HomeMy WebLinkAboutNCS000578_Emails RE Outfalls_20160126Bennett, Bradley
From: Hartfield, Ross Evan <Ross.Hartfield@duke-energy.com>
Sent: Tuesday, January 26, 2016 10:18 AM
To: Riddle, Rick L
Cc: Georgoulias, Bethany; Pickle, Ken; Bennett, Bradley; Pruett, Jeremy J.; Woodward, Tina R
Subject: RE: Buck follow-up information and coordination from 11/4/2015 site visit
Attachments: Buck Stormwater Inquiry w_comments and Duke responses.xlsx
Rick, attached is an Excel file containing our responses to your comments regarding Buck Steam Station's stormwater
permit application. An updated stormwater map will follow when it becomes available.
Bethany, I hope to contact you later today about one remaining issue with the Buck combined cycle plant.
• %, DOKE
' E NE RGY-
Ross E. Hartfield
Environmental Specialist 2 1 EHS CCP Compliance and Permitting
526 South Church Street I EC13K I Charlotte, NC 28202
Office: 980 373 6583
Cell: 225 2813971
Fax: 704 382 0249
Ross.Hartfield@duke-enerey.com
From: Pickle, Ken [mailto:ken. pickle@ncdenr.gov]
Sent: Monday, January 25, 2016 8:31 AM
To: Hartfield, Ross Evan; Bennett, Bradley
Cc: Georgoulias, Bethany; Riddle, Rick L
Subject: RE: Buck follow-up information and coordination from 11/4/2015 site visit
Hi Ross,
Please contact Bethany for comments related to the Buck CTCC facility, and Rick Riddle for comments on the Buck Steam
Station. These two have the assignment to draft the respective permits.
I'm happy to continue to contribute based on the fact that I compiled the questions, and on my visit to the site, but the
work of drafting the permits is now on their desks.
Thanks,
Ken
Ken Pickle
Stormwater Program Specialist
DEMLR Stormwater Permitting Program
Department of Environmental Quality
919 807 6376 office
ken. pickle@ncdenr.gov
1612 Mail Service Center, Raleigh, NC 27699-1612
512 N. Salisbury St, Raleigh, NC 27604
r Nothing Compares
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Hartfield, Ross Evan [mailto: Ross. Hartfield@duke-energy.com]
Sent: Saturday, January 23, 2016 6:47 PM
To: Bennett, Bradley <bradley.ben nett@ncdenr.gov>
Cc: Pickle, Ken <ken.pickle@ncdenr.gov>; Georgoulias, Bethany<bethany.georgoulias@ncdenr.gov>; Riddle, Rick L
<rick.riddle@ncdenr.gov>
Subject: RE: Buck follow-up information and coordination from 11/4/2015 site visit
Bradley,
Almost all of your comments have been addressed. I hope to contact Ken this coming week to discuss some of your
comments.
•N DUDE
' ENERGY.
Ross E. Hartfield
Environmental Specialist 2 1 EHS CCP Compliance and Permitting
526 South Church Street I EC13K I Charlotte, NC 28202
Office: 980 373 6583
Cell: 225 2813971
Fax: 704 382 0249
Ross.Hartfield@duke-energy.com
From: Bennett, Bradley [mailto: brad ley. bennett(ancdenr.gov]
Sent: Wednesday, January 13, 2016 4:19 PM
To: Hartfield, Ross Evan; Cahoon, Steve
Cc: Pruett, Jeremy J.; Woodward, Tina R; Pickle, Ken; Georgoulias, Bethany; Riddle, Rick L
Subject: RE: Buck follow-up information and coordination from 11/4/2015 site visit
Ross, Steve
Thanks for the information on the Buck facility. We have reviewed the submitted info and have a few
clarifications/questions. I have attached the spreadsheet you sent with an added column on the right with our
clarifications/questions included.
