Loading...
HomeMy WebLinkAbout20180542 Ver 1_Bridge 249 over Duck Creek in Beaufort County_20190208Carpenter,Kristi From: Lane, Stephen Sent: Friday, February 08, 2019 2:53 PM To: Steffens, Thomas A CIV USARMY CESAW (USA); Ward, Garcy Subject: FW: Bridge 249 over Duck Creek in Beaufort County FYI From: Lentine, Sarah F Sent: Thursday, February 07, 2019 3:51 PM To: Lane, Stephen <stephen.lane@ncdenr.gov> Subject: RE: Bridge 249 over Duck Creek in Beaufort County Thank you! Sarah F. Lentine, PE From: Lane, Stephen <stephen.lane@ncdenr.�ov> Sent: Thursday, February 7, 2019 3:50 PM To: Lentine, Sarah F <sflentine@ncdot.�ov> Cc: Horner, Kenneth V<kvhorner@ncdot.�ov>; Lane, Heather C<hclane@ncdot.�ov> Subject: RE: Bridge 249 over Duck Creek in Beaufort County Hi Sarah, It was written such that the if work on the permanent bridge was completed between February 15 and September 30 (during the moratorium), and the temporary detour was no longer needed, then the NCDOT and their contractor has 90 days after the moratorium (beginning on October 15t) to completely remove all portions of the detour. Hope this helps and please let me know if I can be of further assistance. Thanks, Stephen From: Lentine, Sarah F Sent: Thursday, February 07, 2019 2:49 PM To: Lane, Stephen <stephen.lane@ncdenr.�ov> Cc: Horner, Kenneth V<kvhorner@ncdot.�ov>; Lane, Heather C<hclane@ncdot.�ov> Subject: FW: Bridge 249 over Duck Creek in Beaufort County Stephen, Looking for clarification on this. Do we have 90 days after Feb 15th or Sept 30th to get the temp structure out? Thanks, Sarah F. Lentine, PE From: Lane, Heather C <hclane@ncdot.�ov> Sent: Thursday, February 7, 2019 2:46 PM To: Lentine, Sarah F <sflentine@ncdot.�ov> Cc: Horner, Kenneth V <kvhorner@ncdot.�ov> Subject: RE: Bridge 249 over Duck Creek in Beaufort County It should be 90 days after. That's what was requested and discussed. I would think it would be February 15th plus 90 days. You can ask Stephen for clarification. Thanks, Heather From: Lentine, Sarah F Sent: Thursday, February 07, 2019 1:07 PM To: Lane, Heather C <hclane@ncdot.�ov> Cc: Horner, Kenneth V <kvhorner@ncdot.�ov> Subject: RE: Bridge 249 over Duck Creek in Beaufort County Heather Kenny and I are interpreting this differently and need your help. Th� t�mpoxary d�tour arYd asso�iated temparary fi11 s�a11 b� �t is na lon�er n�e�ied an� di�po��d of at a� approved high � accurs ��il� t�e rn�ratori�rm re��r�nced in ��nditior� I�a. 1 de�oux �ha11 �� ��o��d xn its �ntirety withirt �� da�s �fth� a�pr�u� hig� �rat�nd �ite. Does this mean we add or subtract 90 days to Sept 3oth for them to have the temp bridge out? Thanks, Sarah F. Lentine, PE From: Lane, Heather C <hclane@ncdot.�ov> Sent: Tuesday, August 7, 2018 8:59 AM To: Lentine, Sarah F <sflentine@ncdot.�ov> Cc: Horner, Kenneth V <kvhorner@ncdot.�ov> Subject: FW: Bridge 249 over Duck Creek in Beaufort County Please see the attached CAMA permit. Thanks, Heather From: Brittingham, Cathy Sent: Monday, August 06, 2018 4:29 PM To: Robert Turnbull (rturnbull@esiinc.cc) <rturnbull@esiinc.cc>; Lane, Heather C <hclane@ncdot.�ov> Cc: Lane, Stephen <stephen.lane@ncdenr.�ov>; Ward, Garcy <�arcy.ward@ncdenr.�ov>; Tom Steffens <Thomas.A.Steffens@usace.army.mil>; Johnson, Jay B <ibiohnson@ncdot.�ov> Subject: Bridge 249 over Duck Creek in Beaufort County Hello, Please find attached CAMA Permit No. 85-18 authorizing the construction of Bridge No. 249 over Duck Creek on SR 1336 (Hawkins Beach Road) in Beaufort County. A paper copy will be sent to NCDOT in Greenville. Please let me or Stephen Lane know if you have any questions or concerns. Sincerely, Cathy Brittingham Cathy Brittingham, Transportation Project Coordinator N.C. Division of Coastal Management (919) 707-9149 phone cathy.brittingham(a�ncdenr.gov Mailing Address: _ c/o DWR Wetlands Unit 1617 Mail Service Center Raleigh, NC 27699-1617 Physical Address: 512 North Salisbury Street Archdale Building 12th Floor, Room 1204G Raleigh, NC 27604 Please visit https://deq.nc.qov/about/divisions/coastal-manaqement/ for more information about the N.C. Division of Coastal Management. E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. Thc temporary detour and associated temporarp fill sliall bc mn�ovcd in its entirety within 90 days after it is no longex needed and disposed of at an approved high ground si[e. However, if this CimePrame occurs while the mora[ori�m rofcrenced in Cmidilion t�o. 1 of �his' pemiit is in cffect, Ihen lhe tempor¢r}' de[our shall bc �emoved in its e�tirety within 90 days of ihc moratorium cnd datc and disposed of at an approvcd high @round site.