Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20190508 Ver 1_Wetland Impact Summary Sheet.20190418_20190418
WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Bank No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Stabilization (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (tt) (ft) SITE #1 N/A 18" x 12' Culvert Extension 0.01 SITE #1 N/A Dewatering 0.01 TOTALS": 0.01 0.01 `Rounded totals are sum of actual impacts NOTES: �