Loading...
HomeMy WebLinkAbout20180542 Ver 1_WRC Comments_32010211Carpenter,Kristi From: Wilson, Travis W. Sent: Wednesday, February 13, 2019 3:16 PM To: Lane, Stephen Cc: Ward, Garcy; Thomas.A.Steffens@usace.army.mil Subject: RE: Bridge 249 on Hawkins Beach Road in Beaufort County. WRC does not object to the contractor pulling sheet pile up to 2 weeks after the February 15 in water work moratorium for this project. Travis W. Wilson Eastern Region Highway Project Coordinator Habitat Conservation Program NC Wildlife Resources Commission 1718 Hwy 56 West Creedmoor, NC 27522 Phone: 919-707-0370 Fax: 919-528-2524 Travis.Wilson(cDncwildlife.ora ncwildlife.ora � � � TuI�E From: Lane, Stephen Sent: Tuesday, February 12, 2019 4:25 PM To: Wilson, Travis W. <travis.wilson@ncwildlife.org> Subject: FW: Bridge 249 on Hawkins Beach Road in Beaufort County. Hi Travis, Can you give me a call on this request so that we can discuss the issue? Try me at the office first at (252) 808-2808 ext. 208, but if you are unable to reach me there, please feel free to call me on my cell phone (252) 617-3191. Thanks, Stephen From: Horner, Kenneth V Sent: Tuesday, February 12, 2019 9:38 AM To: Lane, Stephen <stephen.lane@ncdenr.�ov> Cc: Lane, Heather C<hclane@ncdot.�ov>; Lentine, Sarah F<sflentine@ncdot.�ov> Subject: Bridge 249 on Hawkins Beach Road in Beaufort County. Stephen, Per our earlier conversation regarding Bridge 249 on Hawkins Beach Road in Beaufort County, the contractor has asked to have some relief on the front end of the moratorium in order the to remove sheeting from around the end bents of the permanent structure. Like we discussed yesterday, the contractor will install the sheeting prior to the beginning of the moratorium to facilitate the unclassified structure excavation and would like to remove the sheeting up to 2 weeks after the moratorium is in effect. While the sheeting is still in place, the contractor will complete all work required by the plans for this structure. Once all work has been completed, the contractor will remove all of the sheeting using a track excavator or the crane, no vibratory hammer will be used to remove the sheeting." Sincerely, Kenny Horner � Assistant Resident Engineer SEPI Engineering for The Department of Transportation 1710 N. Memorial Drive Greenville, N.C. 27834 Office 252-439-2976 Direct 252-671-1510 kvhorner(a�ncdot. o�v Connect with us: LinkedIn I Twitter I Facebook Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.