April 17, 2019
Nfr. Tom Copolo
Plant Manager
Duke Energy Mayo Steam Electric Porkcr Plant
10660 Boston Rd
Roxboro NC 27573
Subject: Compliance Evaluation Inspection
Duke Energy Mayo Steam Electric Power Plant
NPDES Permit No. NC0038377
Person County
Dear Mr. Copolo:
On \March 20, 2019, Clieng Zhang of the Raleigh Regional Office (RRO) conducted a
compliance evaluation inspection of the subject facility. The assistance provided by y1r. Heath
Slade, the operator in responsible charge (ORC), and NIs. Leanne Wilson. the backup ORC, was
greatly appreciated as it facilitated the inspection process. The inspection report is attached. The
following observations were made:
Mayo Steam Electric Power PIant is permitted to dischargrc wa,,te«'ater from the ash pond via
Outfall 002 (with wastewater From a variety of sources drained into %is Internal Outfalls
002A. 00213, 00S, 009, and 01 I ), and storm« ater runoff from Outf tlls 004, 005, 006c, 006d,
and 006c into Nlayo Reservoir, v hich 1s classified DVS-k' waters in the Roanoke River Basin.
1. The current permit became effective on AuV,ust 1, 2018,
2. The facility was found compliant with the conditions specified in SOC No. S I S-005.
3. All outfalls were observed during the inspection, the follo%ving outfalls were not
discharging at the time of inspection:
• Out fal1001, discharge only occurs «lien the cooling towers and circulation water
system are drained (less than once per year).
• Internal Out fat 1 009, FGD blowvdow n is no longer discharged to the ash pond, instead,
is let evaporated at the FGD pond with thermal evaporator.
• Outfalls 006c, 006d, and 006e were pennanently scaled %%ith no more stonnwater
discharge.
• Internal Outfall 00213, yard sump overflow %ill be routed to the new lined retention
basin (under construction),
• Outfalls 004 and 005, stormwater runoff will be routed (piped) upstream to the nevv
Outfall 002 (under construction)_
Discharge was observed at following outfall.w: Outfall 002 (from the ash pond). Internal
Outfall 011 (from domestic wastewater treatment plant), and Intenial Outfal1 008 (from
cooling tower blowdow n).
4. Construction was on,,oin+a for following items-
• New Outfall 002. downstream current 002:
• New Storm%vater Outfal1. w ith combined storniwater runoff from current Out falIs 004
and 003, upstream new Outfall 002;
• Lined retention basin and new FGD pond_
5. Two constructed seeps (S-01 and S-02) specified in SOC No. 13-005 were observed
during the inspection.
6. The facility had not started dewatering from the ash pond at the time of inspection.
7. The ORC maintains a daily logbook. Lab results, chain -of -custody fo rns, and D%[Rs
were complete and current, kept in good order and ready for re%iew. September 2018
DMR data were compared to lab bench sheets; no data transcription errors were noted.
Effluent flow meter at Outfall 002 wvere calibrated annualh,.
S. The right of way- to the outfalls was well maintained. No risible impacts were noted
immediately downstream the Outfall 002.
9. Field lab parameter (Certificate No. 5064) calibration and analysis records were reviewed
during the inspection.
If you have any questions regarding the attached reports or any of the findings, please contact
Cheng Zhang at: (919) 791-4200 (or email: chen+g.zhan+_.'d ncdenr.+,ov).
Sinccrcly,
Rick Bolich, L.G.
Assistant SupM isor
Dix ision of Water Resources
Raleiah Regional Office
ATTACHMENTS
Compliance Inspection Reports
Cc: Central Files w attachment
Ralei-h Regional Office w attachment
Leanne Wilson, Nlayo Plant (electronic copy only)
n ied Slat7s Env:mr.merol Prcte:::_n-%gercr
EPA Form Approved
rrasr, cn � : 2C.tE; ONIS No 2040-0057
Water Compliance Inspection Report Approval exp res 3-31-98
Section A. National Data System Coding (i.e. PCSI
Transaction Code NPDES
yr'me-day
Inspect,on Type
Inspector
Fac Type
1 u 2 1 1 3 I NC0038377 Ill 12
LJ LJ
19;03.2p
17 18 I r, I
LI
19 1 e I
l�J
201
IJ
21
1
1 1 1 1 1
1
1 1 1
I
I
6
Inspect;cri Work Days Facddy Self-hlonitcnng Evaluatior Rating
B t
CA
Reserred
67 70 j (
71 L_j
72 N 73 74
751
80
I I I 11
Section B Facility Data
Name and .ocation of Facility-nspected (For Industr ai Users d scharg;ng to `rOT'N also nclude
E'3t.^ir T me,Qate
Permit Effective oat-
POTV'1 name and NPDES Derm t Number)
��vaA;ti1 17_�r_0
,a,aaa,
Mayo Steam Etectr-c Power Plant
10660 Boston Rd
-rx;t T me. Date
Permit
Expiration Date
R>xbcro NC 27573
n 1 UPM 13 01,20
23-D7 31
Namersj cf Onsite Representative; s)rTitles(s.. Phone and Fax Nurin.ter(s, I Other Facil,ty Data
Joseph Heath Sla4e.'ORCi336.597.7398f
Name. Address of Respons ble OfficiabTitfelPhane and Fax Number
Tom Cepolo,10660 Boston Rd Roxboro NC 27 574 Plant Manager'336-59-4307 Contacted
No
Section C Areas Evaluated During Inspection (Check only those areas evaluated)
Permit 0 Flow Measurement 0 Operations & fvlaintenanre M Records/Reports
Self -Monitoring Program M Facility Site Review M Compliance Schedules M Effluent/Receiving Waters
Laboratory
Section D Summary of FindinglComments {Attach additional sheets of narrat ve and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspectcr(s:
Cheng Zhang
Signature of Management 0 A Reviewer
EPA Form 3560-3 (Rev 9-94) Previous eclUns are obsolete
AgencyrOffice)Phcne and Far N..r-ters
RRO AQ. 919-791.4200
Agency Qff;ce.Pvcne and Fax N.,mbers
Date
(WI 7/Zot- I
Dale
Page# 1
NPOES yrimolda/ Irspeceon Type
3 NCOt339377 11 12I 19103/20 ' 17 18 Irl r
Section D: Summary of FindinglCommenls (Attach additional sheets of nar•ahve and checklists as necessary}
The facility was found compliant with the conditions specified in SOC No Si 8-005.
