Loading...
HomeMy WebLinkAbout20180542 Ver 1_Beaufort 249_hyd_permit_package (002)_20190801North Carolina Department of Transportation .° °, Highway Stormwater Program STORMWATER MANAGEMENT PLAN (Version 2.07; Released October 2016) 1 L FOR NCDOT PROJECTS WBS Element: 17BP.2.R.85 TIP No.: County(ies): Beaufort Page 1 of 2 General Project Information WBS Element: 17BP.2.R.85 ITIP Number: Project Type: Bridge Replacement Date: 6/28/2018 NCDOT Contact: Robert T. Turnbull, Environmental Services, Inc. Contractor / Desi ner: I HNTB North Carolina, P.C. / James A. Byrd, PE Address: 4901 Trademark Dr. Raleigh, NC 27610 Address: 343 E. Six Forks Road Suite 200 Raleigh, NC 27609 Phone: 919 212-1760 Phone: 919 424-0437 Email: rturnbull@esinc.cc Email: jab rd hntb.com City/Town: Bath Count ies : Beaufort River Basin(s): Tar -Pamlico I ICAMA County? I Yes Wetlands within Project Limits? Yes Project Description Project Length (lin. miles or feet): 0.13 Surrounding Land Use: JRural Residential and Agriculture Project Built -Upon Area ac. Proposed Project 1.2 ac. ExistingSite 0.5 ac. Typical Cross Section Description: 2 - 10' asphalt paved lanes with 2' paved shoulders, 4' grass shoulders. 2 - 10' asphalt paved lanes with grass shoulders. Wetlands are present in all four quadrants. CAMA wetlands are distinguished from 404 wetlands. Annual Avg Daily Traffic (veh/hr/day): Design/Future: 530 Year: 2011 Existing: 1060 Year: 2031 General Project Narrative: (Description of Minimization of Water Quality Impacts) State project 17BP.2.R.85 involves the replacement of Beaufort County Bridge #060249 on SR 1336 (Hawkins Beach Rd.) over Duck Creek. The existing bridge consists of 1 @ 17' - 10", 1 @ 17' - 1", and 1 @ 17' - 9" timber deck on timberjoists, steel caps, and timber piles. It is to be replaced with a 1 @ 30' - 0" and 1 @ 55' - 0" 21" cored slab (85' total length, 33' total width) at the same location. To facilitate the construction of the proposed bridge, an onsite detour is proposed on the downstream side of SR 1336. The project includes 0.110 miles of roadway improvements. In accordance with Tar -Pamlico River Buffer Regulations, the proposed bridge does not contain deck drains. All stormwater from the bridge and approaches will be collected by a storm drainage system and discharged into the wetlands. The drainage system will outlet outside of the buffer limits in the northeastern quadrant at -L- station 16+18 LT, with the outlet pipe set at 0.1 % to reduce velocity into the wetlands. A Class 'B' rip rap pad was specified at the drainage outlet to lower discharge velocity and to minimize impacts. No defined roadside ditches exist that are impacted by the proposed slope stakes. Thus, all existing drainage patterns are maintained in the proposed design. Waterbody Information Surface Water Body (1): Duck Creek NCDWR Stream Index No.: 29-16-(2) NCDWR Surface Water Classification for Water Body Primary Classification: Class SC Supplemental Classification: Nutrient Sensitive Waters (NSW) Other Stream Classification: Impairments: Aquatic T&E Species? Comments: NRTR Stream ID: Buffer Rules in Effect: Tar -Pamlico Project Includes Bridge Spanning Water Body? iYes I Deck Drains Discharge Over Buffer? INo Dissipator Pads Provided in Buffer? INo Deck Drains Discharge Over Water Body? No (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative) (If yes, provide justification in the General Project Narrative) I I lip hWa North Carolina Department of Transportation gSYOYIyY11 Highway Stormwater Program STORMWATER MANAGEMENT PLAN (Version 2.07; Released October 2016) FOR NCDOT PROJECTS WBS Element: 17BP.2.R.85 TIP No.: County(ies): Beaufort Page 2 of 2 Preformed Scour Holes and Energy Dissipators Sheet No. Station & Coordinates (Road and Non Road Projects) Surface Energy Dissipater Type Riprap Type Drainage Area ac Conveyance Structure Pipe/Structure Dimensions (in) Q10 (cfs) V10 (fps) BMP Associated w/ Buffer Rules? 