradley <bradley.ben nett@ncdenr.gov> Cc: Pickle, Ken <ken.pickle@ncdenr.gov>; Georgoulias, Bethany<bethany.georgoulias@ncdenr.gov>; Riddle, Rick L <rick.riddle@ncdenr.gov> Subject: RE: Buck follow-up information and coordination from 11/4/2015 site visit Bradley, Almost all of your comments have been addressed. I hope to contact Ken this coming week to discuss some of your comments. •N DUDE ' ENERGY. Ross E. Hartfield Environmental Specialist 2 1 EHS CCP Compliance and Permitting 526 South Church Street I EC13K I Charlotte, NC 28202 Office: 980 373 6583 Cell: 225 2813971 Fax: 704 382 0249 Ross.Hartfield@duke-energy.com From: Bennett, Bradley [mailto: brad ley. bennett(ancdenr.gov] Sent: Wednesday, January 13, 2016 4:19 PM To: Hartfield, Ross Evan; Cahoon, Steve Cc: Pruett, Jeremy J.; Woodward, Tina R; Pickle, Ken; Georgoulias, Bethany; Riddle, Rick L Subject: RE: Buck follow-up information and coordination from 11/4/2015 site visit Ross, Steve Thanks for the information on the Buck facility. We have reviewed the submitted info and have a few clarifications/questions. I have attached the spreadsheet you sent with an added column on the right with our clarifications/questions included. m Bradley Bennett Stormwater Permitting Program Phone: (919) 807-6378 NC Division of Energy, Mineral and Land Resources Fax: (919) 807-6494 1612 Mail Service Center Email: bradley.bennetta( ncdenr.gov Raleigh, NC 27699-1612 Web: http://portal.ncdenr.org/web/Ir/stormwater Email correspondence to and from this address may be subject to public records laws From: Hartfield, Ross Evan [mailto: Ross. Hartfield@duke-energy.com] Sent: Monday, January 11, 2016 2:35 PM To: Pickle, Ken <ken.pickle@ncdenr.gov>; Bennett, Bradley <bradley.bennett@ncdenr.gov> Cc: Cahoon, Steve <Steve.Cahoon@duke-energy.com>; Pruett, Jeremy J. <Jeremy.Pruett@duke-energy.com>; Woodward, Tina R <Tina.Woodward@duke-energy.com> Subject: Buck follow-up information and coordination from 11/4/2015 site visit Ken, Attached are Duke's responses (see Excel file) to your questions and concerns below. We are working on updating the Buck Steam Station stormwater map to reflect the newly identified outfalls. We will pass that along when it becomes available. Please let me know if you have any further questions. DUKE EMERY. Ross E. Hartfield Environmental Specialist 2 1 EHS CCP Compliance and Permitting 526 South Church Street I EC13K I Charlotte, NC 28202 Office: 980 373 6583 Cell: 225 2813971 Fax: 704 382 0249 Ross. Hartfield@duke-energy.com From: Pickle, Ken [mailto:ken.pickle@ncdenr.gov] Sent: Monday, November 30, 2015 12:03 PM To: Cahoon, Steve Cc: Bennett, Bradley; Randall, Mike; Georgoulias, Bethany Subject: Buck follow-up information and coordination from 11/4/2015 site visit *** Exercise caution. This is an EXTERNAL email. DO NOT open attachments or click links from unknown senders or unexpected email. *** Hi Steve, Thanks for your assistance at Buck earlier this month. While there we discussed additional information and confirmation needs to help us eventually process the two permit applications in hand. General permitting: During our discussions at Buck I think we agreed to separately process both in-house applications, one for the Steam Station, and one for the CTCC station. Please confirm that at this time it is still Duke's intent to permit both facilities separately for stormwater discharges. Buck Steam Station • Please confirm the list of the site stormwater outfalls, and expand the list if necessary to fully identify all the site outfalls. Provide updated site maps indicating any additional features: o Immediately northeast of SWO02 there appeared to be one or two additional outfalls, apparently previously unidentified. o Along the river bank in the vicinity of outfall SW056, and continuing east to SW073 it was not clear that all outfalls have been positively identified. • Please provide information on the size of the storm that would cause an overflow or bypass from the Yard Sump. • Please refresh us on the status of the paired oil traps (north of the boat house) wrt any potential for discharges from them. Although we discussed them while visiting, I can't recall the comments made about them. • Please refresh me on the flow in SW002. My meeting notes seem to indicate that Duke reports a dry weather flow in that outfall. Buck CTCC Station • It appeared that there may have been some recent changes to the drainage features not reflected in the site maps we currently have in hand. The drainage features and contributing areas east of the Admin/Control Building around the entrance gate and CB40 are unclear to us. In the same general vicinity there appeared to be an additional manhole south of the cooling towers not shown on our drawings. Please provide expanded and updated drainage maps that show the full extent of all site stormwater drainage. • We need additional information on the pipe and drainage system that carries drainage from around the ash basin into the catch basin that then flows to the stormwater pond. Hs this been submitted in the wastewater application? Can this flow be removed from the stormwater drainage at the CT site? • While on site there was some confusion as to the ultimate destination of the water discharge from the o/w separator immediately south of the steam turbine building. Please confirm that that flow does/does not go to the stormwater drainage system. Thanks for your assistance Steve. Please contact me with any questions. Best Regards, Ken 4