All outfalls were observed during the inspection, the following outfalls were not discharging at the time
of inspection:
Outfall 001, discharge only occurs when the cooling towers and circulation water system are drained
(less than once per year).
Internal Outfall 009, FGD blowdown is no longer discharged to the ash pond instead Is let evaporated
at the FGD pond with thermal evaporator.
Outfalls 006c, 006d, and 006e were permanently sealed with no more stormwater discharge.
Internal Outfall 002B, yard sump overflow will be routed to the new lined retention basin (under
construction).
Outfalls 004 and 005, stormwater runoff will be routed (piped) upstream to the new Outfall 002 (under
construction).
Discharge was observed at following outfalls
Outfall 002, discharge from the ash pond
Internal Outfalls 011 and 008 discharge from domestic wastewater treatment plant and cooling tower
blowdown, respectively.
Construction was ongoing for following items,
New Outfall 002. downstream current 002.
New Stormwater Outfall, with combined stormwater runoff from current Outfalls 004 and 005,
upstream new Outfall 002'.
Lined retention basin and new FGO pond
Two constructed seeps (S-01 and S-02) specified n 50C No. 18-005 were observed during the
inspection.
The facility had not started dewatering from the ash pond at the time of inspection.
PAVA
Permit: NCD03B3, 7 Owner - Facility- Mal Steam Electric Power Plant
Inspection Date: 07i2M12019 Inspection Type: 4cmpliance Evaluation
Compliance Schedules Yes No NA NE
Is there a compliance schedule for this facility- 0❑ ❑ ❑
Is the facility compliant with the permit and conditions for the review period? M ❑ ❑ ❑
Comment. Special Order By Consent SOC No. S18-005 was issued to Duke Engergy Prociress. LLC
on August 16 2018 which covers both Mao Plant and Roxboro Plant. Duke Engergy is
coin liant with the conditions specified in the SOC
Permit Yes No NA NE
(If the present permit expires in 6 mcnths or less). Has the permittee submitted a new ❑ ❑ ❑
application?
Is the facility as described in the permit?
M❑
❑
❑
# Are there any special conditions for the permit?
M
❑
❑
❑
Is access to the plant site restricted to the general public'?
M
❑
❑
❑
Is the inspector granted access to all areas for inspection')
M
❑
❑
❑
Comment The plant stopped discharginq_fly ash trans art water and bottom ash transport water into
the ash pond before the deadlines ecifiied In the permit (November 1. 2018).
The facility submitted EPA Form 2C for NPDES Outfalls 004 and 005 to the Division on
juanuary 17 2019 as required by the NPDES permit.
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping'? 0❑ ❑ ❑
Does the facility analyze process control parameters for ex NILSS NICRT Settleable ❑ ❑ 0 ❑
Solids, pH DO Sludge Judge. and other that are applicable?
Comment:
Record Keeping
Are records kept and maintained as required by the permit'?
Is all required information readily available, complete and current'?
Are all records maintained for 3 years {lab, reg required 5 years:?
Are analytical results consistent w th data reported on DNIRs'?
Is the chain -of -custody complete?
Dates times and location of sampling
Blame of individual performing the sampling
Results of analysis and calibrat'on
Dates of analysis
Name of person performing analyses
Yes No NA NE
■ ❑ ❑ ❑
❑ ❑ ❑
■ ❑ ❑ ❑
■❑❑❑
❑ ❑ ❑
Page# 3
Permit: NC003B3'7 Owner - Facility: %layo Steam Electric Power Plant
Inspection Date. 0312012019 Inspection Type: Cernrliance E-jalualicn
Record Keeling
Yes No NA NE
Transported COCs
Are DMRs. complete do they include all permit parameters?