m
Bradley Bennett
Stormwater Permitting Program Phone: (919) 807-6378
NC Division of Energy, Mineral and Land Resources Fax: (919) 807-6494
1612 Mail Service Center Email: bradley.bennetta( ncdenr.gov
Raleigh, NC 27699-1612 Web: http://portal.ncdenr.org/web/Ir/stormwater
Email correspondence to and from this address may be subject to public records laws
From: Hartfield, Ross Evan [mailto: Ross. Hartfield@duke-energy.com]
Sent: Monday, January 11, 2016 2:35 PM
To: Pickle, Ken <ken.pickle@ncdenr.gov>; Bennett, Bradley <bradley.bennett@ncdenr.gov>
Cc: Cahoon, Steve <Steve.Cahoon@duke-energy.com>; Pruett, Jeremy J. <Jeremy.Pruett@duke-energy.com>;
Woodward, Tina R <Tina.Woodward@duke-energy.com>
Subject: Buck follow-up information and coordination from 11/4/2015 site visit
Ken,
Attached are Duke's responses (see Excel file) to your questions and concerns below. We are working on updating the
Buck Steam Station stormwater map to reflect the newly identified outfalls. We will pass that along when it becomes
available. Please let me know if you have any further questions.
DUKE
EMERY.
Ross E. Hartfield
Environmental Specialist 2 1 EHS CCP Compliance and Permitting
526 South Church Street I EC13K I Charlotte, NC 28202
Office: 980 373 6583
Cell: 225 2813971
Fax: 704 382 0249
Ross. Hartfield@duke-energy.com
From: Pickle, Ken [mailto:ken.pickle@ncdenr.gov]
Sent: Monday, November 30, 2015 12:03 PM
To: Cahoon, Steve
Cc: Bennett, Bradley; Randall, Mike; Georgoulias, Bethany
Subject: Buck follow-up information and coordination from 11/4/2015 site visit
*** Exercise caution. This is an EXTERNAL email. DO NOT open attachments or click links from unknown senders or
unexpected email. ***
Hi Steve,
Thanks for your assistance at Buck earlier this month. While there we discussed additional information and
confirmation needs to help us eventually process the two permit applications in hand.
General permitting: During our discussions at Buck I think we agreed to separately process both in-house applications,
one for the Steam Station, and one for the CTCC station. Please confirm that at this time it is still Duke's intent to permit
both facilities separately for stormwater discharges.
Buck Steam Station
• Please confirm the list of the site stormwater outfalls, and expand the list if necessary to fully identify all the site
outfalls. Provide updated site maps indicating any additional features:
o Immediately northeast of SWO02 there appeared to be one or two additional outfalls, apparently previously
unidentified.
o Along the river bank in the vicinity of outfall SW056, and continuing east to SW073 it was not clear that all outfalls
have been positively identified.
• Please provide information on the size of the storm that would cause an overflow or bypass from the Yard Sump.
• Please refresh us on the status of the paired oil traps (north of the boat house) wrt any potential for discharges
from them. Although we discussed them while visiting, I can't recall the comments made about them.
• Please refresh me on the flow in SW002. My meeting notes seem to indicate that Duke reports a dry weather
flow in that outfall.
Buck CTCC Station
• It appeared that there may have been some recent changes to the drainage features not reflected in the site maps
we currently have in hand. The drainage features and contributing areas east of the Admin/Control Building around the
entrance gate and CB40 are unclear to us. In the same general vicinity there appeared to be an additional manhole
south of the cooling towers not shown on our drawings. Please provide expanded and updated drainage maps that
show the full extent of all site stormwater drainage.
• We need additional information on the pipe and drainage system that carries drainage from around the ash basin
into the catch basin that then flows to the stormwater pond. Hs this been submitted in the wastewater
application? Can this flow be removed from the stormwater drainage at the CT site?
• While on site there was some confusion as to the ultimate destination of the water discharge from the o/w
separator immediately south of the steam turbine building. Please confirm that that flow does/does not go to the
stormwater drainage system.
Thanks for your assistance Steve. Please contact me with any questions.
Best Regards,
Ken
4