Loading...
HomeMy WebLinkAbout20190508 Ver 1_Wetland Impact Summary Sheet.20190418_20190418WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Bank No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Stabilization (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (tt) (ft) SITE #1 N/A 18" x 12' Culvert Extension 0.01 SITE #1 N/A Dewatering 0.01 TOTALS": 0.01 0.01 `Rounded totals are sum of actual impacts NOTES: �