❑
❑
❑
Has the facility submitted its annual compliance report to users and DNIQ?
❑
❑
0
❑
(If the facility is = or > 5 MGD permitted flow; Do they operate 24 7 with a certified operator
❑
❑
0
❑
on each shift?
Is the ORC visitat on log ava lable and current)
❑
❑
❑
Is the ORC certifed at grade equal to or h:gher that' the fac-1 tl classification?
❑
❑
❑
Is the backup operator certifed at one grade less cr greater than the facility classification?
R
❑
❑
❑
Is a copy of the current NPDES permit ava'lable on s-te?
0
❑
❑
❑
Facility has copy of previous year's Annual Rep(:rt an file for rev-ew?
❑
❑
0
❑
Comment:
Flow Measurement - Effluent
Yes No NA NE
# Is flow meter used for reporting?
M
❑
❑
❑
Is flow meter calibrated annually?
❑
❑
❑
Is the flow meter operational?
❑
❑
❑
(if un-ts are separated: Does the chart recorder match the flow meter?
❑
❑
M
❑
Comment Effluent flow meter at Outfall 002 was last calibrated on December 20. 2018.
Pump Station - Influent
Yes No NA NE
1s the pump wet well free of bypass lines or structures?
❑
❑
❑
Is the wet well free of excessive grease?
❑
❑
❑
Are all pumps present?
❑
❑
❑
Are all pumps operable?
M
❑
❑
❑
Are float controls operable?
0
❑
❑
❑
Is SCADA telemetry available and operational?
❑
❑
0
❑
Is audible and visual alarm available and operat onaP
M
❑
Cl
❑
Comment: At domestic wastewater treatment plant. Two pumps at the lift station.
Equalization Basins
Yes No NA NE
Is the basin aerated?
0
❑
❑
❑
Is the basin free of bypass lines or structures to the natural environment?
M
❑
❑
❑
Is the basin free of excessive grease?
0
❑
❑
❑
Are all pumps present?
0
❑
❑
❑
Rage# 4
Permit: NCO038377 Owner • Facility: Maya Steam Eiectrxa Power Plant
Inspection Dale: 0312012019 Inspection Type: Compliance Evaluation
Equalization Basins Yes No NA NE
Are all pumps operable?
0
❑
❑
❑
Afe float controls operable?
0
❑
❑
❑
A,e audible and visual alarms operable?
E
❑
❑
❑
# Is basin sizeivolume adequate?
E
❑
❑
❑
Comment: At domestic wastewater treatment plant. One Pumpat the EO basin
Aeration Basins
Yes No NA NE
Mode of operation
Ext. Air
Type of aeration system
Surface
Is the basin free of dead spots?
0 ❑
❑
❑
Are surface aerators and mixers operational?
E ❑
❑
❑
Are the diffusers operational?
N ❑
❑
❑
Is the foam ti*e proper color for the treatment process)
0 ❑
❑
❑
Does the foam cover less than 25% of the basin s surface?
0 ❑
❑
❑
Is the DO level acceptable?
N ❑
❑
❑
Is the DO level acceptable?(1.0 to 3.0 mgli)
0 ❑
❑
❑
Comment- At domestic wastewater treatment plant,
Secondary Clarifier
Yes No NA NE
Is the clarifier free of black and odorous wastewater)
0
❑
❑
❑
Is the site free of excessive buildup of solids in center well of circular --lar,f:e,?
❑
❑
❑
Are weirs level?
❑
❑
❑
Is the site free of weir blockage?
E
❑
❑
❑
Is the site free of evidence of short-orcuiting?
E
❑
❑
❑
Is scum removal adequate?
E
❑
❑
❑
Is the site free of excessive floating sludge?
❑
❑
❑
Is the drive unit operational?
❑
❑
❑
Is the return rate acceptable (low turbulence;?
0
❑
❑
❑
Is the overflow clear of excessive solidslpin floc?
0
❑
❑
❑
Is the sludge blanket level acceptable? (Approximately 'l, of the s de-nall depth)
0
❑
❑
❑
Comment At domestic wastewater treatment plant.
Disinfection -Tablet Yes No NA NE
Page# 5
Permit: NC0039377
Inspection Date: 034M20 t 9
Disinfection -Tablet
Are tablet chlorinators cpe•ational-,
Are the tablets the proper s ze and type'
Number of tubes in use?
Is the level of chlorine residual acceptable?
Is the contact chamber free of growth, or sludge buildup?
Is there chlorine residual prior to de -chlorination?
Comment. At domestic wastewater treatment plant.
Owner • Facility: %layo Steam Electric Power Flant
Inspection Type: Compliance Evaluation
Yes No NA NE
M ❑ ❑ ❑
❑ ❑ ❑
2
• ❑ ❑ ❑
• ❑ ❑ ❑
❑ ❑ M ❑
pages 6