4 -L- Sta. 16+18 LT (1)Duck Creek Riprap Energy Dissipator Basin Class'B' 0.1 Pipe 15 0.8 1.6 Yes 35.462992 /-76.854354 Additional Comments Keter to the NUUU I best Management Practices I oOIboX (ZU14), NGDU I Standards, the Federal HlghWay Administration (FHWA) Hydraulic tnglneering circular No. 14 (Htc-14), I hlra taltlon, Hydraulic Uesign oT tnergy Dissipators for Culverts and Channels (July 2006), as applicable, for design guidance and criteria. STATE OF NORTH CARD INA Te TATE PROJECT 8II88T TOTAL REFERENCE NO. EE SXReM .0 17. B P.2 . R. 85 tn DIVISION OF HI G IE WAYS TR PRO .NO P AFRO .NO. 089CR PT UN 00 17BP.2.R.85 PE S 17BP.2.R.85 ROWiUTIL 1:y ~ �. & BEA UFOR T COUNTY (.11-3 4 S� 6 LOCATION: REPLACE BRIDGE NO.249 OVER DUCK CREEK PERMIT DRAWING SHEET 1 OF 14 o ON SR 1336 (HA WKINS BEACH ROAD) SR 3� 7358 TYPE OF WORK: GRADING, DRAINAGE, PAVING AND STRUCTURE \GO [T1 GOOSE CREEK Q STATE PARK WETLAND AND SURFACE WATER IMPACTS PERMIT VICINITY MAP NO BEGIN PROJECT 17BP.2.R.85 —L— POC STA 13 + 85.00 4 BEGIN BRIDGE END BRIDGE —L— POT STA 16 + 97 +/— MA WEiLpNP —L— POT 17 + 82 +/— m �m s 5=1336_ KAI_ — TO PMILIC2 R � eunA weTUNos ` � �� a. wE uHcs —DET— 6 CM g� KINS _ �� END PRO ECT 17BP.2.R.85 —L— POC STA 20 + 50.00 NOTES: 1. CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II. 2. THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES. 3. SEE SHEET 2B-1 FOR TEMPORARY DETOUR DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURESCONIPLETED V GRAPHIC SCALES DESIGN DATA PROJECT LENGTH Prepared in the Office of: HYDRAULICS ENGINEER 50 25 0 50 100 ADT 2011 = 530 ADT 2031 = 1060 343 E. Six Forks Roatl, Suite 200 G�INTB HNTB NORTH Forks NA, P.C. Raleigh, North Carolina 27609 NC License No: C-1554 HURT STANDARD SPECIFICATIONS K = 10 %2072 PLANS LENGTH OF ROADWAY PROJECT 17BP.2.R.85 = 0.110 MILES D = 60 % DOUGLAS WHEATLEY, PE Ps. SIGNATURE: ® a 50 25 0 50 100 T = 6 % * LENGTH OF STRUCTURE PROJECT 17BP.2.R.85 = 0.016 MILES RIGHT OF WAY DATE: PROJECT ENGINEER V = 60 MPH JANUARY 31, 2018 MONICA J. DUVAL ROADWAY DESIGN ENGINEER e PROFILE HORIZONTAL PROJECT DESIGN ENGINEER * TTST =2% DUAL 4% TOTAL LENGTH OF PROJECT 17BP.2.R.85 = 0.126 MILES O O(HORIZONTAL) 10 5 0 10 20 FUNC CLASS = LETTING DATE: 8R R� V LOCAL AUGUST 8, 2018 HEATHER C. LANE PE PROFILE (VERTICAL) NCDOT CONTACT SUB —REGIONAL TIER SIGNATUREP.E. v� v� WETLAND AND SURFACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 -L- 16+63 to 19+03 21" Cored Slab Bridge < 0.01 < 0.01 < 0.01 1 -L- 16+63 to 19+03 21" Cored Slab Bridge (CAMA) 0.02 < 0.01 < 0.01 1 -DET- 10+57 to 15+03 Temp. Bridge 0.05 0.01 1 -DET- 10+57 to 15+03 Temp. Bridge (CAMA) 0.04 TOTALS*: 0.02 0.09 < 0.01 0.00 < 0.01 < 0.01 0.01 0 0 T 0 *Rounded totals are sum of actual impacts NOTES: Existing channel impacts are measured along the centerline of the stream. Permanent Fill in Wetlands: 167 SF Permanent Fill in Wetlands (CAMA): 888 SF Temporary Fill in Wetlands: 2094 SF Temporary Fill in Wetlands (CAMA): 1892 SF Excavation in Wetlands: 68 SF Excavation in Wetlands (CAMA): 39 SF Hand Clearing in Wetlands (CAMA): 212 SF Permanent Impacts in Surface Water: 12 SF 2016 os os Temporary Impacts in Surface Water: 531 SF RIPARIAN BUFFER IMPACTS SUMMARY IMPACT BUFFER REPLACEMENT SITE NO. STRUCTURE SIZE / TYPE STATION (FROM/TO) TYPE ALLOWABLE MITIGABLE ROAD CROSSING BRIDGE PARALLEL IMPACT ZONE 1 (ft2) ZONE 2 (ft) TOTAL (ft) ZONE 1 (ft) ZONE 2 (ft) TOTAL (ftz) ZONE 1 (ft) ZONE 2 (ft) B1 21" Cored Slab Bridge -L- 17+73 to 18+26 LT X 564 325 889 B2 21" Cored Slab Bridge -L- 16+21 to 17+02 LT X 595 271 866 B3 21" Cored Slab Bridge -L- 15+11 to 16+88 RT X 1043 160 1203 B4 21" Cored Slab Bridge -L- 17+78 to 18+33 RT X 202 155 357 B5 DETOUR BRIDGE -L- 14+86 to 16+82 RT X 3340 240 3580 B6 DETOUR BRIDGE -L- 17+70 to 18+31 RT X 1178 778 1956 TOTAL: 6922 1929 8851 0.0 0.0 0.0 0.0 0.0 Rev. SEP 2016 Jan 2009